General Decision Number: VA080025 07/25/2008 VA25 Superseded General Decision Number: VA20070025 State: Virginia Construction Type: Building County: Alexandria* County in Virginia. *INDEPENDENT CITY OF ALEXANDRIA BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 05/16/2008 2 07/04/2008 3 07/25/2008 CARP2311-001 05/01/2006 Rates Fringes Piledriver.......................$ 22.47 6.00 ---------------------------------------------------------------- ELEC0026-003 09/03/2007 Rates Fringes Communication Technician.........$ 23.15 3%+6.87 SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network). WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work. ---------------------------------------------------------------- ELEC0026-014 02/05/2007 Rates Fringes Lightning Protection Technician.......................$ 22.50 6.80+3% ---------------------------------------------------------------- ELEC0026-015 06/04/2007 Rates Fringes Electricians (Excluding Communication Low Voltage Wiring and Lightning Protection Wiring)...............$ 33.45 11.35+a a. PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day. ---------------------------------------------------------------- IRON0201-001 05/01/2008 Rates Fringes Ironworkers: Reinforcing.................$ 26.15 12.08 ---------------------------------------------------------------- * MARB0003-001 05/01/2008 Rates Fringes Mosaic & Terrazzo Worker, Tile Layer Marble Mason and Tile Layer.$ 25.01 8.82 Terrazzo Worker.............$ 25.76 8.82 ---------------------------------------------------------------- * MARB0003-004 05/01/2008 Rates Fringes Marble, Tile & Terrazzo Finisher.........................$ 20.15 7.97 ---------------------------------------------------------------- PAIN0051-004 06/01/2008 Rates Fringes Glaziers Contracts $2 million and under.......................$ 25.12 7.46 Contracts over $2 million...$ 27.84 7.46 ---------------------------------------------------------------- PAIN0051-011 06/01/2008 Rates Fringes Painter, Brush, Spray and Roller (Exluding Drywall Finishing).......................$ 24.31 7.56 ---------------------------------------------------------------- PLAS0891-003 05/01/2007 Rates Fringes Cement Mason/Concrete Finisher...$ 26.15 6.01 ---------------------------------------------------------------- PLUM0005-004 10/21/2007 Rates Fringes Plumbers Apartment Buildings over 4 stories (except hotels). schools, colleges and speculative office buiidings, strip shopping centers. churches, water coolers, room air conditioning units, appliances, packaged ice machines and light commercial refrigeration and/or airconditioning; systems serving a single business in a single story building and not to exceed 5 h.p. or tons, self- contained package unit up to and including 5 h.p. or tons........................$ 21.54 8.33+a ALL Other Work..............$ 33.92 12.94+a a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July. ---------------------------------------------------------------- PLUM0602-001 11/01/2007 Rates Fringes Steamfitter, Refrigeration & Air Conditioning Mechanic........$ 33.27 13.57+a a. PAID HOLIDAYS: New Year's Day,Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day. ---------------------------------------------------------------- SHEE0100-002 07/01/2008 Rates Fringes Sheet Metal Worker (Including HVAC Duct Work)..................$ 33.04 12.12 ---------------------------------------------------------------- SUVA2000-002 05/12/2000 Rates Fringes BRICKLAYER.......................$ 18.11 Carpenters (Including Batt Insulation)......................$ 16.62 3.07 Laborers: Mason Tenders, Brick........$ 10.73 Unskilled...................$ 10.73 Sprinkler Fitters................$ 14.54 1.70 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION