General Decision Number: OH080032 07/04/2008 OH32 Superseded General Decision Number: OH20070032 State: Ohio Construction Type: Building County: Cuyahoga County in Ohio. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 03/07/2008 2 05/02/2008 3 06/06/2008 4 07/04/2008 ASBE0003-006 08/01/2007 Rates Fringes Heat and Frost Insulator.........$ 32.98 12.85 ---------------------------------------------------------------- * BOIL0744-008 07/01/2008 Rates Fringes BOILERMAKER......................$ 35.34 17.48 ---------------------------------------------------------------- * BROH0005-001 05/01/2008 Rates Fringes Bricklayer, Caulker, Cleaner, Pointer..........................$ 29.47 10.50 ---------------------------------------------------------------- BROH0005-009 06/01/2007 Rates Fringes TILE FINISHER....................$ 25.15 9.30 ---------------------------------------------------------------- BROH0036-001 05/01/2008 Rates Fringes TILE SETTER......................$ 27.92 10.65 ---------------------------------------------------------------- CARP0254-001 05/01/2008 Rates Fringes CARPENTER Including acoustical ceilings, cabinets, concrete forms, drywall hanging, hardwood flooring and soft floors.............$ 29.50 11.17 ---------------------------------------------------------------- CARP1871-022 05/01/2008 Rates Fringes MILLWRIGHT.......................$ 28.00 12.67 ---------------------------------------------------------------- * ELEC0038-001 05/05/2008 Rates Fringes ELECTRICIAN Including Low Voltage Wiring for Alarms and HVAC..$ 33.78 15.63 ---------------------------------------------------------------- ENGI0018-018 05/01/2008 Rates Fringes OPERATOR: Power Equipment Backhoe.....................$ 32.13 10.81 Boom & Jib 300' and Over....$ 33.13 10.81 Bulldozer...................$ 31.98 10.81 Crane: Boom & Jib 200' and Over, Up to 299'............$ 32.88 10.81 Oiler.......................$ 22.35 10.81 ---------------------------------------------------------------- IRON0017-005 08/01/2007 Rates Fringes IRONWORKER Structural, including metal buildings and overhead doors & REINFORCING.................$ 27.40 17.58 ---------------------------------------------------------------- LABO0310-001 05/01/2008 Rates Fringes LABORER Unskilled & Brick Mason Tender......................$ 24.03 12.75 ---------------------------------------------------------------- PAIN0006-001 05/01/2008 Rates Fringes PAINTER (Including Epoxy and Spray) COMMERCIAL NEW WORK; REMODELING & RENOVATIONS Brush and Roller...........$ 26.59 10.17 Spray......................$ 27.29 10.17 COMMERCIAL REPAINT Brush and Roller...........$ 25.09 10.17 Spray......................$ 25.79 10.17 ---------------------------------------------------------------- PAIN0006-007 05/01/2008 Rates Fringes PAINTER Taper/Drywall Finisher......$ 27.29 10.17 ---------------------------------------------------------------- PAIN0181-001 05/01/2007 Rates Fringes GLAZIER..........................$ 27.67 10.85 ---------------------------------------------------------------- PLAS0080-001 05/01/2008 Rates Fringes PLASTERER........................$ 29.21 10.80 ---------------------------------------------------------------- PLAS0404-001 05/01/2006 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 27.55 10.89 ---------------------------------------------------------------- PLUM0055-001 05/01/2008 Rates Fringes PLUMBER Work on Water Lines, Gas Lines, Sewer Lines, etc. from the building to the street......................$ 21.57 7.78 All Other Work - Excluding HVAC........................$ 31.50 17.75 ---------------------------------------------------------------- PLUM0120-001 05/01/2008 Rates Fringes PIPEFITTER "A and B" Including HVAC Work and Fire Sprinkler Systems.....................$ 33.17 16.10 ---------------------------------------------------------------- ROOF0044-002 05/01/2008 Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 26.95 14.30 ---------------------------------------------------------------- SHEE0033-030 05/01/2008 Rates Fringes Sheet Metal Mechanic Including HVAC & Siding and Decking Work............$ 32.51 14.34 ---------------------------------------------------------------- SUOH2001-002 03/09/2001 Rates Fringes LABORER Fence Erector...............$ 11.58 1.42 Power Equipment Operator Excavator...................$ 18.23 4.39 ---------------------------------------------------------------- TEAM0436-001 05/01/2008 Rates Fringes TRUCK DRIVER Pickup......................$ 24.45 10.35 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION