General Decision Number: NY100096 06/04/2010 NY96 Superseded General Decision Number: NY20080096 State: New York Construction Type: Building County: Franklin County in New York. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 03/12/2010 1 06/04/2010 ASBE0040-004 05/01/2009 Rates Fringes ASBESTOS WORKER/HEAT & FROST INSULATOR Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechnical systems.....................$ 27.14 16.88 ---------------------------------------------------------------- BOIL0175-002 10/01/2007 Rates Fringes BOILERMAKER......................$ 27.23 17.97 ---------------------------------------------------------------- BRNY0002-026 06/01/2009 PLATTSBURGH CHAPTER Rates Fringes BRICKLAYER.......................$ 23.78 14.62 CEMENT MASON/CONCRETE FINISHER...$ 23.78 14.62 TILE FINISHER....................$ 21.86 12.88 TILE SETTER......................$ 27.43 15.38 ---------------------------------------------------------------- * CARP1042-001 06/01/2010 Rates Fringes CARPENTER, Including Drywall Hanging and Form Work............$ 23.66 14.76 ---------------------------------------------------------------- ELEC0910-004 04/01/2009 Rates Fringes ELECTRICIAN (Including Low Voltage Wiring and Installation of Alarms, Computers, Phones, & HVAC Temperature Controls Including Teledata & Sound Technicians).....................$ 29.25 15.28 ---------------------------------------------------------------- ENGI0106-009 07/01/2009 Rates Fringes OPERATOR: Bobcat/Skid Loader; Bulldozer; Core & Well Drill (One Drum)............$ 31.39 18.88+a Concrete Pump, Truck Mounted; Crane Oiler........$ 28.82 18.88+a Excavator; Tractor Mounted Drill; Self Contained Crawler Drill; Hydraulic Rock Drill..................$ 32.30 18.88+a FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day ---------------------------------------------------------------- IRON0440-012 05/01/2009 Rates Fringes IRONWORKER, REINFORCING..........$ 23.63 19.16 ---------------------------------------------------------------- LABO0322-007 06/01/2009 Rates Fringes LABORER Grade Checker; Landscape; Brick Mason Tender; Mortar Mixer.......................$ 20.07 13.81 ---------------------------------------------------------------- PAIN0009-019 05/01/2009 Rates Fringes Painters: Brush, Roller & Spray; Drywall Finishing/Taping....$ 20.84 9.95 ---------------------------------------------------------------- PLUM0773-007 05/01/2009 Rates Fringes PIPEFITTER, Including HVAC Pipe Installation................$ 29.20 18.03 PLUMBER..........................$ 29.20 18.03 ---------------------------------------------------------------- SFNY0669-006 04/01/2008 Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 29.90 16.30 ---------------------------------------------------------------- SHEE0083-003 06/01/2009 Rates Fringes SHEETMETAL WORKER, Including HVAC Duct Installation...........$ 27.81 20.11 ---------------------------------------------------------------- SUNY2009-020 09/30/2009 Rates Fringes IRONWORKER, ORNAMENTAL...........$ 20.75 15.29 IRONWORKER, STRUCTURAL...........$ 22.00 13.60 LABORER: Asphalt Shoveler.......$ 20.89 8.95 LABORER: Common or General......$ 18.46 9.10 LABORER: Mason Tender - Cement/Concrete..................$ 18.72 9.51 LABORER: Pipelayer..............$ 21.06 14.30 LABORERS: Asbestos Abatement (Removal from Floors, Ceiling, Walls and Mechanical Systems).........................$ 19.76 9.45 OPERATOR: Auger.................$ 21.19 15.85 OPERATOR: Backhoe...............$ 25.05 7.45 OPERATOR: Crane.................$ 23.94 11.40 OPERATOR: Forklift..............$ 22.45 9.34 OPERATOR: Loader................$ 18.00 0.00 OPERATOR: Paver.................$ 23.59 9.95 OPERATOR: Roller................$ 17.75 5.89 ROOFER, Including Modified Bitumen, Rubber, Shake, Shingle, Single Ply and Tear Off..............................$ 21.00 11.32 TRUCK DRIVER: Dump Truck........$ 16.00 2.62 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION