General Decision Number: WA120089 04/06/2012 WA89 Superseded General Decision Number: WA20100104 State: Washington Construction Type: Heavy including water and sewer line construction County: Benton County in Washington. HEAVY CONSTRUCTION PROJECTS (including sewer/water construction). Modification Number Publication Date 0 01/06/2012 1 01/27/2012 2 02/10/2012 3 04/06/2012 CARP9003-001 06/01/2011 Rates Fringes CARPENTER (Including Form Work)............................$ 30.00 11.84 MILLWRIGHT.......................$ 29.73 10.56 PILEDRIVERMAN....................$ 28.00 10.56 ZONE PAY: ZONE 1 0-45 MILES FREE ZONE 2 46-65 MILES $2.00/PER HOUR ZONE 3 66-100 MILES $3.00/PER HOUR ZONE 4 OVER 100 MILES $4.50/PER HOUR DISPATCH POINTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite). SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite). WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite). COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite). MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite). ---------------------------------------------------------------- ELEC0112-014 06/01/2011 Rates Fringes ELECTRICIAN......................$ 35.90 3%+14.63 ---------------------------------------------------------------- ENGI0370-022 06/01/2011 Rates Fringes Power equipment operators: GROUP 1.....................$ 24.76 12.05 GROUP 2.....................$ 25.08 12.05 GROUP 3.....................$ 25.69 12.05 GROUP 4.....................$ 25.85 12.05 GROUP 5.....................$ 26.01 12.05 GROUP 6.....................$ 26.29 12.05 GROUP 7.....................$ 26.56 12.05 GROUP 8.....................$ 27.66 12.05 ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Rollers, all types on subgrade, including seal and chip coatings; Drill Assistant; Crane Oiler GROUP 2: Fork Lift; Broom/Sweeper GROUP 3: Bulldozer (up to D-6 or equivalent); Boring Machine GROUP 4: Oiler; Drill (churn, core, calyx or diamond); Loaders (overhead & front-end, under 4 yds. R/T) GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver; Grade Checker; Boom Truck (Under 25 tons) GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Mechanic; Paver; Scraper; Screed; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.) GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Grader/Blade; Loaders (overhead & front-end, over 8 yds. to 10 yds.) GROUP 8: Loaders (overhead and front-end, 10 yards and over) BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ---------------------------------------------------------------- * IRON0014-012 01/01/2012 Rates Fringes IRONWORKER (Ornamental, Reinforcing and Structural)......$ 31.35 20.10 ---------------------------------------------------------------- LABO0238-009 06/01/2011 Rates Fringes LABORER GROUP 1.....................$ 21.31 10.00 GROUP 2.....................$ 23.41 10.00 GROUP 3.....................$ 23.68 10.00 GROUP 4.....................$ 23.95 10.00 GROUP 5.....................$ 24.23 10.00 Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office LABORERS CLASSIFICATIONS GROUP 1: Flagger GROUP 2: Common or General Laborer; Form-Stripping GROUP 3: Mason Tender-Cement/Concrete GROUP 4: Grade Checker; High Scaler GROUP 5: Driller ---------------------------------------------------------------- LABO0238-014 06/01/2011 Rates Fringes LABORER: Mason Tender - Brick...$ 23.95 9.95 ---------------------------------------------------------------- PAIN0005-003 01/01/2012 Rates Fringes PAINTER (Brush, Roller, and Spray.)..........................$ 18.62 9.45 ---------------------------------------------------------------- PLAS0072-008 06/01/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 25.01 11.32 Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee Zone 1: 0 - 45 radius miles from the main post office Zone 2: 45 radius miles from the main post office ---------------------------------------------------------------- * SUWA2009-055 08/07/2009 Rates Fringes LABORER: Pipelayer..............$ 19.28 0.00 LABORER: Landscape & Irrigation.......................$ 12.27 2.73 OPERATOR: Asphalt Plant.........$ 34.14 0.68 OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 0.00 OPERATOR: Crane.................$ 23.51 5.49 OPERATOR: Power Shovel..........$ 25.12 7.83 TRUCK DRIVER, Includes Dump Truck............................$ 27.67 0.00 TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29 TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72 ---------------------------------------------------------------- TEAM0760-003 06/01/2009 Rates Fringes Truck drivers: (ANYONE WORKING ON HAZMAT JOBS SEE FOOTNOTE A BELOW) ZONE 1: GROUP 4....................$ 24.70 10.86 GROUP 5....................$ 24.81 10.86 GROUP 6....................$ 24.97 10.86 Zone Differential (Add to Zone 1 rate: Zone 1 - $2.00) BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office TRUCK DRIVERS CLASSIFICATIONS GROUP 4: Water Truck (0-8,000 gallons) GROUP 5: Semi-Trailer Truck GROUP 6: Water Truck (8,001-14,000 Gallons) FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing. LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus. Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION