General Decision Number: NY100092 04/30/2010 NY92 Superseded General Decision Number: NY20080092 State: New York Construction Type: Building County: Columbia County in New York. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 03/12/2010 1 04/30/2010 * BOIL0197-003 01/01/2010 Rates Fringes BOILERMAKER......................$ 30.24 20.03 ---------------------------------------------------------------- BRNY0002-025 06/01/2009 ALBANY CHAPTER Rates Fringes BRICKLAYER, Including Caulking, Cleaning, and Pointing.........................$ 26.91 15.78 CEMENT MASON/CONCRETE FINISHER...$ 26.91 15.78 TILE FINISHER....................$ 21.86 12.88 TILE SETTER......................$ 27.43 15.38 FOOTNOTE: a. PAID HOLIDAYS: Memorial Day, July the 4th, Labor Day, Thankgiving Day (provided the employee is employed (1) day before and (1) day after the holiday. ---------------------------------------------------------------- CARP0019-006 07/01/2009 Rates Fringes CARPENTER, Including Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Form Work and Soft Floor/Vinyl Flooring Installation.....................$ 30.60 19.20 MILLWRIGHT.......................$ 30.60 19.20 ---------------------------------------------------------------- ELEC0236-009 06/01/2009 Rates Fringes ELECTRICIAN (Including Low Voltage Wiring)..................$ 30.50 17.09 ---------------------------------------------------------------- ENGI0106-017 07/01/2009 Rates Fringes OPERATOR: Bobcat/Skid Loader; Core & Well Drill (One Drum).......$ 31.39 18.88+a Concrete Pump, Truck Mounted; Crane Oiler; Forklift....................$ 28.82 18.88+a Crane 150 Feet & Under......$ 31.98 18.88+a Crane Over 150 Feet; Tower Crane.......................$ 33.24 18.88+a Crane Over 200 Feet.........$ 33.74 18.88+a Excavator; Tractor Mounted Drill; Self Contained Crawler Drill; Hydraulic Rock Drill; Front-end Rubber Tire Loader..........$ 32.30 18.88+a FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day ---------------------------------------------------------------- IRON0012-016 05/01/2009 Rates Fringes IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL.......$ 26.25 17.39 ---------------------------------------------------------------- LABO0017-015 06/01/2009 Twps of Ancram, Claverack, Clermont, Copake, Gallatin, Germantown, Greenport, Hillsdale, Livingston, Philmont Taghkanic & the City of Hudson Rates Fringes LABORER Grade Checker; Landscape; Brick Mason Tender; Cement/Concrete Mason Tender; Mortar Mixer........$ 28.75 17.90 ---------------------------------------------------------------- LABO0190-005 07/01/2009 Twps of Stuyvesant, Stockport, Kinderhook, New Lebanon, Canaan, Ghent, Chatham & Austerlitz Rates Fringes LABORER Grade Checker; Landscape; Brick Mason Tender; Cement/Concrete Mason Tender; Mortar Mixer........$ 21.81 14.72 ---------------------------------------------------------------- PAIN0009-013 07/01/2009 Rates Fringes GLAZIER..........................$ 22.50 13.46 ---------------------------------------------------------------- PAIN0155-001 05/01/2009 Rates Fringes PAINTER Brush & Roller; Drywall Finisher/Taper..............$ 26.39 15.11 Spray.......................$ 27.39 15.11 ---------------------------------------------------------------- PLUM0007-005 05/01/2009 Rates Fringes PIPEFITTER, Including HVAC Pipe Installation................$ 31.41 18.33 PLUMBER..........................$ 31.41 18.33 ---------------------------------------------------------------- ROOF0241-002 06/01/2006 Rates Fringes ROOFER, Including Modified Bitumen, Rubber, Shake, Shingle, Single Ply and Tear Off..............................$ 21.65 9.42 ---------------------------------------------------------------- SHEE0083-003 06/01/2009 Rates Fringes SHEETMETAL WORKER, Including HVAC Duct Installation...........$ 27.81 20.11 ---------------------------------------------------------------- SUNY2009-016 09/30/2009 Rates Fringes INSULATOR - PIPE & PIPEWRAPPER...$ 26.93 9.00 LABORER: Asphalt Shoveler.......$ 20.89 8.95 LABORER: Common or General......$ 15.00 0.60 LABORER: Pipelayer..............$ 21.06 14.30 OPERATOR: Auger.................$ 21.19 15.85 OPERATOR: Backhoe...............$ 17.00 3.56 OPERATOR: Bulldozer.............$ 17.25 4.23 OPERATOR: Paver.................$ 29.53 14.10 OPERATOR: Roller................$ 23.27 12.11 TRUCK DRIVER: Dump Truck........$ 16.00 2.62 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION