General Decision Number: WV080002 07/04/2008 WV2 Superseded General Decision Number: WV20070002 State: West Virginia Construction Type: Building Counties: Barbour, Braxton, Brooke, Cabell, Calhoun, Doddridge, Gilmer, Grant, Hampshire, Hancock, Hardy, Harrison, Jackson, Kanawha, Lewis, Marion, Marshall, Mason, Mineral, Monongalia, Morgan, Ohio, Pendleton, Pleasants, Preston, Putnam, Randolph, Ritchie, Roane, Taylor, Tucker, Tyler, Upshur, Wayne, Webster, Wetzel, Wirt and Wood Counties in West Virginia. BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). See Heavy and Highway Construction General Wage determination for all work in connection with the clearing and grading of site, also all paving incidental to the project, and all incidental water lines, sewers and other utilities to within 5 feet of the building line) Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/21/2008 3 04/11/2008 4 05/02/2008 5 06/20/2008 6 06/27/2008 7 07/04/2008 ASBE0002-003 08/01/2006 BROOKE, HANCOCK, HARRISON, MARION, MARSHALL,MINERAL, OHIO, TYLER AND WETZEL COUNTIES Rates Fringes Asbestos Workers/Insulator Mills, Chemical Plants and Power Plants................$ 29.28 17.06 All other work..............$ 28.12 17.06 SCOPE OF WORK: Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems. ---------------------------------------------------------------- ASBE0080-001 03/05/2007 BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, JACKSON, KANAWHA, LEWIS, MASON, PLEASANTS, PUTNAM, RITCHIE, ROANE, UPSHUR, WAYNE, WIRT AND WOOD COUNTIES. Rates Fringes Asbestos/Insulator Worker........$ 27.83 14.73 SCOPE OF WORK: Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems. ---------------------------------------------------------------- BOIL0045-003 10/01/2007 GRANT COUNTY Rates Fringes BOILERMAKER......................$ 27.71 16.47 ---------------------------------------------------------------- BOIL0154-003 06/01/2008 BROOKE AND HANCOCK COUNTIES Rates Fringes BOILERMAKER......................$ 33.90 22.07 ---------------------------------------------------------------- BOIL0667-001 10/01/2003 BARBOUR, BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, HAMPSHIRE, HARDY, HARRISON, JACKSON, KANAWHA, LEWIS, MARION, MARSHALL, MASON, MINERAL, MORGAN, MONONGALIA, OHIO, PENDLETON, PLEASANTS, PRESTON, PUTNAM, RANDOLPH, RITCHIE, ROANE, TAYLOR, TUCKER, TYLER, UPSHUR, WAYNE, WEBSTER, WETZEL, WIRT AND WOOD COUNTIES. Rates Fringes BOILERMAKER......................$ 29.55 13.79 ---------------------------------------------------------------- BRMD0006-003 06/01/2007 MINERAL COUNTY Rates Fringes BRICKLAYER (Brick, Stone, Marble, Mosaic, Pointers, Caulkers, Artifical, Tilesetters and Terrazzo workers).........................$ 24.25 9.07 ---------------------------------------------------------------- BRWV0001-001 07/01/2006 MARSHALL, OHIO, TYLER AND WETZEL COS. Rates Fringes BRICKLAYER.......................$ 24.00 10.59 TILE SETTER......................$ 24.00 10.59 ---------------------------------------------------------------- BRWV0006-003 06/01/2007 CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT AND WOOD COS. Rates Fringes BRICKLAYER.......................$ 24.51 10.78 TILE SETTER......................$ 24.01 10.78 ---------------------------------------------------------------- BRWV0009-002 12/01/2007 BRAXTON, KANAWHA AND PUTNAM COS. Rates Fringes Bricklayer, Stonemason...........$ 26.69 12.85 Marble, Tile Layer & Terrazzo Worker...........................$ 26.69 12.85 ---------------------------------------------------------------- BRWV0011-001 07/01/2007 BROOKE AND HANCOCK COS. Rates Fringes BRICKLAYER Industrial..................$ 27.11 11.30 All other work..............$ 25.29 11.30 TILE SETTER......................$ 23.39 11.30 ---------------------------------------------------------------- BRWV0015-002 12/01/2007 DODDRIDGE, GILMER, HARRISON, LEWIS, MARION AND UPSHUR COUNTIES Rates Fringes BRICKLAYER Commercial..................$ 27.51 9.67 Industrial..................$ 29.03 9.67 ---------------------------------------------------------------- BRWV0015-005 06/01/2007 BARBOUR, DODDRIDGE, GILMER, HARDY, HARRISON, LEWIS,MARION, MONONGALIA, PRESTON, TAYLOR,TUCKER AND UPSHUR COUNTIES Rates Fringes Cement Masons: Commerial...................$ 27.51 9.67 Industrial..................$ 29.03 9.67 ---------------------------------------------------------------- BRWV0015-006 12/01/2007 CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT, AND WOOD Counties Rates Fringes Marble & Tile Finisher...........$ 21.40 7.07 ---------------------------------------------------------------- CARP0003-003 12/07/2004 BROOKE, HANCOCK, MARSHALL (North of 39 degrees 46' latitude) and OHIO COUNTIES Rates Fringes Carpenters: (carpet, drywall, lather, and soft tile installers)......................$ 21.31 11.81 ---------------------------------------------------------------- CARP0302-001 12/07/2004 BUILDING CABELL and WAYNE COUNTIES Rates Fringes Carpenter & Soft Floor Layer.....$ 23.85 10.40 PILEDRIVERMAN....................$ 24.40 10.40 ---------------------------------------------------------------- CARP0476-001 12/07/2004 BRAXTON, DODDRIDGE, GILMER, HARRISON, LEWIS, MARION, UPSHUR, and WEBSTER COUNTIES Rates Fringes CARPENTER (carpet, drywall and soft tile installers)........$ 23.83 10.30 Piledriver.......................$ 24.38 10.30 ---------------------------------------------------------------- CARP0604-003 12/01/2005 BARBOUR, MONOGALIA, PRESTON, RANDOLPH, TAYLOR, and TUCKER COUNTIES Rates Fringes Carpenter......................$ 23.98 10.84 ---------------------------------------------------------------- CARP0899-001 06/01/2003 CALHOUN, PLEASANTS, RITCHIE, TYLER, WETZEL, WIRT, and WOOD COUNTIES Rates Fringes Carpenters: (Soft Tile & Carpet Installers, Drywall installers)......................$ 24.03 7.99 PILEDRIVERMAN....................$ 24.28 8.80 ---------------------------------------------------------------- CARP1024-003 12/01/2006 GRANT, HAMPSHIRE, HARDY, AND PENDLETON COUNTIES Rates Fringes CARPENTER (dry wall hangers and soft layers).................$ 23.88 12.35 ---------------------------------------------------------------- CARP1024-006 12/10/2006 MINERAL AND MORGAN COUNTIES Rates Fringes CARPENTER........................$ 23.88 12.35 ---------------------------------------------------------------- CARP1159-001 12/01/2006 JACKSON and MASON COUNTIES Rates Fringes CARPENTER........................$ 23.88 12.35 ---------------------------------------------------------------- CARP1207-006 12/01/2005 KANAWHA, PUTNAM, and ROANE COUNTIES Rates Fringes CARPENTER........................$ 23.98 10.84 Pile Driver......................$ 24.53 10.84 ---------------------------------------------------------------- CARP1519-001 12/01/2006 CABELL AND WAYNE COUNTIES Rates Fringes MILLWRIGHT.......................$ 22.92 11.83 ---------------------------------------------------------------- CARP1755-001 12/01/2006 BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, KANAWHA,LEWIS, MARION, MASON, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER, UPSHUR, WETZEL, WIRT AND WOOD COUNTIES Rates Fringes MILLWRIGHT.......................$ 27.26 14.20 ---------------------------------------------------------------- CARP1871-019 05/01/2001 BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES Rates Fringes MILLWRIGHT.......................$ 22.21 8.54 ---------------------------------------------------------------- CARP2264-001 01/01/2002 BROOKE, HANCOCK, MARSHALL, OHIO, AND WETZEL COUNTIES Rates Fringes PILEDRIVERMAN....................$ 23.82 8.48 ---------------------------------------------------------------- ELEC0026-010 11/07/2005 HARDY COUNTY Rates Fringes ELECTRICIAN......................$ 21.71 7.80 ---------------------------------------------------------------- ELEC0141-001 09/01/2007 BROOKE (Buffalo Twp. only) MARSHALL, OHIO AND WETZEL COUNTIES Rates Fringes CABLE SPLICER....................$ 25.41 18.17 ELECTRICIAN......................$ 25.16 18.17 ---------------------------------------------------------------- ELEC0141-002 09/01/2005 BROOKE (Buffalo Twp. only), MARSHALL, OHIO, AND WETZEL COUNTIES Rates Fringes Line Construction: Cable Splicer...............$ 25.37 15.33 Groundsman..................$ 20.10 15.33 Lineman, Equipment Operator.$ 25.12 15.33 ---------------------------------------------------------------- ELEC0246-003 10/29/2007 BROOKE (Except Buffalo Township), HANCOCK COUNTIES Rates Fringes ELECTRICIAN......................$ 31.00 18.29 FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday ---------------------------------------------------------------- ELEC0246-005 11/01/2004 BROOKE (Except Buffalo Twp.)AND HANCOCK COUNTIES Rates Fringes Line Construction: Groundman...................$ 18.70 51.5%+a Lineman, Line Equipment Operator, and Truck Driver..$ 28.00 51.5%+a FOOTNOTE: a. 1-1/2 Paid Holidays: The last scheduled workday prior to Christmas Day and 4 Hours on Good Friday. ---------------------------------------------------------------- ELEC0307-003 12/01/2007 GRANT, HAMPSHIRE, MINERAL and MORGAN COUNTIES Rates Fringes ELECTRICIAN......................$ 26.20 13.25 ---------------------------------------------------------------- ELEC0307-004 12/03/2007 MINERAL COUNTY Rates Fringes Equipment Operator...............$ 24.89 13.25 Linemen..........................$ 26.20 13.25 TRUCK DRIVER.....................$ 17.03 13.25 ---------------------------------------------------------------- ELEC0317-001 05/30/2007 CABELL, MASON AND WAYNE COUNTIES Rates Fringes CABLE SPLICER....................$ 29.42 17.39 ELECTRICIAN......................$ 28.02 17.39 ---------------------------------------------------------------- ELEC0317-009 09/04/2005 BRAXTON, CABELL, CALHOUN, GILMER, KANAWHA, MASON, PUTNAM, ROANE, AND WAYNE COUNTIES Rates Fringes Line Construction: Cable Splicer...............$ 27.70 15.5%+5.50 Equipment Operator..........$ 22.62 15.5%+5.50 Groundman...................$ 13.39 15.5%+5.50 Lineman.....................$ 26.34 15.5%+5.50 ---------------------------------------------------------------- ELEC0466-001 06/01/2006 BRAXTON, CALHOUN, GILMER, KANAWHA, PUTNAM, ROANE AND WEBSTER COUNTIES Rates Fringes CABLE SPLICER....................$ 32.32 12.60 ELECTRICIAN......................$ 29.38 12.60 ---------------------------------------------------------------- ELEC0596-001 06/01/2007 BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA, PENDLETON, PRESTON, RANDOLPH, TAYLOR, TUCKER, AND UPSHUR COS. Rates Fringes CABLE SPLICER....................$ 30.51 16.53 ELECTRICIAN......................$ 27.74 16.53 ---------------------------------------------------------------- ELEC0596-002 06/01/2006 DODDRIDGE, LEWIS, MARION, AND UPSHUR COUNTIES Rates Fringes Line Construction: Cable Splicers..............$ 26.46 15.67 Groundman & Truck Drivers...$ 19.24 15.67 Lineman & Equipment Op......$ 24.05 15.67 ---------------------------------------------------------------- ELEC0968-002 06/01/2007 JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES Rates Fringes Line Construction: Groundman...................$ 21.37 3%+16.16 Lineman, Equipment Operator, and Cable Splicer.$ 27.76 17.09 ---------------------------------------------------------------- ELEC0968-003 06/01/2007 JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES. Rates Fringes ELECTRICIAN......................$ 27.76 17.24 ---------------------------------------------------------------- ELEV0006-002 01/01/2008 BROOKE, HANCOCK, MARION, MARSHALL, OHIO AND WETZEL COUNTIES: Rates Fringes Elevator Constructor.............$ 37.65 16.285+A&B Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Verterans Dayl; Thanksgiving day; the Friday after Thanksgiving Day; and Christmas Day. Footnotes: a. Employee contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit. ---------------------------------------------------------------- ELEV0048-001 01/01/2008 BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, KANAWHA, LEWIS, MASON, MINERAL, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER, PSHUR, WAYNE, WIRT AND WOOD COUNTIES Rates Fringes Elevator Constructor.............$ 36.30 16.285 PAID HOLIDAYS: a. New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day. Employer contributes 8% of the basic hourly rate for 5 years or more of service or 6% of the basic hourly rate for 6 months to 5 years of service as vacation pay credit. ---------------------------------------------------------------- ENGI0132-001 06/01/2008 POWER EQUIPMENT OPERATORS: Rates Fringes Power equipment operators: GROUP 1.....................$ 28.26 15.98 GROUP 2.....................$ 27.91 15.98 GROUP 3.....................$ 26.91 15.98 GROUP 4.....................$ 21.41 15.98 GROUP 1: All cranes, derricks and tower cranes with 180 ft. of boom including mast and jibs or lifting capacity of 100 tons and hoists 30,000 pound line pull or more, cableways. GROUP 2: Those operating cranes, derricks, tower cranes and similar equipment with a lifting capacity of 15 tons and over, boom trucks, all shovels, draglines, clamshells, caisson drilling rigs. Mechanic with tools with 3/4 inch drive and below. GROUP 3: All tow boats or work boats, backhoes,end loaders, gradalls, all other mechanics, side boom cat and all cranes and concrete mixing plants, core drills, two drum hoist, concrete pump, mechanically operated laser screed, self contained hydraulic air drills, directional drill operator, standard gauge locomotive, rubber tired scraper, power grader dozer, tractor and pan, push cat, asphalt and concrete paving equipment operator, compactor, compactor with blade, material hauler, articulating equipment, material hoist, wellpoint system, forklift, trencher, air tugger "A" frame truck, grease truck operator, all tractors. GROUP 4: Fireman, deckhand, elevators, ross carrier, air compressor, high compression equipment, load handler, "bobcat" or skid steer loaders, greaser tender, two bag and under concrete mixer, assistant engineer on standard gauge locomotives, locomotive cranes, truck and crawler cranes, brakeman on cranes used for moving rail cars (when equip- ment is moving cars only), rollers, Barber green loader, mechanic tender, welding machines gasoline powered, light plants, generators, conveyors, mechanical heaters and pump operators, masonry hoist and all farm type tractors. ---------------------------------------------------------------- IRON0301-001 06/01/2008 Rates Fringes Ironworkers: 50 miles from the Kanawa county Courthouse to include the counties of Braxton, Kanawha, Putnam, Randolph (southeast portion of the County to include the townships of Cheat Bridge, Elkwater, Huttonsville, Mingo, Monterville and Valley Head) and Wesbter Counties..$ 24.08 16.24 ---------------------------------------------------------------- IRON0549-001 12/01/2007 BARBOUR (north west third of county to include the Twps. of Philippi); BROOKE; HANCOCK; HARRISON; MARION; MARSHALL; MONONGALIA; OHIO; TAYLOR; TYLER AND WETZEL COUNTIES Rates Fringes IRONWORKER.......................$ 27.75 15.69 ---------------------------------------------------------------- IRON0568-003 05/01/2008 BARBOUR (Remainder of County), GRANT, MORGAN, PENDLETON, PRESTON, RANDOLPH (Remainder of County) AND TUCKER COUNTIES Rates Fringes IRONWORKER.......................$ 25.83 11.60 ---------------------------------------------------------------- IRON0568-007 05/01/2006 HAMPSHIRE, HARDY AND MINERAL COUNTIES Rates Fringes IRONWORKER.......................$ 23.54 10.16 ---------------------------------------------------------------- IRON0769-005 06/01/2008 CABELL AND WAYNE COUNTIES Rates Fringes Ironworkers: ZONE 1: 0-10 miles from Union Hall.$ 27.12 17.07 ZONE 2: 10-50 miles from Union Hall.......................$ 27.52 17.07 ZONE 3: 50 miles & over from Union Hall.................$ 29.12 17.67 ---------------------------------------------------------------- IRON0787-004 06/01/2007 CALHOUN, DODDRIDGE, GILMER, JACKSON, LEWIS, MASON, PLEASANTS, RITCHIE, ROANE, UPSHUR, WIRT AND WOOD COUNTIES Rates Fringes Ironworkers:.....................$ 26.27 15.58 ---------------------------------------------------------------- LABO0379-003 12/01/2007 HAMPSHIRE, MARION, MINERAL, MONONGALIA, MORGAN, PRESTON AND TAYLOR COUNTIES Rates Fringes Laborers: GROUP 1.....................$ 18.93 8.60 GROUP 2.....................$ 19.29 8.60 GROUP 4.....................$ 19.72 8.60 LABORER CLASSIFICATIONS GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer, Flagman. GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, Grade checker, Pavement buster operators. GROUP 3: Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner and Blacksmith. ---------------------------------------------------------------- LABO0543-001 06/01/2008 CABELL, MASON AND WAYNE COUNTIES Rates Fringes Laborers: GROUP 1:....................$ 23.21 10.40 GROUP 2:....................$ 23.70 10.40 GROUP 3:....................$ 24.01 10.40 LABORER CLASSIFICATIONS GROUP 1: Laborer, Carpenter tender, Flagmen, Water boy, Fire watch, Demolition worker, Landscape laborer. GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper Operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & Hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover,Grade checker. GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner. ---------------------------------------------------------------- LABO0809-002 07/01/2004 BROOKE AND HANCOCK COUNTIES Rates Fringes Laborers: GROUP 1....................$ 21.00 5.45 GROUP 2....................$ 21.00 5.45 GROUP 3....................$ 21.00 5.45 GROUP 4....................$ 22.00 5.45 GROUP 5....................$ 22.00 5.45 GROUP 6....................$ 22.00 5.45 GROUP 8....................$ 22.00 5.45 GROUP 9....................$ 22.00 5.45 GROUP 10....................$ 22.00 5.45 GROUP 11....................$ 22.00 5.45 GROUP 1 - Carpenter Tender; Flagperson; General laborer; Landscaper; Toolroom person; Janitor; Warehousemen; Drinking Water Supplier and Hazardous Waste Level D. GROUP 2 - Brick Handler; Tender for Brick Mason, Plasterer, Stonemason & Tile Setter; Mortarman for Mason & Plasterer; Man Mixing Cement for Cement Finisher; Scaffold Builder; Mortar Mixer Machine Operator; Forklifts; Hazardous Waste Level C; Lead Abatement; Fork Trucks; Walk-Behind Concrete Saw; Form Setters; Epoxy Laborers; Paving Brick Laborers; Dry Block; Pre-Cast; Lagging; Decorate Blocks and Sand Stone. GROUP 3 - Concrete Buster; Jack Hammer; Air Spaces; Chipping Hammer; Air Tamper; Vibrator; Power Buggy; Concrete Saw; Power Saw; Sandblaster; Acetylene Burner; Scuba Diver; Panel Cleaning Machine Operator; Power Driven Tools; Air Pump; Air Blow Pipe; Pipelayer & Tender Working in Ditch or Tunnel; Hand Spikers on Railroads and Laborer Handling Concrete for test or working with Tar; Acid or Creosote; Asbestos 2" and under; Gasoline Pump; Shop Vac (wet or dry); Skid Steers; Hazardous Waste Level B; Fire Hose; High Pressure Water Hose; Super Suckers; Vacuum Truck and Hose Laborers, Core Drillers; Drilling for Anchor Bolts, Dowel Rods and Pins; GROUP 4 - Laser Beam: $.35 per Hour above the Laborers classification with which he is or she is working. GROUP 5 - Work Pertaining to or in connection with & Repair of Stoves, Blast Furnaces, Basic Oxygen Process Furnaces; Steeples & Stacks; Annealing Process Furnaces; Kilns, Soaking Pits, Coke Batteries on Industrial Work; (Employer agrees to pay One Dollar ($1.00) per hour above prevailing Group 5 rate Laborers working with crafts receiving hot pay, including working conditions granted to other crafts); Hazardous Waste Level A; Ram cutters on Industrial work and anything pertaining to, such as expansion joints etc. GROUP 6 - Demolition of Stacks: A - 50' to 100' B - 100' to 150' C - Over 150' Rates apply when servicing or working with other crafts receiving high time or working in areas subject to free fall. GROUP 7 - Blasterman & Tender; Bellman & Lancer, All Bottom Men in Blast Furnaces, Stacks, Stoves & Dust Catchers; Mud Man & Laborers working with carbon brick and handling Bottom Block on Blast Furnaces, Stacks, Stoves & Dust Catchers GROUP 8 - Ditches, Trenches, Caissons & Coffers Over 6' deep Open Top GROUP 9 - Miners including Caissons & Coffers, Horizontal or Underground, Mucking Machine Operator GROUP 10 - Tunnel laborers, Muckers including caissons and Coffers, Horizontal and Underground. GROUP 11 - Gunnite Nozzleman & Gunnite Machine Operator - Grout Nozzleman & Grout Machine Operator Level A: Protective equipment is required when the area has been determined to contain extremely toxic contaminants or contaminants unknown but may be expected to be extremely toxic and/or immediately dangerous to life and health (IDLH). This ensemble includes a fully encapsulated chemical suit (moon suit), Self-contained Breathing Apparatus (SCBA), or Airline Fed Respirator and various types and numbers of boots and gloves; Cool vest and voice-activated radios are optional equipment sometimes worn, Level A ensembles provide the highest level of protection from contaminants, but places the greatest physicals and mental stress on the worker. The claustrophobic environment of the moon suit causes anxiety in most people, which greatly increases the already inherent heat stress problems. Also this ensemble reduces vision, mobility, dexterity and communication capacity, all of which increases the risk of nomal job-related injuries; i.e., slips, falls, caught between, etc. Level B: Protective equipment includes a chemically resistent splash suit and a SCBA or Airline Respirator. This ensemble is required when the situation is very hazardous, such as oxygen deficient atmospheres, IDLH atmospheres, or confined space entries, but the risk of skin exposure is not as great as in Level A situation. The Level B ensemble gives the second highest level of protection, but also puts physical stress on the worker; primarily heat stress, reduced vison, dexterity and mobility directly attributable to wearing of the prtective equipment. Therefore, in addition to the hazardous material, the hazard of normal job-related injuries is greatly increased. Level C: Protective equipment includes a protective suit and an Air Purifying Respirator (APR) with the appropriate filter canisters. The ensemble is used when the contaminats are reliably known not to be hazardous to the skin and not IDLH (Immediaely Dangerous to Life and Health) and correct filter protection is available. This ensemble offers adequate protection for many jobs. Heat stress may be a problem due to the suit and respiration is more difficult due to the inherent restrictions to breathing in an APR. Also, normal job-related injury risk will be nearly as high as for Level B equipment. Level D: Type clothing to be worn only in established "safe zones" may consist of normal wokr clothes to normal skin protection such as gloves, face shields, goggles, coveralls and occasionally respiratory protection. ---------------------------------------------------------------- LABO0984-001 12/01/2007 BARBOUR BRAXTON, DODRIDGE, GILMER, GRANT, HARDY, HARRISON, LEWIS, PENDLETON, RANDOLPH, TUCKER, UPSHUR, and WEBSTER COUNTIES Rates Fringes LABORER GROUP 1.....................$ 19.72 8.60 GROUP 2.....................$ 19.29 8.60 GROUP 3.....................$ 19.72 8.60 LABORER CLASSIFICATIONS GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer, Flagman. GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, Grade checker, Pavement buster operators. GROUP 3: Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner and Blacksmith. ---------------------------------------------------------------- LABO1085-001 06/01/2008 CALHOUN, JACKSON, PLEASANTS RITCHIE, TYLER, WIRT AND WOOD COUNTIES Rates Fringes Laborers: GROUP 1:....................$ 20.32 10.25 GROUP 2:....................$ 20.62 10.25 GROUP 3:....................$ 20.97 10.25 LABORER CLASSIFICATIONS GROUP 1: Laborer, Carpenter Tender, Flagmen, Water Boy, Fire watch, Demolition worker, Landscape laborer. GROUP 2: Powderman tender, Semi-skilled laborer, Scoffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening, Hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Moterized Buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover. GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner. ---------------------------------------------------------------- LABO1149-001 12/01/2007 MARSHALL, OHIO AND WETZEL COUNTIES Rates Fringes Laborers: GROUP 1:....................$ 19.72 9.90 GROUP 2:....................$ 19.72 9.90 GROUP 3:....................$ 20.22 9.90 LABORER CLASSIFICATION GROUP 1: Laborers, Carpenter tender, Flagmen, Water boy, Demolition worker, Deep ditch, Tool room attendants, Fire watch and Landscape laborer. GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders grade checker, Signal man, Brick masons tenders, Plasterers tenders, Cement masons tenders, Stone masons tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrater operators, Pavement buster operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole diggers operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Batch house scale operators, Workmen working with acid mortar, Mastic asphalt and acid brick, Workmen working in acid and with cresote, Nozzlemen for gunnite or sandblasting, Demolition worker, Ride or walk roller tampers, Deep ditch vertical 6 ft. or more, Scaffolding work over 50 ft. (inside or out), Asbestos abatement laborer, Deep ditch, Toxic & hazardous waste removal laborer, Lead-based paint removal laborer. GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner. ---------------------------------------------------------------- LABO1353-001 12/01/2007 KANAWHA, PUTNAM AND ROANE COUNTIES Rates Fringes Laborers: GROUP 1.....................$ 20.82 9.90 GROUP 2.....................$ 21.44 9.90 GROUP 3.....................$ 22.28 9.90 GROUP 1: Laborer; Carpenter Tender; Water Boy; Demolition Worker; Fire Watch; Landscape Laborer; Flagmen. GROUP 2: Powderman Tender; Semi-Skilled Laborer; Scaffold Builder; Grade Checker; Signal Man; Brick Masons Tenders; Plasterer Tenders; Cement Finisher Tender; Stone Masons Tenders; Lathers Tenders; Tile Setters Tenders; Mortar Mixers; Jackhammer; Vibrator; Tamper; Pavement Buster; Chipping & Peening Hammer; Air Siphon & Air Pump; Riprap Finisher; Concrete Saw; Concrete Technician; Power Saw; Chain Saw; Motorized Buggy; Pipelayers Tender; Drill Op. Tender; Sheeters & Shorers; Post Hole Digger; Asphalt Raker; Lance and/or Water Blaster; Blachsmith Tender; Batch House Scale; Workmen working with Acid Mortar; Acid Brick; Acid or Mastic Asphalt; Workmen working with Creosote; Nozzlemen for Gunnite or Sandblasting; Tool Room Attendants; Ride or Walk Roller Tampers; Lather Tender; Tile Setters Tenders; Asbestos Removal Worker; Hazardous Waste Worker. GROUP 3: Blacksmith; Powdermen; Air Track; Pipe Layer (including Laser Beam Set-Up); Burner. ---------------------------------------------------------------- MARB0005-001 06/01/2005 CABELL, MASON (THAT PORTION SOUTH OF THE KANAWHA RIVER), AND WAYNE COUNTIES Rates Fringes Marble, terrazzo and tile finisher.........................$ 20.38 12.75 ---------------------------------------------------------------- PAIN0091-001 12/01/2007 BROOKE (SOUTH OF BUFFALO CREEK), MARSHALL, OHIO AND WETZEL COS. Rates Fringes Painters: Brush, Roller, Paper hanger, Sand/Spray, Waterblast and Perfataping (Including Automatic Perfataping Tools)..........$ 21.95 9.95 ---------------------------------------------------------------- PAIN0091-010 12/01/2005 Brooke, Marshall, Ohio, and Wetzel Counties Rates Fringes GLAZIER..........................$ 22.50 9.30 ---------------------------------------------------------------- PAIN0091-011 12/01/2005 Hancock County Rates Fringes GLAZIER..........................$ 23.30 8.40 ---------------------------------------------------------------- PAIN0438-003 12/01/2007 BROOKE (NORTH OF BUFFALO CREEK), HANCOCK COUNTIES Rates Fringes Painters: (Painters, Drywall Finishers & Paper Hangers, and Perfataping (Automatic Taping Tools, Bazooka & Banjo))..........................$ 21.95 9.95 ---------------------------------------------------------------- PAIN0804-001 12/01/2007 BARBOUR, DODDRIDGE, GILMER, GRANT, HAMPSHIRE, HARDY, HARRISON, LEWIS, MARION, MINERAL, MORGAN, MONONGALIA, PENDLETON, PRESTON, RANDOLPH, TAYLOR, TUCKER, UPSHUR AND WEBSTER COS. Rates Fringes PAINTER (Bridges, Locks, Dams, High Tension Towers, Energized Substations)...........$ 27.04 9.95 PAINTER (Commercial).............$ 21.99 9.95 PAINTER (Industrial and Power Generating Facilities)...........$ 24.14 9.95 ---------------------------------------------------------------- PAIN0813-001 12/01/2007 CABELL, MASON AND WAYNE COUNTIES Rates Fringes Painters: Brush and Roller, Drywall Finishing and Texuring, Machine Toolstand and Stilts, Spray and Sandblast, and Wall Covering and Vinyl..........$ 22.08 9.95 ---------------------------------------------------------------- PAIN0970-001 12/01/2007 BRAXTON, CALHOUN, KANAWHA AND PUTNAM COUNTIES Rates Fringes Painters: (Brush Painting, A/Compressor Op., Roller Painting, DryWall Pointers & Tapers, Dipping & Mitten Work, Sprayer Machine Op., Taping Machines, Mud Mixer, Pole Sander, Tape and Spackling Teams, All Synthetic Interior & Exterior Work, Sandblaster, Water Blaster, Steam Jenny Nozzle Op., Swinging Scaffold and Boat Swing Chair, Window Jack Work, Vinyl & Paper Hangers:) All new commercial projects; Commercial repaint or renovation projects where the total construction cost on the project (all trades combined) exceeds $500,000 in construction cost; all work on waste and water treatment facilities........$ 22.08 9.95 Work at manufacturing plants and power plants.....$ 24.23 9.95 ---------------------------------------------------------------- PAIN1144-002 12/01/2007 JACKSON, PLEASANTS, RITCHIE, ROANE, TYLER, WIRT AND WOOD COS. Rates Fringes Painters: Commercial: Brush, roller, Drywall Finisher (Operating mechanical taping machines (men working behind the machine will receive the same rate), Pointers & tapers, Paper & vinyl hangers, Sign painter................$ 22.12 9.95 Industrial: Brush/roller, open structural steel, stacks, vent pipes, flag poles, electrical, radio and tv towers, tanks, spray, sand & water blast, pot man, hydrojet, and glove work..................$ 24.27 9.95 ---------------------------------------------------------------- PAIN1195-001 12/01/2007 BARBOUR,BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, GRANT, HAMPSHIRE, HARDY, HARRISON,KANAWHA, LEWIS, MARION, MASON, MINERAL, MONOGALIA, MORGAN, PENDELTON, PRESTON, PUTNAM, RANDOLPH, ROANE, TAYLOR, TUCKER WAYNE, WEBSTER AND UPSHUR COUNTIES. Rates Fringes GLAZIER..........................$ 26.50 5.65 ---------------------------------------------------------------- PAIN1195-007 12/01/2007 JACKSON, PLEASANTS, RITICHIE, TYLER, WIRT, and WOOD Counties Rates Fringes GLAZIER..........................$ 25.99 6.15 ---------------------------------------------------------------- PLAS0039-003 07/01/2005 BROOKE, CALHOUN, GRANT, HAMPSHIRE, HANCOCK, HARDY, JACKSON, MARSHALL, MINERAL,MORGAN, OHIO, PENDLETON, PLEASANTS, RANDOLPH, RITCHIE, TAYLOR, WETZEL, WIRT & WOOD COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 21.98 8.85 Mechanical Equipment (Floating, Grinding, Bushhammering or finishing)......$ 22.58 8.85 ---------------------------------------------------------------- PLAS0039-004 07/01/2005 BROOKE, CALHOUN, GILMER, GRANT, HAMPSHIRE, HANCOCK, HARDY, JACKSON, MARSHALL, MINERAL, MORGAN, OHIO, PENDLETON, PLEASANTS, RANDOLPH, RITCHIE, TYLER, WETZEL, WIRT & WOOD COUNTIES Rates Fringes PLASTERER........................$ 21.82 8.93 ---------------------------------------------------------------- PLAS0887-001 06/01/2004 Rates Fringes Cement Masons: BRAXTON, KANAWHA, PUTNAM AND ROANE COUNTIES..........$ 23.99 11.79 CABELL, MASON AND WAYNE COUNTIES:...................$ 25.67 11.79 ---------------------------------------------------------------- PLAS0887-003 06/01/2004 Rates Fringes PLASTERER BRAXTON, KANAWHA, PUTNAM AND ROANE COUNTIES..........$ 26.18 10.64 CABELL, MASON AND WAYNE COUNTIES....................$ 26.09 10.64 ---------------------------------------------------------------- PLUM0083-002 07/01/2007 BROOKE COUNTY (North to Route #27 due east to the State Line, Excluding the City limits of Wellsburg), MARSHALL, OHIO AND WETZEL COUNTIES Rates Fringes Plumber and Steamfitter Work at chemical plants, steel mills, pilot plants, chemical laboratories, compressor stations and bulk storage plants.........$ 31.11 14.68 All other work..............$ 28.76 14.68 ---------------------------------------------------------------- PLUM0152-001 11/01/2007 HARRISON, LEWIS, MARION, MONONGALIA, TAYLOR AND UPSHUR COUNTIES Rates Fringes Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 30.03 20.08 All other work..............$ 29.05 16.50 ---------------------------------------------------------------- PLUM0152-002 11/01/2007 BARBOUR, DODDRIDGE AND PRESTON COUNTIES Rates Fringes Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 30.28 20.11 All other work..............$ 29.33 16.50 ---------------------------------------------------------------- PLUM0152-003 11/01/2007 BRAXTON, GILMER, RANDOLPH AND TUCKER COUNTIES Rates Fringes Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 30.53 20.13 ---------------------------------------------------------------- PLUM0152-004 11/01/2007 GRANT, HAMPSHIRE, HARDY, MINERAL AND PENDLETON COUNTIES Rates Fringes Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 30.78 20.16 All other work..............$ 26.48 18.80 ---------------------------------------------------------------- PLUM0490-001 06/01/1998 BROOKE (North of Buffalo Creek),AND HANCOCK COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 26.15 12.25 ---------------------------------------------------------------- PLUM0521-002 06/01/2007 CABELL, MASON AND WAYNE COUNTIES Rates Fringes Plumbers and Pipefitters.........$ 27.75 13.68 ---------------------------------------------------------------- PLUM0565-001 07/01/2007 CALHOUN, JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COS. Rates Fringes Plumbers and Pipefitters.........$ 28.08 16.06 ---------------------------------------------------------------- PLUM0625-001 06/01/2008 KANAWHA, PUTNAM, ROANE AND WEBSTER COUNTIES Rates Fringes Plumber, Pipefitter, Steamfitter Work at plants that are in the process of manufacturing a product....$ 29.89 14.63 All other work..............$ 28.49 14.63 ---------------------------------------------------------------- ROOF0034-002 05/01/2000 GRANT, HAMPSHIRE, HARDY, MINERAL, AND MORGAN COUNTIES Rates Fringes Roofers: Composition Mopmen..........$ 16.25 5.05 Composition Roofer..........$ 16.00 5.05 Pitch Tear Off or Put On....$ 16.50 5.05 Slaters.....................$ 16.15 5.05 ---------------------------------------------------------------- ROOF0185-004 06/01/2007 CABELL, KANAWHA, MASON, PUTNAM AND WAYNE COS. Rates Fringes Roofers:.........................$ 24.90 9.43 ---------------------------------------------------------------- ROOF0188-002 07/01/2007 BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES Rates Fringes Roofers: Coal Tar Pitch & Waterproofing...............$ 24.02 9.60 Roofers.....................$ 23.77 9.60 ---------------------------------------------------------------- ROOF0242-002 06/01/2007 BARBOUR, BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, LEWIS, MARION, MONONGALIA, PENDLETON, PLEASANTS, PRESTON, RANDOLPH, RITCHIE, ROANE, TAYLOR, TUCKER, TYLER, UPSHUR, WETZEL, WIRT AND WOOD COUNTIES Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 22.94 9.03 ---------------------------------------------------------------- SFWV0669-001 04/01/2008 BRAXTON, BROOKE, CABELL, CALHOUN, DODDRIDGE, GILMER, HANCOCK, HARRISON, JACKSON, KANAWHA, LEWIS, MARION, MARSHALL, MASON, MINERAL, OHIO, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER, UPSHUR, WAYNE, WETZEL, WIRT AND WOOD COUNTIES Rates Fringes SPRINKLER FITTER.................$ 29.25 15.05 ---------------------------------------------------------------- SHEE0024-010 06/01/2008 CABELL AND WAYNE COUNTIES Rates Fringes Sheet metal worker...............$ 25.05 17.57 ---------------------------------------------------------------- SHEE0033-015 06/01/2008 KANAWHA, MASON AND PUTNAM COUNTIES Rates Fringes Sheet Metal Worker...............$ 25.00 16.74 ---------------------------------------------------------------- * SHEE0033-017 07/01/2008 BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES Rates Fringes Sheet Metal Worker...............$ 25.85 15.12 ---------------------------------------------------------------- SHEE0033-020 06/01/2007 BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, LEWIS, MONONGALIA, MARION, PLEASANTS, RITCHIE, ROANE, TYLER, UPSHUR, WETZEL, WIRT AND WOOD COUNTIES Rates Fringes Sheet metal worker...............$ 25.41 15.70 ---------------------------------------------------------------- SHEE0100-008 05/01/2001 MINERAL COUNTY Rates Fringes Sheet Metal Worker...............$ 21.77 7.79 ---------------------------------------------------------------- TEAM0175-002 10/01/2004 CALHOUN, GILMER, JACKSON, KANAWHA, PLEASANTS, RITCHIE, ROANE, TYLER, WIRT AND WOOD COUNTIES Rates Fringes Truck drivers: GROUP 1.....................$ 20.86 a+b GROUP 2.....................$ 20.92 a+b GROUP 3.....................$ 21.02 a+b GROUP 4.....................$ 21.25 a+b GROUP 5.....................$ 20.53 a+b GROUP 6.....................$ 20.64 a+b GROUP 7.....................$ 20.80 a+b TRUCK DRIVER CLASSIFICATION GROUP 1: Yardmen, Pick-ups, Station wagons, Panel trucks, Flatbed Material Truck (Straight Job, Greasers, Washers, Tiremen, and Dump Truck (up to 5 cubic yards). GROUP 2: Tank truck (straight) GROUP 3: Dump truck (5 cu. yds. & over), Semi-dump trucks, Semi-trailer (whether flat, rack or pole and hauled or pushed by truck or tractor), Agitators or mixed trucks (up to 5 cu. yds.), and Tank trucks (semi). GROUP 4: Low-boy trailers, Winch trucks, Fork trucks, Distributor trucks (front & back end), Truck crane, and Monrail Truck. GROUP 5: Agitator or Mixer Truck (5 cubic yards and over) GROUP 6: Euclids, Dumpsters, Turnarockers, Ross carriers, Athey wagons or similar equipment, A-frame, Hydrolift, Dual purpose trucks. GROUP 7: Mechanics FOOTNOTES: a. EMPLOYER CONTRIBUTES $652.00 PER MONTH PER EMPLOYEE EMPLOYED 30 DAYS OR MORE. b. EMPLOYER CONTRIBUTES $420.12 PER MONTH PER EMPLOYEE EMPLOYED 30 DAYS OR MORE. ---------------------------------------------------------------- TEAM0428-001 07/01/1989 BROOKE AND HANCOCK COUNTIES Rates Fringes Truck drivers: GROUP 1:...................$ 16.20 a GROUP 2:...................$ 16.21 a GROUP 3:...................$ 16.25 a GROUP 4:...................$ 16.28 a GROUP 5:...................$ 16.83 a GROUP 6:...................$ 16.93 a GROUP 7:...................$ 17.05 a ALL OTHER WORK: GROUP 1:...................$ 14.58 a GROUP 2:...................$ 14.59 a GROUP 3:...................$ 14.63 a GROUP 4:...................$ 14.65 a GROUP 5:...................$ 15.15 a GROUP 6:...................$ 15.24 a GROUP 7:...................$ 15.35 a TRUCK DRIVER CLASSIFICATION GROUP 1: Yardmen GROUP 2: Euclids, Dumpsters, Turnarockers, Ross carrier, Athey wagons GROUP 3: Flatboy material trucks, Dump trucks, Semi-dump trucks GROUP 4: Tank trucks (straight & semi) GROUP 5: Lowboy trailers, Winch trucks, A-frames, Fork trucks, Truck crane, Distributor Trucks (front back end) GROUP 6: Mechanic GROUP 7: Semi trailers and tractor trailers FOOTNOTE: a. EMPLOYER CONTRIBUTES $65.00 PER WEEK PER EMPLOYEE ---------------------------------------------------------------- TEAM0505-003 06/01/2008 CABELL, MASON AND WAYNE COUNTIES Rates Fringes Truck drivers: GROUP 1:....................$ 28.73 12.21+A GROUP 2:....................$ 29.24 12.21+A GROUP 3:....................$ 30.49 12.21+A GROUP 4:....................$ 29.34 12.21+A GROUP 5:....................$ 24.91 12.21+A GROUP 6:....................$ 29.87 12.21+A TRUCK DRIVER CLASSIFICATION GROUP 1: Warehousemen, yardmen, pick-ups, station wagons, panel trucks, flatbody material trucks (straight job), greasers, washers, tiremen, gas pump attendants, dump trucks (up to 5 cu. yds.), truck tenders. GROUP 2: Tank truck (straight), dump trucks (5 cu. yds & over), agitator or mixer trucks (up to 5 cu. yds.), and flat bed tandems. GROUP 3: Winch trucks, fork trucks, distributor trucks (front and back end), truck crane, mono-rail truck. GROUP 4: Material checker & receiver, mechanics tender. GROUP 5: Agitator or mixer truck (5 cu. yds. & over). GROUP 6: Mechanic, tri-axle dump trucks, hydraulic lift tail gate truck and farm type tractors, end dumpsters, turnarockers, ross carriers, athey wagon,semi-dump, semi-trailer, semi-tank and lowboy trailers A.Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Day after Thanksgiving and Christmas Day. ---------------------------------------------------------------- TEAM0697-002 09/01/2000 MARSHALL, OHIO AND WETZEL COUNTIES Rates Fringes Truck drivers: GROUP 1....................$ 18.75 a+b GROUP 2....................$ 18.80 a+b GROUP 3....................$ 18.85 a+b GROUP 4....................$ 19.38 a+b GROUP 5....................$ 18.83 a+b GROUP 6....................$ 19.03 a+b GROUP 7....................$ 19.11 a+b GROUP 8....................$ 18.95 a+b GROUP 9....................$ 19.08 a+b GROUP 10....................$ 18.76 a+b GROUP 11....................$ 18.76 a+b GROUP 12....................$ 19.48 a+b GROUP 13....................$ 19.45 a+b TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Pick-Up trucks, Warehousemen, Yardmen and Part Chaser GROUP 2: Flat bed material trucks, Dump trucks, Semi-dump trucks GROUP 3: Semi-tractor trailers GROUP 4: Lowboy trailers, Winch, Fork & Distributor trucks (front & back end) & Truck Cranes GROUP 5: Tank truck (straight & semi) GROUP 6: Agitator & mixer truck (up to 5 cu. yds.) GROUP 7: Agitator & mixer truck (over 5 cu. yds.) GROUP 8: Pole trailer GROUP 9: Euclids, Dumpsters, Turna rockers, Ross Carriers & Athry Wagons Group 10: Material Checkers & Receivers Group 11: Greasers, Washers, Tiremen, Gas Pump Attendants, Mechanic Tender GROUP 12: Mechanics GROUP 13: A-Frame FOOTNOTES: a. EMPLOYER CONTRIBUTES $166.00 PER WEEK PER EMPLOYEE. b. EMPLOYER CONTRIBUTES $85.00 PER WEEK PER EMPLOYEE. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION