General Decision Number: WA080105 02/05/2010 WA105 State: Washington Construction Type: Heavy including water and sewer line construction County: Chelan County in Washington. HEAVY CONSTRUCTION PROJECTS (including sewer/water construction). Modification Number Publication Date 0 09/25/2009 1 02/05/2010 CARP0770-002 06/01/2009 Rates Fringes CARPENTER (Including Formwork)...$ 25.25 11.97 MILLWRIGHT.......................$ 36.39 11.97 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend Zone Pay: 0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour ---------------------------------------------------------------- ELEC0191-013 03/01/2008 Rates Fringes ELECTRICIAN......................$ 29.51 3%+12.81 ---------------------------------------------------------------- ENGI0302-010 06/01/2009 WEST OF THE 120TH MERIDIAN Rates Fringes Power equipment operators: Group 1A...................$ 35.79 15.15 Group 1AA..................$ 36.36 15.15 Group 1AAA.................$ 36.92 15.15 Group 1.....................$ 35.24 15.15 Group 2.....................$ 34.75 15.15 Group 3.....................$ 34.33 15.15 Group 4.....................$ 31.97 15.15 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe, Backhoes: Over 90 metric tons GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Excavator/Trackhoe, backhoes: over 50 metric tons to 90 metric tons GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;; Excavator/Trackhoe, backhoes: over 30 metric tons to 50 metric tons; Dozer D-10; Paver; Scraper-self propelled 45 yards and over Paver GROUP 2 - Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 44 tons;; Excavator/Trackhoe, backhoe: 15 to 30 metric tons; Drilling Machine; Screed; Piledriver; Scraper-self propelled under 45 yards; Boring Machine GROUP 3 - Cranes-thru 19 tons with attachments; A-frame crane over 10 tons;; Dozers-D-9 and under; Excavator/Trackhoe, backhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments; Oiler; Drill Assistant; Boom Truck over 10 tons GROUP 4 - Cranes-A frame-10 tons and under; Forklift: under 3000 lbs with attachments; Boom Truck 10 tons and under ---------------------------------------------------------------- ENGI0370-023 06/01/2009 EAST OF THE 120TH MERIDIAN Rates Fringes Power equipment operators: GROUP 1.....................$ 23.76 11.05 GROUP 2.....................$ 24.08 11.05 GROUP 3.....................$ 24.69 11.05 GROUP 4.....................$ 24.85 11.05 GROUP 5.....................$ 25.01 11.05 GROUP 6.....................$ 25.29 11.05 GROUP 7.....................$ 25.56 11.05 GROUP 8.....................$ 26.66 11.05 ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Drill Assistant GROUP 2: Fork Lift GROUP 3: Bulldozer (up to D-6 or equivalent); Boring Machine GROUP 4: Oiler; Drill (churn, core, calyx or diamond) GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver; Cranes (25 tons & under); Boom Truck (Under 25 tons) GROUP 6: Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Paver; Scraper; Screed; Cranes (over 25 tons, to and including 45 tons) GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons) GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower) BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ---------------------------------------------------------------- IRON0086-008 07/01/2009 Rates Fringes IRONWORKER (Reinforcing, Structural, Ornamental)..........$ 31.07 17.40 ---------------------------------------------------------------- LABO0001-023 06/01/2009 ZONE 1: Rates Fringes Laborers: GROUP 2.....................$ 20.58 9.07 GROUP 3.....................$ 22.54 9.07 GROUP 4.....................$ 23.09 9.07 GROUP 5.....................$ 23.48 9.07 ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall LABORERS CLASSIFICATIONS GROUP 2: Flagger GROUP 3: General or Common Laborer; Mason Tender-Cement/Concrete; Form-Stripping GROUP 4: Grade Checker; Pipe Layer; Pipelayer; high Scaler GROUP 5: Mason Tender-Brick ---------------------------------------------------------------- PAIN0005-003 07/01/2008 Rates Fringes PAINTER (Brush, Roller, and Spray.)..........................$ 15.09 6.68 ---------------------------------------------------------------- SUWA2009-056 08/07/2009 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 24.50 6.30 LABORER: Common or General (Water and Sewer Lines)..........$ 20.79 4.63 LABORER: Landscape and Irrigation.......................$ 12.27 2.73 OPERATOR: Asphalt Plant.........$ 34.14 0.68 OPERATOR: Broom/Sweeper.........$ 27.03 4.67 OPERATOR: Grader/Blade..........$ 27.56 5.53 OPERATOR: Loader................$ 26.90 7.65 OPERATOR: Mechanic..............$ 27.09 7.30 OPERATOR: Power Shovel..........$ 25.12 7.83 OPERATOR: Roller................$ 29.18 4.14 OPERATOR: Skid Steer............$ 10.63 0.00 TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29 TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72 TRUCK DRIVER: Dump Truck.........$ 13.00 0.04 TRUCK DRIVER: Water Truck........$ 23.46 6.06 ---------------------------------------------------------------- * TEAM0760-004 06/01/2009 Rates Fringes Truck drivers: (ANYONE WORKING ON HAZMAT JOBS SEE FOOTNOTE A BELOW) ZONE 1: GROUP 5....................$ 24.81 10.86 Zone Differential (Add to Zone 1 rate: Zone 1 - $2.00) BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office TRUCK DRIVERS CLASSIFICATIONS GROUP 5: Semi-Trailer Truck FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing. LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus. Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION