General Decision Number: OK080002 02/08/2008 OK2 Superseded General Decision Number: OK20070002 State: Oklahoma Construction Types: Heavy Sewer and Water Line and Highway Counties: Adair, Alfalfa, Atoka, Beaver, Beckham, Blaine, Bryan, Caddo, Carter, Cherokee, Choctaw, Cimarron, Coal, Cotton, Craig, Custer, Delaware, Dewey, Ellis, Garvin, Grady, Grant, Greer, Harmon, Harper, Haskell, Hughes, Jackson, Jefferson, Johnston, Kay, Kingfisher, Kiowa, Latimer, Le Flore, Lincoln, Love, Major, Marshall, Mayes, McCurtain, McIntosh, Murray, Muskogee, Noble, Nowata, Okfuskee, Okmulgee, Ottawa, Pawnee, Payne, Pittsburg, Pontotoc, Pushmataha, Roger Mills, Seminole, Stephens, Texas, Tillman, Washington, Washita, Woods and Woodward Counties in Oklahoma. Construction, alteration, and/or repair of streets, highways, runways, erosion control structures and water and sewer utilities (but does not include building structures on highway rest areas) also excludes heavy construction within the city limits of Muskogee. Modification Number Publication Date 0 02/08/2008 SUOK1991-001 12/12/1991 Rates Fringes Air Tool Operator..............$ 6.50 Asphalt Raker..................$ 6.75 Blaster........................$ 8.75 Carpenter......................$ 8.50 Concrete Finisher-Paving.......$ 8.60 Concrete Finisher-Structures...$ 8.00 Concrete Rubber................$ 6.50 Flag Person....................$ 6.25 Form Builder-Structures........$ 7.50 Form Setter-Paving & Curb......$ 7.50 Form Setter-Structures.........$ 7.50 Labor Common...................$ 6.25 Manhole Inlet Builder..........$ 7.25 Mechanic.......................$ 9.00 Painter-Structures.............$ 7.00 Pile Driver....................$ 7.50 Pipelayer......................$ 7.50 Power equipment operators: ASPAHLT PAVING MACHINE SCREED......................$ 8.55 ASPHALT DISTIBUTOR..........$ 7.55 ASPHALT HOT-MIX PLANT.......$ 8.50 ASPHALT PAVING MACHINE......$ 8.55 BACKHOE-LOADER..............$ 8.30 BOX BLADE-LOADER............$ 7.55 BROOM/SWEEPER...............$ 7.00 BULLDOZER (150 H.P. & LESS).......................$ 8.40 BULLDOZER (OVER 150 H.P.).......................$ 8.75 CONCRETE MIXING PLANT.......$ 8.50 CONCRETE PAVING CURING/TEXTURE/FLOAT........$ 8.50 CONCRETE PAVING FINISHING MACHINE...........$ 8.55 CONCRETE PAVING FORM GRADER......................$ 8.20 CONCRETE PAVING GRINDER.....$ 7.60 CONCRETE PAVING JOINT SEALER......................$ 7.75 CONCRETE PAVING SPREADER....$ 8.50 CONCRETE SAW OPERATOR.......$ 7.40 CONCRETE SCREED MACHINE.....$ 7.75 CRANE, CLAMSHELL, DERRICK, DRAGLINE, SHOVEL (1 1/2 C.Y. & LESS).....................$ 7.95 DERRICK, DRAGLINE, SHOVEL (OVER 1 1/2 C.Y.).......................$ 8.50 CRUSHER & SCREENING PLANT.......................$ 8.25 CURB MACHINE (SLIPFORM).....$ 8.30 FOUNDATION DRILL, TRUCK MOUNTED.....................$ 11.85 FRONT END LOADER (2-1/2 C.Y. & LESS)................$ 7.75 FRONT END LOADER (OVER 2-1/2 C.Y.).................$ 8.45 HYDRAULIC EXCAVATOR.........$ 8.65 MOTOR GRADER (FINE GRADE)......................$ 9.05 MOTOR GRADER (ROUGH)........$ 8.00 PAVEMENT MAKING MACHINE.....$ 8.00 PLANER, MILLING MACHINE.....$ 8.25 PUGMILL MIXING PLANT........$ 7.15 PUMP CRETE..................$ 7.15 REINFORCING STEEL MACHINE.....................$ 7.40 ROLLER PNEUMATIC (SELF-PROPELLED)............$ 7.45 ROLLER STEEL-WHEEL (OTHER).....................$ 7.45 (PLANT-MIX).................$ 7.85 SCRAPER (17 C.Y. & LESS)....$ 8.30 SCRAPER (OVER 17 C.Y.)......$ 8.55 SELF-PROPELLED HAMMER.......$ 7.20 SIDE-BOOM...................$ 7.65 TRACTOR: CRAWLER (150 H.P. & LESS)................$ 7.15 TRACTOR: CRAWLER (OVER 150 H.P.)...................$ 7.50 TRACTOR: PNEUMATIC (80 H.P. OR LESS)...............$ 7.45 TRACTOR: PNEUMATIC (OVER 80 H.P.)..............$ 7.65 TRAVELING MIXER.............$ 7.25 TRENCHING MACHINE...........$ 8.25 WAGON DRILL, BORING MACHINE OR POST HOLE........$ 6.60 Reinforcing Steel Setter Paving.........................$ 7.50 Reinforcing Steel Setter Structures.....................$ 7.50 Servicer.......................$ 7.75 Sign Erector...................$ 8.00 Spreader Box Person............$ 7.00 Steelworker Structural.........$ 7.50 Traffic Control Device Monitor........................$ 7.00 Traffic Signal Installer.......$ 11.50 Truck Driver LOWBOY, FLOAT...............$ 8.60 SINGLE AXLE, 2 TONS & UNDER.......................$ 6.85 SINGLE AXLE, OVER 2 TONS....$ 7.05 TANDEM AXLE & SEMITRAILOR.................$ 7.30 Vibrator Operator - Hand Type...........................$ 6.25 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidential. ---------------------------------------------------------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION