General Decision Number: VA080068 02/08/2008 VA68 Superseded General Decision Number: VA20070068 State: Virginia Construction Types: Heavy Sewer and Water Line Counties: Alexandria* and Arlington Counties in Virginia. *INDEPENDENT CITY OF ALEXANDRIA SEWER AND WATER LINE CONSTRUCTION PROJECTS Modification Number Publication Date 0 02/08/2008 SUVA1991-001 11/01/1991 Rates Fringes Bricklayer.....................$ 17.50 2.80 Carpenter......................$ 16.22 2.43 Cement Mason...................$ 16.52 2.875 Ironworker, Reinforcing........$ 16.21 4.23 Laborers: COMPRESSED AIR LABORERS: Gauge Pressure 1-14 Pounds, Work Periods 7 Hours...................$ 15.69 1.73 Gauge Pressure 14-18 6 Hours...................$ 16.27 1.73 Gauge Pressure 18-22 5 1/2 Hours...............$ 16.83 1.73 Gauge Pressure 22-26 5 Hours...................$ 17.42 1.73 Gauge Pressure 26-32 4 Hours...................$ 17.99 1.73 Gauge Pressure 32-38 3 Hours...................$ 18.56 1.73 Gauge Pressure 38-44 2 1/2 Hours...............$ 19.14 1.73 Open Cut: Air track drillers, pipelayers................$ 9.00 .56 All remaining laborers classifications...........$ 8.15 .56 Laborers, jackhammers, rammers, and spaders...............$ 7.00 .56 Tunnel: Brakemen, bull gang, dumper, trackman, concrete man..............$ 9.50 .56 Chuck tender, powder in prime house, form setters and movers, nippers, cablemen, hosemen, grout men, bell or signal men, top or bottom, vibrator operator, caulker's tender..........$ 10.00 .56 Miners, rodmen, re-bar underground, concrete or gunite nozzlemen, powdermen, timbermen and retimbermen wood or steel including liner plate or any other support material, motormen, caulkers, diamond drill riggers, cement finishers (underground), welders and burners, shield driver.............$ 11.00 .56 Piledrivermen:.................$ 15.25 1.56 Plumber........................$ 18.26 3.77 Power equipment operators: Air compress, tunnel........$ 9.81 1.45 Air compressors, pump, welding machine well points......................$ 9.415 1.45 Backhoes (hydraulic, under 1/2 c.y.).............$ 10.02 1.45 Backhoes, cable ways, cranes, draglines, power shovels, mtunnel shovels, tunnel mucking machines, derricks, 1 cu. yd. and over............$ 10.39 1.45 Backhoes, cableways, cranes, derricks, dragline, tunnel machines up to 1 cu. yd., boom cats, elevating graders, hoists, paving mixers, Piledriving engines, batch plants, concrete pumps.......................$ 10.14 1.45 Bulldozer hydraulic tampers.....................$ 9.59 1.45 Concrete mixers, power wheel scoops and scrapers, motorgraders, tunnel motor men, blade graders, tunnel mechanics...................$ 9.69 1.45 Front end loaders (high lift), bulldozers...........$ 9.79 1.45 Mechanics...................$ 10.02 1.45 pumps.......................$ 10.39 1.45 Rollers.....................$ 9.49 1.45 Trenching machines (above 8' 3")...............$ 9.94 1.45 Trenching Machines (up to 8' 3"), boilers, skelton, well drilling machines....................$ 9.84 1.45 Truck drivers: Dump trucks.................$ 6.10 .415+a Dump trucks over 8 wheels......................$ 6.20 .415+a Euclids.....................$ 6.60 .415+a Flat trucks.................$ 6.20 .415+a Trailers....................$ 6.45 .415+a a. $10.00 per week when employee has worked 90 days and worked three days in any work week ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION