General Decision Number: WI120008 01/13/2012 WI8 Superseded General Decision Number: WI20100008 State: Wisconsin Construction Types: Heavy (Sewer and Water Line and Tunnel) Counties: Wisconsin Statewide. TUNNEL, SEWER & WATER LINE CONSTRUCTION PROJECTS Modification Number Publication Date 0 01/06/2012 1 01/13/2012 BRWI0001-002 06/01/2011 CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND VERNON COUNTIES Rates Fringes BRICKLAYER.......................$ 30.20 16.69 ---------------------------------------------------------------- BRWI0002-002 06/01/2011 ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES Rates Fringes BRICKLAYER.......................$ 35.33 15.51 ---------------------------------------------------------------- BRWI0002-005 06/01/2011 ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 30.52 15.44 ---------------------------------------------------------------- BRWI0003-002 06/01/2011 BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES Rates Fringes BRICKLAYER.......................$ 30.76 16.12 ---------------------------------------------------------------- BRWI0004-002 06/01/2011 KENOSHA, RACINE, AND WALWORTH COUNTIES Rates Fringes BRICKLAYER.......................$ 35.11 16.83 ---------------------------------------------------------------- BRWI0006-002 06/01/2011 ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE, ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES Rates Fringes BRICKLAYER.......................$ 31.34 15.55 ---------------------------------------------------------------- BRWI0007-002 06/01/2011 GREEN, LAFAYETTE, AND ROCK COUNTIES Rates Fringes BRICKLAYER.......................$ 32.06 16.50 ---------------------------------------------------------------- BRWI0008-002 06/01/2011 MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES Rates Fringes BRICKLAYER.......................$ 35.58 16.07 ---------------------------------------------------------------- BRWI0009-001 06/01/2011 GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA, WASHARA, AND WINNEBAGO COUNTIES Rates Fringes BRICKLAYER.......................$ 30.76 16.12 ---------------------------------------------------------------- BRWI0011-002 06/01/2011 CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES Rates Fringes BRICKLAYER.......................$ 30.76 16.12 ---------------------------------------------------------------- BRWI0013-002 06/01/2011 DANE, GRANT, IOWA, AND RICHLAND COUNTIES Rates Fringes BRICKLAYER.......................$ 32.01 16.55 ---------------------------------------------------------------- BRWI0019-002 06/01/2011 BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES Rates Fringes BRICKLAYER.......................$ 30.42 16.47 ---------------------------------------------------------------- BRWI0021-002 06/01/2011 DODGE AND JEFFERSON COUNTIES Rates Fringes BRICKLAYER.......................$ 32.56 16.02 ---------------------------------------------------------------- BRWI0034-002 06/01/2010 COLUMBIA AND SAUK COUNTIES Rates Fringes BRICKLAYER.......................$ 32.66 15.90 ---------------------------------------------------------------- CARP0087-001 05/01/2007 BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES Rates Fringes Carpenter & Piledrivermen........$ 26.76 11.61 ---------------------------------------------------------------- CARP0252-002 06/01/2010 ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E. of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES Rates Fringes CARPENTER CARPENTER...................$ 30.56 13.36 MILLWRIGHT..................$ 32.16 13.36 PILEDRIVER..................$ 31.06 13.36 ---------------------------------------------------------------- CARP0252-010 05/27/2007 ASHLAND COUNTY Rates Fringes Carpenters Carpenter...................$ 23.82 11.26 Millwright..................$ 27.71 11.26 Pile Driver.................$ 24.81 10.43 ---------------------------------------------------------------- CARP0264-003 06/01/2008 KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON COUNTIES Rates Fringes CARPENTER........................$ 30.52 14.41 ---------------------------------------------------------------- CARP0361-004 07/11/2011 BAYFIELD (West of Hwy 63) AND DOUGLAS COUNTIES Rates Fringes CARPENTER........................$ 31.07 15.80 ---------------------------------------------------------------- CARP2337-001 06/01/2008 ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON ZONE B: KENOSHA & RACINE Rates Fringes PILEDRIVERMAN Zone A......................$ 27.25 19.46 Zone B......................$ 24.47 19.46 ---------------------------------------------------------------- CARP2337-003 06/02/2008 Rates Fringes MILLWRIGHT Zone A......................$ 27.92 19.08 Zone B......................$ 26.82 19.08 ZONE DEFINITIONS ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON COUNTIES ZONE B: KENOSHA & RACINE COUNTIES ---------------------------------------------------------------- ELEC0014-002 06/01/2011 ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK (except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN COUNTIES Rates Fringes Electricians:....................$ 28.74 17.82 ---------------------------------------------------------------- ELEC0127-002 06/01/2010 KENOSHA COUNTY Rates Fringes Electricians:....................$ 33.75 18.87 ---------------------------------------------------------------- ELEC0158-002 06/02/2008 BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES Rates Fringes Electricians:....................$ 27.27 26.75%+7.62 ---------------------------------------------------------------- ELEC0159-003 06/01/2011 COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK COUNTIES Rates Fringes Electricians:....................$ 32.55 18.80 ---------------------------------------------------------------- ELEC0219-004 05/30/2011 FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara) Rates Fringes Electricians: Electrical contracts over $130,000....................$ 29.41 16.97 Electrical contracts under $130,000....................$ 26.24 16.85 ---------------------------------------------------------------- ELEC0242-005 05/29/2011 DOUGLAS COUNTY Rates Fringes Electricians:....................$ 30.39 22.90 ---------------------------------------------------------------- ELEC0388-002 05/31/2011 ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Area North of the town of Wausaukee), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Area North of the townships of Aniwa and Hutchins), VILAS AND WOOD COUNTIES Rates Fringes Electricians:....................$ 28.29 16.41 ---------------------------------------------------------------- ELEC0430-002 06/01/2011 RACINE COUNTY (Except Burlington Township) Rates Fringes Electricians:....................$ 32.87 19.22 ---------------------------------------------------------------- ELEC0494-005 06/01/2011 MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES Rates Fringes Electricians:....................$ 31.54 20.88 ---------------------------------------------------------------- ELEC0494-006 06/01/2011 CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES Rates Fringes Electricians:....................$ 28.88 19.06 ---------------------------------------------------------------- ELEC0577-003 06/01/2011 CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES Rates Fringes Electricians:....................$ 27.40 16.41 ---------------------------------------------------------------- ELEC0890-003 06/01/2011 DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES Rates Fringes Electricians:....................$ 30.00 24%+10.56 ---------------------------------------------------------------- * ENGI0139-003 06/05/2011 REMAINING COUNTIES Rates Fringes Power Equipment Operator Group 1.....................$ 34.62 17.75 Group 2.....................$ 33.62 17.75 Group 3.....................$ 32.42 17.75 Group 4.....................$ 31.89 17.75 Group 5.....................$ 29.82 17.75 Group 6.....................$ 29.19 17.75 HAZARDOUS WASTE PREMIUMS: EPA Level "A" Protection: $3.00 per hour EPA Level "B" Protection: $2.00 per hour EPA Level "C" Protection: $1.00 per hour POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons; Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer. GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over; Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs; Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor; Concrete Laser Screed; Concrete Grinder and Planing Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; over 46 meter Concrete Pump. GROUP 4: Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or End Loader (over 40 hp); Motor Patrol; Scraper Operator; Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete pumps 46 meter and under; Grout Pumps; Rotec type machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal); Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Material Haulers. GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp); Tampers -Compactors, riding type; Stump Chipper, large; Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large; Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small; Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants); Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines; Generators; Pumps over 3"; Heaters, Mechanical; Combination small equipment operator; Winches, small electric; Oiler; Greaser; Rotary Drill Tender; Conveyor; Elevator Operator ---------------------------------------------------------------- ENGI0139-007 06/01/2011 DODGE, FOND DU LAC, JEFFERSON, KENOSHA, MILWAUKEE, OZAUKEE, RACINE, SHEBOYGAN, WALWORTH, WASHINGTON, AND WAUKESHA COUNTIES Rates Fringes Power Equipment Operator Group 1.....................$ 34.69 18.30 Group 2.....................$ 33.91 18.30 Group 3.....................$ 32.96 18.30 Group 4.....................$ 31.91 18.30 Group 5.....................$ 30.51 18.30 HAZARDOUS WASTE PREMIUMS: EPA Level "A" Protection: $3.00 per hour EPA Level "B" Protection: $2.00 per hour EPA Level "C" Protection: $1.00 per hour POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Cranes, Tower Cranes, and Derricks with or without attachments, with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Backhoes (Excavators) 130,000 lbs and over; Caisson Rigs and Pile Drivers GROUP 2: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or under; or Cranes, Tower Cranes, and Derricks with boom, lead, and\or jib lengths measuring 175 feet or under; Backhoes (Excavators) under 130,000 lbs; Skid Rigs; Dredge Operator: Traveling Crane (Bridge type); Concrete Paver over 27 E; Concrete Spreader and Distributor; Concrete Pumps and Boring Machines (directional) GROUP 3: Material Hoists; Stack Hoists; Tractor or Truck mounted Hydraulic Backhoe; Tractor or Truck Mounted Hydraulic Crane, 5 tons or under; Manhoist; Tractor over 40 hp; Bulldozer over 40 hp; Endloader over 40 hp; Forklift, 25 ft and over; Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier; Mechanic and Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Percussion Drill Operator; Rotary Drill Operator; Blaster; Air Track Drill; Trencher (wheel type or chain type having over 8 inch bucket); Elevator; Milling Machine and Boring Machine (horizontal or vertical); Backhoe Mounted Compactor GROUP 4: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machine (road type); Roller, Rubber Tire; Concrete Batch Hopper; Concrete Conveyor System; Concrete Mixers (14S or over); Screw type Pumps and Gypsum Pumps; Grout Pumps; Tractor, Bulldozer, End Loader, under 40 hp; Pumps (well points); Trencher (chain type 8 inch or smaller bucket; Industrial Locomotives; Roller under 5 tons; Fireman (Piledrivers and Derricks); Robotic Tool Carrier with or without attachments. GROUP 5: Hoists (Automatic); Forklift, 12 ft to 25 ft; Tamper-Compactors, riding type; A-Frame andWinch Trucks; Concrete Auto Breaker; Hydrohammer, small; Brooms and Sweepers; Hoist (Tuggers); Stump Chipper, large; Boats (Tug, Safety, Work Barges and Launch); Shouldering Machine Operator; Screed Operator; Farm or Industrial Tractor; Post Hole Digger; Stone Crushers and Screening Plants; Firemen (Asphalt Plants); Air Compressor (400 CFM or over); Augers (vertical and horizontal); Generators, 150 KW and over; Air, Electric Hydraulic Jacks (Slipform); Prestress Machines; Skid Steer Loader with or without attachments; Boiler operators (temporary heat); Forklift, 12 ft and under; Screed Operator Milling Machine; Refrigeration Plant/Freeze Machine; Power Pack Vibratory/Ultra Sound Driver and Extractor; Generators under 150 KW; Combination small equipment operator; Compressors under 400 CFM; Welding Machines; Heaters, Mechanical; Pumps; Winches, Small Electric; Oiler and Greaser; Conveyor; High pressure utility locating machine (daylighting machine). ---------------------------------------------------------------- IRON0008-002 06/06/2011 BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO COUNTIES: Rates Fringes IRONWORKER.......................$ 28.03 22.24 ---------------------------------------------------------------- IRON0008-003 06/06/2011 KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3), WASHINGTON, AND WAUKESHA COUNTIES Rates Fringes IRONWORKER.......................$ 31.31 22.24 ---------------------------------------------------------------- IRON0383-001 06/01/2010 ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST, GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES Rates Fringes IRONWORKER.......................$ 30.90 19.13 ---------------------------------------------------------------- IRON0498-005 06/01/2008 GREEN (S.E. 1/3), ROCK (South of Edgerton and Milton), and WALWORTH (S.W. 1/3) COUNTIES: Rates Fringes IRONWORKER.......................$ 34.34 25.72 ---------------------------------------------------------------- IRON0512-008 05/01/2011 BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON, PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU COUNTIES Rates Fringes IRONWORKER.......................$ 34.05 20.37 ---------------------------------------------------------------- IRON0512-021 10/01/2011 ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA, PRICE, SAWYER, VILAS AND WASHBURN COUNTIES Rates Fringes IRONWORKER.......................$ 29.14 20.37 ---------------------------------------------------------------- LABO0113-004 06/04/2007 MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES Rates Fringes Laborers: (Open Cut) Group 1.....................$ 13.55 12.00 Group 2.....................$ 15.25 12.00 Group 3.....................$ 24.92 12.00 Group 4.....................$ 25.04 12.00 Group 5.....................$ 25.09 12.00 Group 6.....................$ 26.74 12.00 Group 7.....................$ 28.87 12.00 Group 8.....................$ 29.33 12.00 LABORERS CLASSIFICATIONS [OPEN CUT] GROUP 1: Yard Laborer GROUP 2: Landscaper GROUP 3: Paving Laborer GROUP 4: General Laborer on Surface; Top Man GROUP 5: Mud Mixer GROUP 6: Mucker; Form Stripper; Bottom Digger and Misc; Bottom Man and Welder on Surface GROUP 7: Concrete Manhole Builder; Caisson Worker; Miner; Pipe Layer; Rock Driller and Joint Man; Timber Man and Concrete Brusher; Bracer in Trench Behind Machine & Tight Sheeting; Concrete Formsetter and Shoveler; Jackhammer Operator GROUP 8: Blaster NOTE: Hazardous & Toxic Waste Removal: add $0.15 per hour. ---------------------------------------------------------------- LABO0113-005 06/01/2008 SEWER, TUNNEL & UNDERGROUND KENOSHA AND RACINE COUNTIES Rates Fringes Laborers: Group 1.....................$ 18.48 13.31 Group 2.....................$ 23.09 13.31 Group 3.....................$ 25.07 13.31 Group 4.....................$ 26.47 13.31 FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0-15 lbs add $1.00, 15-30 lbs add $2.00, over 30 lbs add $3.00 LABORERS CLASSIFICATIONS GROUP 1: Flagperson GROUP 2: General Laborer, Landscaper, Wellpoint Installation, Wire Mesh and Reinforcement, Concrete Worker, Form Stripper, Strike-off Worker GROUP 3: Machine and Equipment Operator, Sheeting, Form Setting, Patch Finisher,Bottom Man, Joint Sawer, Gunnite Man, Manhole Builder, Welder-Torchman, Blaster, Caulker, Bracer, Bull Float, Conduit Worker, Mucker and Car Pusher, Raker and Luteman, Hydraulic Jacking of Shields, Shield Drivers, Mining Machine, Lock Tenders, Mucking Machine Operator, Motor Men & Gauge Tenders and operation of incidental Mechanical Equipment and all Power Driven Tools GROUP 4: Pipelayer, Miner and Laser Operator ---------------------------------------------------------------- LABO0113-008 06/04/2007 MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES Rates Fringes Laborers: (Tunnel-Free Air) Group 1.....................$ 25.04 12.00 Group 2.....................$ 25.09 12.00 Group 3.....................$ 26.74 12.00 Group 4.....................$ 26.84 12.00 Group 5.....................$ 28.87 12.00 Group 6.....................$ 29.33 12.00 LABORERS CLASSIFICATIONS [TUNNEL - FREE AIR]: GROUP 1: General Laborer on surface; Tower Man GROUP 2: Saw Man; Top Man GROUP 3: Form Stripper; Car Pusher GROUP 4: Mucker; Dinkey; Welder (rate on surface) GROUP 5: Concrete Manhole Builder; Mucking Machine; Miner; Mining Machine; Welder; Rock Driller; Concrete Buster; Jack Hammer Operator; Caisson Worker; Pipelayer and Joint Man; Bracerman; Nozzle Man on Gunnite; Timber Man; Concrete Brusher GROUP 6: Blaster NOTE: Hazardous & Toxic Waste Removal: add $0.15 per hour. ---------------------------------------------------------------- * LABO0113-009 06/04/2007 MILWAUKEE, OZAUKEE, WASHINGTON & WAUKESHA COUNTIES Rates Fringes Laborers: (Tunnel - *COMPRESSED AIR 0 - 15 lbs.) Group 1.....................$ 25.04 12.00 Group 2.....................$ 27.15 12.00 Group 3.....................$ 27.74 12.00 Group 4.....................$ 27.84 12.00 Group 5.....................$ 29.87 12.00 Group 6.....................$ 30.33 12.00 LABORERS CLASSIFICATIONS [TUNNEL - COMPRESSED AIR]: *Compressed Air 15 - 30 lbs add $2.00 to all classifications *Compressed Air over 30 lbs add $3.00 to all classifcations GROUP 1: General Laborer on surface GROUP 2: Lock Tender on surface GROUP 3: Form Stripper; Car Pusher GROUP 4: Mucker; Dinkey GROUP 5: Mucking Machine; Miner; Mining Machine; Welder & Rock Driller; Lock Tender in tunnel; Concrete Buster; Jack Hammer Operator; Caisson Worker; Pielayer and Joint Man; Bracerman; Nozzle Man on Gunite; Timber Man; Concrete Brusher; GROUP 6: Blaster NOTE: Hazardous & Toxic Waste Removal: add $0.15 per hour. ---------------------------------------------------------------- LABO0140-005 06/01/2008 ADAMS, ASHLAND, BARRON, BROWN, BUFFALO, CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE,FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, JACKSON, JEFFERSON, JUNEAU, LACROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RICHLAND, ROCK, RUSK, ST CROIX, SAUK, SAWYER, SHAWANO, SHEBOYGAN, TAYLOR, TREMMPEALEAU, VERNON, VILAS, WALWWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES Rates Fringes LABORER (SEWER & WATER) Group 1.....................$ 21.18 11.74 Group 2.....................$ 23.03 11.74 Group 3.....................$ 23.23 11.74 Group 4.....................$ 23.58 11.74 FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0-15 lbs add $1.00, 15-30 lbs add $2.00, over 30 lbs add $3.00 LABORERS CLASSIFICATIONS: GROUP 1: Flagperson GROUP 2: General Laborer, Wellpoint Installation; Form Stripper; Strike Off worker GROUP 3: Sheeting Formsetting; Patch Finisher; Bottom Man; Joint Sawer; Gunnite Man; Manhole Builder; Welder; Torchman; Blaster; Caulker Bracer; Bull Float; Mucker and Car Pusher; Raker and Luteman; Hydraulic jacking of shields, Shield Drivers; Mining Machine; Lock Tenders; Mucking Machine Operators; Motor Men and Gauge Tenders; Power Tool Operators GROUP 4: Pipelayer, Miner, and Laser Operator ---------------------------------------------------------------- LABO0464-002 06/01/2008 DANE AND DOUGLAS COUNTIES Rates Fringes Laborers: Group 1.....................$ 21.88 11.74 Group 2.....................$ 24.08 11.74 Group 3.....................$ 24.28 11.74 Group 4.....................$ 24.63 11.74 FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 lbs add $1.00, 15- 30 lbs add $2.00, over 30 lbs add $3.00 LABORERS CLASSIFICATIONS: GROUP 1: Flagperson GROUP 2: General Laborer; Wellpoint Installation; Concrete Worker; Form Stripper; Strike Off worker GROUP 3: Sheeting Formsetting; Patch Finisher; Bottom Man; Joint Sawer; Gunnite Man; Manhole Builder; Welder; Torchman; Blaster; Caulker Bracer; Bull Float; Mucker and Car Pusher; Raker and Luteman; Hydraulic jacking of shields, Shield Dirvers; Mining Machine; Lock Tenders; Mucking Machine Operators; Motor Men and Gauge Tenders; Power Tool Operators GROUP 4: Pipelayer, Miner, and Laser Operator ---------------------------------------------------------------- LABO1091-010 06/01/2008 BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES Rates Fringes Laborers: (SEWER & WATER) Group 1.....................$ 21.67 11.74 Group 2.....................$ 23.73 11.74 Group 3.....................$ 23.93 11.74 Group 4.....................$ 24.28 11.74 FOR ALL TUNNEL WORK UNDER COMPRESSED AIR: 0 - 15 lbs add $1.00, 15-30 lbs add $2.00, over 30 lbs add $3.00 LABORERS CLASSIFICATIONS: GROUP 1: Flagperson GROUP 2: Laborers, Wellpoint Installation; Form Stripper; Strike Off worker GROUP 3: Sheeting Formsetting; Patch Finisher; Bottom Man; Joint Sawer; Gunnite Man; Manhole Builder; Welder; Torchman; Blaster; Caulker Bracer; Bull Float; Mucker and Car Pusher; Raker and Luteman; Hydraulic jacking of shields, Shield Dirvers; Mining Machine; Lock Tenders; Mucking Machine Operators; Motor Men and Gauge Tenders; Power Tool Operators GROUP 4: Pipelayer, Miner, and Laser Operator ---------------------------------------------------------------- PLAS0599-010 06/01/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER Area 1......................$ 31.41 16.25 Area 2 (BAC)................$ 30.52 15.44 Area 3......................$ 29.91 16.45 Area 4......................$ 29.33 17.03 Area 5......................$ 30.68 15.68 Area 6......................$ 27.14 19.22 AREA DESCRIPTIONS AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN COUNTIES AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK COUNTIES AREA 6: KENOSHA AND RACINE COUNTIES ---------------------------------------------------------------- TEAM0039-001 05/01/2010 Rates Fringes TRUCK DRIVER 1 & 2 Axles.................$ 25.09 15.20 3 or more Axles; Euclids Dumptor & Articulated, Truck Mechanic..............$ 25.24 15.20 ------------------------------------------------------------ WELL DRILLER.....................$ 16.52 3.70 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION