General Decision Number: OK080035 07/04/2008 OK35 Superseded General Decision Number: OK20070035 State: Oklahoma Construction Type: Building County: Canadian County in Oklahoma. BUILDING CONSTRUCTION PROJECTS, Excluding incidential utility work, (does not include residential construction consisting of single family homes and apartments up to and including 4 stories, sewage and water treatment plants or construction, alteration and repair of any facility engaged in manufacturing) Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/28/2008 3 04/11/2008 4 05/30/2008 5 07/04/2008 ASBE0094-004 07/16/2006 Rates Fringes Asbestos/Insulator Worker........$ 23.49 10.26 SCOPE OF WORK: Includes application of all insulation materials, protective coverings and finishings to all types of mechanical systems. ---------------------------------------------------------------- BROK0005-002 06/01/2007 CANADIAN AND MCCLAIN COUNTIES Rates Fringes BRICKLAYER.......................$ 22.61 8.30 ---------------------------------------------------------------- ELEC1141-006 05/28/2008 Rates Fringes ELECTRICIAN......................$ 24.40 17.25%+4.50 ---------------------------------------------------------------- ENGI0627-008 06/01/2007 Rates Fringes Power Equipment Operator Bobcat......................$ 20.45 9.00 Forklift (masonry)..........$ 18.20 9.00 ---------------------------------------------------------------- LABO0495-001 06/01/1993 Rates Fringes Brick Tender.....................$ 9.90 1.50 ---------------------------------------------------------------- PAIN0807-004 06/15/1999 Rates Fringes Painters: Brush.......................$ 14.15 3.00 Drywall Finishing & Spray...$ 14.65 3.00 ---------------------------------------------------------------- PAIN0807-005 10/01/2004 Rates Fringes GLAZIER..........................$ 14.14 2.95 ---------------------------------------------------------------- * PLUM0344-004 07/01/2008 Rates Fringes PLUMBER/PIPEFITTER (Including HVAC Work).......................$ 25.88 10.92 ---------------------------------------------------------------- SFOK0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 27.05 12.30 ---------------------------------------------------------------- SHEE0124-006 07/01/2001 Rates Fringes Sheet Metal Worker (Including HVAC duct work)..................$ 21.62 6.04 ---------------------------------------------------------------- SUOK1995-003 09/19/1995 Rates Fringes Carpenters: (Drywall Hanging & Acoustical Installation only).......................$ 12.18 2.39 (Excluding Drywall Hanging & Acoustical Installation)..$ 12.85 2.30 Laborers: General.....................$ 8.16 PLASTERER........................$ 14.49 Power Equipment Operator Backhoes....................$ 14.40 3.31 Bulldozer...................$ 14.40 3.40 Graders.....................$ 14.90 3.40 Loaders.....................$ 14.40 3.40 Scraper.....................$ 10.50 2.63 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION