General Decision Number: SD080005 04/11/2008 SD5 Superseded General Decision Number: SD20070007 State: South Dakota Construction Type: Building Counties: Aurora, Beadle, Bon Homme, Brookings, Brule, Buffalo, Charles Mix, Clay, Davison, Douglas, Hand, Hanson, Hughes, Hutchinson, Hyde, Jerauld, Kingsbury, Lake, McCook, Miner, Moody, Sanborn, Sully, Turner and Yankton Counties in South Dakota. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including four (4) stories) Modification Number Publication Date 0 02/08/2008 1 04/11/2008 BRSD0001-002 05/01/2007 HANSON, LAKE, MCCOOK, MINER, MOODY, TURNER Rates Fringes Bricklayer/Blocklayer............$ 23.39 6.65 ---------------------------------------------------------------- BRSD0002-002 05/01/2006 BON HOMME, CHARLES MIX, DOUGLAS, HUTCHINSON & YANKTON COUNTIES: Rates Fringes Bricklayer/Blocklayer............$ 31.00 1.50 ---------------------------------------------------------------- BRSD0005-002 05/01/2007 BROOKINGS & KINGSBURY COUNTIES: Rates Fringes Bricklayer/Blocklayer............$ 26.82 6.50 ---------------------------------------------------------------- * SFSD0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 27.14 12.05 ---------------------------------------------------------------- SHEE1000-002 06/01/2005 Rates Fringes Sheet Metal Worker (All HVAC Work, Including Pipe & Duct Work and Installation of Systems).........................$ 19.04 7.67 ---------------------------------------------------------------- * SUSD2000-004 03/20/2000 Rates Fringes Carpenters: Acoustical Work.............$ 12.42 Drywall Hanging/Framing & Metal Stud Work.............$ 11.85 1.53 Form Building & Form Setting.....................$ 11.58 .58 All Other Work..............$ 12.34 1.40 Cement Mason/Concrete Finisher...$ 11.76 .58 Electricians: Low Voltage Wiring for Computors...................$ 14.40 2.36 All Other Work..............$ 15.48 3.30 GLAZIER..........................$ 10.66 1.04 Ironworkers: Reinforcing.................$ 9.08 .70 Structural..................$ 9.39 .77 Laborers: Brick Tender................$ 10.50 Common......................$ 8.25 .84 Plasterer Tender............$ 8.00 PAINTER Brush; Roller; & Spray......$ 11.19 1.21 PLASTERER........................$ 15.75 PLUMBER (Excluding HVAC Work)....$ 13.20 2.00 Power equipment operators: Backhoe.....................$ 11.50 Crane.......................$ 10.50 .58 Front End Loader............$ 13.28 ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 10.33 .40 Sheet metal worker All Work, excluding HVAC, Pipe & Duct Work & Installation of Systems.....$ 11.28 .51 Truck Driver, Dump...............$ 9.00 .56 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION