General Decision Number: OH120003 01/27/2012 OH3 Superseded General Decision Number: OH20100003 State: Ohio Construction Type: Building Counties: Columbiana, Mahoning and Trumbull Counties in Ohio. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 01/06/2012 1 01/13/2012 2 01/20/2012 3 01/27/2012 ASBE0084-003 07/02/2011 Rates Fringes ASBESTOS WORKER/INSULATOR (Includes application of all insulating materials, protective coverings coatings & finishings to all types of mechanical systems)..............$ 28.22 15.50 ---------------------------------------------------------------- ASBE0207-011 07/01/2009 Rates Fringes HAZARDOUS MATERIAL HANDLER (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 23.60 9.80 ---------------------------------------------------------------- BOIL0154-006 06/01/2011 COLUMBIANA Rates Fringes BOILERMAKER......................$ 41.25 20.97 ---------------------------------------------------------------- BOIL0744-004 07/01/2009 MAHONING & TRUMBULL Rates Fringes BOILERMAKER......................$ 36.84 17.48 ---------------------------------------------------------------- BROH0006-011 05/01/2010 COLUMBIANA (Knox, Butler, West & Hanover Townships) Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.95 10.98 ---------------------------------------------------------------- BROH0008-002 06/01/2011 COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton & Unity Townships and the city of New Waterford), MAHONING & TRUMBULL Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 25.55 15.34 ---------------------------------------------------------------- BROH0008-003 06/01/2011 COLUMBIANA (Center, Elk Run, Fairfield, Middleton, New Waterford, Perry, Salem & Unity Townships) & MAHONING Rates Fringes Marble Setter, Terrazzo Worker & Tile Setter.............$ 25.42 12.38 ---------------------------------------------------------------- BROH0008-005 06/01/2011 COLUMBIANA, MAHONING (Excluding Smith Township) & TRUMBULL Rates Fringes Marble Setter Finisher, Terrazzo Worker Finisher, Tile Setter Finisher.............$ 22.55 12.04 ---------------------------------------------------------------- BROH0010-005 07/01/2011 COLUMBIANA COUNTY (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) Rates Fringes BRICKLAYER BRICKLAYERS; CAULKERS; CLEANERS; CEMENT BLOCKLAYERS; MARBLE SETTERS; POINTERS; STONEMASONS & TERRAZZO WORKERS.....................$ 25.82 14.09 TILE FINISHER....................$ 20.82 14.09 TILE SETTER......................$ 23.82 14.09 ---------------------------------------------------------------- CARP0003-001 10/01/2011 MAHONING & TRUMBULL Rates Fringes Carpenter & Soft Floor Layer.....$ 24.87 13.19 ---------------------------------------------------------------- CARP0171-004 10/01/2011 COLUMBIANA Rates Fringes Carpenter & Soft Floor Layer.....$ 25.02 13.62 ---------------------------------------------------------------- CARP1871-016 10/01/2011 MAHONING & TRUMBULL Rates Fringes PILEDRIVERMAN....................$ 25.62 13.28 ---------------------------------------------------------------- CARP1871-018 10/01/2011 MAHONING & TRUMBULL Rates Fringes MILLWRIGHT.......................$ 25.82 13.28 ---------------------------------------------------------------- CARP1871-021 10/01/2011 COLUMBIANA Rates Fringes MILLWRIGHT.......................$ 29.11 12.74 ---------------------------------------------------------------- CARP2235-008 01/01/2009 COLUMBIANA Rates Fringes PILEDRIVERMAN....................$ 28.85 12.10 Welder &/or Creosote........$ 29.15 12.10 ---------------------------------------------------------------- ELEC0064-002 11/28/2011 COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships) & TRUMBULL (Hubbard & Liberty Townships) Rates Fringes ELECTRICIAN......................$ 30.10 12.97 ---------------------------------------------------------------- ELEC0071-007 01/03/2011 Rates Fringes Line Construction Equipment Operator..........$ 28.13 11.25 Groundman...................$ 20.31 11.25 Lineman & Cable Splicers....$ 31.25 11.25 ---------------------------------------------------------------- ELEC0246-002 10/31/2011 COLUMBIANA COUNTY (South of Butler, Fairfield, Knox, Salem & Unity Townships) Rates Fringes ELECTRICIAN......................$ 33.00 24.51+a FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday. ---------------------------------------------------------------- ELEC0540-004 12/26/2011 COLUMBIANA (Knox Township) and MAHONING (Smith Township) COUNTIES Rates Fringes ELECTRICIAN......................$ 27.60 17.56 ---------------------------------------------------------------- ELEC0573-004 11/28/2011 MAHONING (Milton Township) and TRUMBULL (Except Liberty & Hubbard Townships) Rates Fringes ELECTRICIAN......................$ 29.15 15.26 ---------------------------------------------------------------- * ELEV0045-003 01/01/2012 Rates Fringes ELEVATOR MECHANIC................$ 41.92 23.535+a+b PAID HOLIDAYS: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day. b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service. ---------------------------------------------------------------- ENGI0066-023 06/01/2011 COLUMBIANA, MAHONING & TRUMBULL COUNTIES Rates Fringes OPERATOR: Power Equipment ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - A & B.............$ 35.93 15.51 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - A & B.............$ 35.60 15.51 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - A & B.............$ 32.27 15.51 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - A & B.............$ 28.49 15.51 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - A & B.............$ 25.09 15.51 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - C & D.............$ 32.93 15.51 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - C & D.............$ 32.64 15.51 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - C & D.............$ 29.58 15.51 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - C & D.............$ 26.11 15.51 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - C & D.............$ 23.00 15.51 ALL OTHER WORK GROUP 1.....................$ 29.94 15.51 ALL OTHER WORK GROUP 2.....................$ 29.67 15.51 ALL OTHER WORK GROUP 3.....................$ 26.89 15.51 ALL OTHER WORK GROUP 4.....................$ 23.74 15.51 ALL OTHER WORK GROUP 5.....................$ 20.91 15.51 GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug; Boring Machine Attached to Tractor; Bullclam; Bulldozer; C.M.I. Road Builder & Similar Type; Cable Placer & Layer; Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom; Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead; Crane-Rough Terrain; Crane-Side Boom; Crane-Truck; Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge; Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile; Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail; Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum; Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer; Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine; Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar); Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine; Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing; Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper; Tractor-Double Boom; Tractor with Attachments; Truck-Boom; Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type) GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer; Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork lift & Lulls; Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden); Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor; Curb Builder, self-propelled; Drill Wagon; Generator Set; Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller; Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter; Tractor; Trencher Form; Water Blaster; Steam Jenny; Syphon; Vibrator-Gasoline; & Welding Machine GROUP 5 - Brakeperson; Fireperson; & Oiler ---------------------------------------------------------------- IRON0207-005 06/01/2011 COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224) & TRUMBULL Rates Fringes IRONWORKER Layout; Sheeter.............$ 28.06 18.46 Ornamental; Reinforcing; Structural..................$ 27.06 18.46 ---------------------------------------------------------------- IRON0550-002 05/01/2011 COLUMBIANA (W. of a line from Damascus to Highlandtown) & MAHONING (S. of Old Rte #224) Rates Fringes Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.38 16.73 ---------------------------------------------------------------- LABO0125-001 06/01/2010 MAHONING & TRUMBULL Rates Fringes LABORER HAZARDOUS WASTE Level A....................$ 23.42 8.30 Level B....................$ 16.18 8.30 Level C....................$ 23.07 8.30 Level D....................$ 23.42 8.30 ALL OTHER WORK GROUP 1....................$ 23.12 8.30 GROUP 2....................$ 23.24 8.30 GROUP 3....................$ 23.36 8.30 GROUP 4....................$ 23.42 8.30 GROUP 5....................$ 23.62 8.30 LABORER CLASSIFICATIONS GROUP 1: Building & Construction Laborer; Asphalt Paving; Railroad Labor Construction; Carpenter Tender; Asbestos Removal GROUP 2: Mortar Mixer (Hand or Machine); Mason Tender; Jackhammer Operator; All Machine Driven Tools (Electric, gas or air) & operation of all Pumps Under 4"; Spiker; All Laborers Working in Concrete Such as Pouring, Puddling, Raking & Conveying; All Scaffold Help; Scrap Iron Burning GROUP 3: Hod Carrier; Rough Terrain Forklift Driver when tending Masons; Work Done by Laborers 7' or more in Depth GROUP 4: Laborer (Except Jackhammer) Working on Repair of Blast Furnace or Coke Plant & Auxiliary Facilities; Jackhammer Operator in Trench or Shaft 7' or more in depth; Concrete Buster; Pipelayer; Powder & Dynamite; Jackhammer on Blast Furnace or Coke Plant & Auxiliary Facilities GROUP 5: Wrench Laborer; Miner - Air Tool; Guniting & Sandblasting; Pumpcrete Operations; Build Up Rates - Blast Furnace; Ram Tight; Bellman & Hook-up Man; Lancing Blast Furnace ---------------------------------------------------------------- LABO0809-003 07/01/2010 COLUMBIANA Rates Fringes LABORER..........................$ 22.47 8.45 Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay ---------------------------------------------------------------- PAIN0476-002 06/01/2011 Rates Fringes PAINTER GROUP 1.....................$ 23.29 10.11 GROUP 2.....................$ 23.49 10.11 GROUP 3.....................$ 23.50 10.11 GROUP 4.....................$ 23.54 10.11 GROUP 5.....................$ 23.79 10.11 GROUP 6.....................$ 23.94 10.11 GROUP 7.....................$ 24.19 10.11 PAINTER CLASSIFICATIONS: GROUP 1: Painters, Brush & Roller GROUP 2: Drywall - Hand Finisher GROUP 3: Structural Steel GROUP 4: Wallpaper Hanger - Furnishing Own Tools GROUP 5: Spray, Except Bar Joist/Deck GROUP 6: Drywall - Mechanical Tools; Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 feet; and Swingstages GROUP 7: Sandblasting ---------------------------------------------------------------- PAIN0639-001 05/01/2011 Rates Fringes Sign Painter & Erector...........$ 20.61 3.50+a+b+c FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day; July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral ---------------------------------------------------------------- PAIN0847-002 06/01/2011 Rates Fringes GLAZIER..........................$ 25.16 12.94 ---------------------------------------------------------------- PLAS0179-001 06/01/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 26.70 13.31 ---------------------------------------------------------------- PLAS0179-002 06/01/2011 Rates Fringes PLASTERER........................$ 26.70 13.31 ---------------------------------------------------------------- PLUM0396-002 06/01/2011 COLUMBIANA (Excluding Washington & Yellow Creek Townships & Liverpool Township, Secs. 35 & 36, West of County Road #427), MAHONING and TRUMBULL COUNTIES Rates Fringes PLUMBER/PIPEFITTER...............$ 28.21 16.30 ---------------------------------------------------------------- PLUM0495-003 06/01/2011 COLUMBIANA COUNTY (Washington & Yellow Creek Townships and Liverpool Township - Sections #35 & #36 - west of County Road #427) Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 33.32 18.16 ---------------------------------------------------------------- ROOF0071-004 06/01/2011 Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 22.30 14.38 ---------------------------------------------------------------- SFOH0669-003 04/01/2011 Rates Fringes SPRINKLER FITTER.................$ 32.20 17.50 ---------------------------------------------------------------- SHEE0033-007 06/01/2011 Rates Fringes Sheet metal worker...............$ 27.92 17.48 ---------------------------------------------------------------- TEAM0092-004 07/01/2008 COLUMBIANA COUNTY Rates Fringes Truck drivers: GROUP 1.....................$ 21.39 9.87 GROUP 2.....................$ 21.43 9.87 GROUP 3.....................$ 21.47 9.87 GROUP 4.....................$ 22.17 9.87 GROUP 5.....................$ 22.29 9.87 CLASSIFICATIONS GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier; Athry Wagon; Greaser; Tiremen; Articulated Dump GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump Truck; Semi Trailer & Tractor Trailer GROUP 3 - Tank Trucks (straight & semi) GROUP 4 - Mechanic GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck; Distributor Truck (front & back end) & Truck Crane ---------------------------------------------------------------- TEAM0377-004 06/01/2009 MAHONING & TRUMBULL COUNTIES Rates Fringes TRUCK DRIVER GROUP 1.....................$ 22.42 11.51 GROUP 2.....................$ 22.99 11.51 TRUCK DRIVER CLASSIFICATIONS GROUP 1 - Dump; Water; Stake Body; Batch; Flat Bottom; Pick Up; Tandem GROUP 2 - Semi; Semi Water; Mixer; Fuel; Distributor; Carry All; Euclid Wagon; DW 10 Caterpillar (Equivalent); Tractor Trailer (Low Boy); Tri-axel ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION