General Decision Number: NY080070 10/03/2008 NY70 Superseded General Decision Number: NY20070071 State: New York Construction Type: Building Counties: Fulton, Hamilton, Lewis and St Lawrence Counties in New York. BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 02/29/2008 3 05/09/2008 4 05/16/2008 5 05/23/2008 6 05/30/2008 7 06/06/2008 8 06/13/2008 9 06/20/2008 10 06/27/2008 11 07/04/2008 12 07/18/2008 13 08/08/2008 14 08/22/2008 15 10/03/2008 BOIL0175-002 10/01/2007 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes BOILERMAKER......................$ 27.23 17.97 ---------------------------------------------------------------- BOIL0197-003 10/01/2006 FULTON AND HAMILTON COUNTIES Rates Fringes BOILERMAKER......................$ 27.45 18.76 ---------------------------------------------------------------- CARP0229-004 06/01/2008 HAMILTON COUNTY Rates Fringes CARPENTER (Including Acoustical Ceilings & Drywall Hanging Cabinet & Metal Stud Installation and Scaffold Building)........................$ 24.04 12.80 FLOOR LAYER: CARPET (SOFT) FLOOR (Vinyl Only)..............$ 24.04 12.80 ---------------------------------------------------------------- CARP0370-002 06/01/2008 FULTON COUNTY Rates Fringes CARPENTER (Including Acoustical Ceiling and Drywall Hanging, Cabinet & Metal Stud Installation and Scaffold Building)...............$ 25.20 13.80 FLOOR LAYER: CARPET (SOFT) FLOOR (Vinyl Only)..............$ 25.20 13.80 ---------------------------------------------------------------- CARP0747-004 06/01/2008 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes CARPENTER (Including Acoustical Ceiling and Drywall Hanging, Cabinet & Metal Stud Installation and Scaffold Building)...............$ 23.69 13.84 FLOOR LAYER: CARPET (SOFT) FLOOR (Vinyl Only)..............$ 23.69 13.84 ---------------------------------------------------------------- ELEC0236-004 06/01/2007 FULTON AND HAMILTON COUNTIES Rates Fringes ELECTRICIAN......................$ 28.75 15.66 ---------------------------------------------------------------- ELEC0910-002 04/01/2008 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes ELECTRICIAN......................$ 29.25 13.78 ---------------------------------------------------------------- ELEC1249-003 05/05/2008 Rates Fringes LINE CONSTRUCTION: Lineman (LIGHTING AND TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 21.83 12.00+6.5%+a Groundman Truck Driver (tractor trailer unit)......$ 30.92 12.00+6.5%+a Groundman Truck Driver......$ 29.10 12.00+6.5%+a Lineman & Technician........$ 36.38 12.00+6.5%+a Mechanic....................$ 29.10 12.00+6.5%+a FOOTNOTE: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday. ---------------------------------------------------------------- ELEC1249-004 05/05/2008 Rates Fringes Line Construction: Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved): Cable Splicer..............$ 43.64 12.00+7%+a Flagman....................$ 23.80 12.00+7%+a Groundman digging machine operator...................$ 35.70 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 33.72 12.00+7%+a Groundman Truck driver.....$ 31.74 12.00+7%+a Lineman and Technician.....$ 39.67 12.00+7%+a Mechanic...................$ 31.74 12.00+7%+a Overhead transmission line work (where 40.09other trades are or have been involved): Cable Splicer..............$ 46.41 12.00+7%+a Overhead transmission line work (where other trades are or have been involved): Flagman....................$ 25.31 12.00+7%+a Groundman digging machine operator...................$ 37.97 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 35.86 12.00+7%+a Groundman truck driver.....$ 33.75 12.00+7%+a Lineman and Technician.....$ 42.19 12.00+7%+a Mechanic...................$ 33.75 12.00+7%+a Substation: Cable Splicer..............$ 43.64 12.00+7%+a Flagman....................$ 23.80 12.00+7%+a Ground man truck driver....$ 31.74 12.00+7%+a Groundman digging machine operator...................$ 35.70 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 33.72 12.00+7%+a Lineman & Technician.......$ 39.67 12.00+7%+a Mechanic...................$ 31.74 12.00+7%+a Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 45.08 12.00+7%+a Flagman....................$ 24.59 12.00+7%+a Groundman Digging Machine Operator...................$ 36.88 12.00+7%+a Groundman Truck Driver (tractor-trailer unit).....$ 34.83 12.00+7%+a Groundman Truck Driver.....$ 32.78 12.00+7%+a Lineman & Technician.......$ 38.87 11.75+7%+a Mechanic...................$ 32.78 12.00+7%+a TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT Cable splicer/Central Office Person..............$ 23.07 3.05+3% Groundman..................$ 11.61 3.05+3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 21.91 3.05+3% TREE TRIMMER................$ 18.92 4.05+3%+b FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday. b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day. ---------------------------------------------------------------- ENGI0106-007 07/01/2008 FULTON AND HAMILTON COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 31.98 17.67+a GROUP 2.....................$ 31.54 17.67+a GROUP 3.....................$ 30.63 17.67+a GROUP 4.....................$ 28.06 17.67+a FOOTNOTE: a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Crane (including crawler & hydraulic) GROUP 2: Excavator GROUP 3: Backhoe, Bulldozer, Loader GROUP 4: Forklift ---------------------------------------------------------------- ENGI0545-010 06/01/2008 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 27.15 17.10+a GROUP 2.....................$ 25.50 17.10+a FOOTNOTE: a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day provided the employee has worked five consecutive working days before and the working day after the holiday. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Backhoe, Crane (including crawler and hydraulic), Excavator, Loader GROUP 2: Bulldozer, Forklift ---------------------------------------------------------------- IRON0012-003 05/01/2008 FULTON COUNTY (Townships of Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth) HAMILTON COUNTY (Townships of Benson, Hope and Wells) Rates Fringes Ironworkers: Reinforcing, Rigging and Structural..................$ 25.65 17.96 Sheeter.....................$ 25.90 17.96 ---------------------------------------------------------------- IRON0440-004 05/01/2008 FULTON COUNTY (Remaining Townships); HAMILTON COUNTY (Remaining Townships); LEWIS and ST LAWRENCE COUNTIES Rates Fringes Ironworkers: Reinforcing, Rigging and Structural..................$ 23.13 18.76 ---------------------------------------------------------------- LABO0035-004 07/01/2002 FULTON COUNTY (Townships of Caroga, Ephrata, Oppenheim and Straford) and HAMILTON COUNTY Rates Fringes LABORER (Unskilled)..............$ 17.00 6.19 ---------------------------------------------------------------- LABO0157-002 07/01/2008 FULTON COUNTY (Remaining Townships) Rates Fringes LABORER (Unskilled)..............$ 22.08 12.90 ---------------------------------------------------------------- LABO0322-002 06/01/2007 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes LABORER (Unskilled)..............$ 19.62 11.41 ---------------------------------------------------------------- PAIN0004-025 08/01/2007 LEWIS COUNTY (Townships of High Market, Lewis, Leyden, Lyonsdale, Osceola, Turin and West Turin) Rates Fringes PAINTER (Brush & Roller).........$ 20.00 10.58 ---------------------------------------------------------------- PAIN0004-027 08/01/2007 LEWIS COUNTY (Remaining Townships) ST LAWRENCE COUNTY Rates Fringes PAINTER (Brush & Roller).........$ 19.98 10.79 ---------------------------------------------------------------- PAIN0009-012 05/01/2008 Rates Fringes PAINTER (Brush and Roller) Zone #1 All of FULTON COUNTY Painter/Wall Coverer, Drywall Finishers and Spray......................$ 24.34 6.30 Zone #2 All of HAMILTON COUNTY......................$ 22.00 8.64 ---------------------------------------------------------------- * PAIN0806-007 10/01/2008 FULTON AND HAMILTON COUNTIES Rates Fringes Painters: Structural Steel and Bridge.$ 45.25 27.58 ---------------------------------------------------------------- PLUM0007-003 05/01/2008 FULTON COUNTY, HAMILTON COUNTY (Townships of Arietta, Benson, Hope, Indian Lake, Lake Pleasant, Morehouse and Wells) Rates Fringes Plumbers and Pipefitters.........$ 30.31 17.18 ---------------------------------------------------------------- PLUM0073-004 05/19/2008 LEWIS COUNTY (Townships of Diana, Croghan, New Bremen, Watson, Greig, Martinsburg, Lewisville, Denmark, Harrisburg, Montague, Pinkney, Highmarket, Oscellia and Turin) AND ST LAWRENCE COUNTY Rates Fringes Plumbers and Pipefitters.........$ 25.44 12.71 ---------------------------------------------------------------- PLUM0112-008 05/01/2008 HAMILTON COUNTY (Remaining Townships) LEWIS COUNTY (Remaining Townships) Rates Fringes Plumbers and Pipefitters Northern Zone...............$ 28.15 15.10 ---------------------------------------------------------------- ROOF0195-002 06/01/2008 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.25 13.32 ---------------------------------------------------------------- ROOF0241-002 06/01/2006 FULTON AND HAMILTON COUNTIES Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 21.65 9.42 ---------------------------------------------------------------- SHEE0058-003 05/01/2008 LEWIS AND ST LAWRENCE COUNTIES Rates Fringes SHEETMETAL WORKER HVAC Duct Work..............$ 25.40 15.01 All Other Work..............$ 26.40 15.01 ---------------------------------------------------------------- SHEE0083-003 06/01/2008 FULTON AND HAMILTON COUNTIES Rates Fringes Sheet metal worker HVAC Duct Work..............$ 26.68 19.09+a SHEETMETAL WORKER All Other Work..............$ 26.68 19.09+a ---------------------------------------------------------------- SUNY1999-004 12/16/1999 Rates Fringes BRICKLAYER.......................$ 19.65 8.29 CEMENT MASON/CONCRETE FINISHER...$ 17.53 3.82 GLAZIER..........................$ 17.65 4.33 ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 17.48 6.77 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION