General Decision Number: NY080038 07/18/2008 NY38 Superseded General Decision Number: NY20070039 State: New York Construction Types: Building, Heavy and Highway County: Cayuga County in New York. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY AND HGIGHWAY CONSTRUCTION PROJECTS. Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 02/29/2008 3 04/04/2008 4 05/16/2008 5 06/06/2008 6 06/20/2008 7 06/27/2008 8 07/04/2008 9 07/18/2008 ASBE0030-001 06/01/2005 Rates Fringes Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 24.85 11.04 HAZARDOUS MATERIAL HANDLER SCOPE OF WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 18.72 9.95 ---------------------------------------------------------------- BOIL0175-001 10/01/2007 Rates Fringes BOILERMAKER......................$ 27.23 17.97 ---------------------------------------------------------------- BRNY0002-014 07/01/2007 SYRACUSE CHAPTER Rates Fringes BRICKLAYER BRICKLAYERS, STONEMASONS, CEMENT MASONS, PLASTERERS, POINTER, CLEANERS & CAULKERS....................$ 24.23 13.08 MARBLE, TILE AND TERRAZZO FINISHERS...................$ 19.56 11.15 MARBLE, TILE, AND TERRAZZO WORKERS....................$ 22.46 11.55 ---------------------------------------------------------------- BRNY0002-015 07/01/2007 HEAVY & HIGHWAY CONSTRUCTION Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 26.43 13.18+a FOOTNOTE: a. Paid Holidays: Memorial Day, July the 4th, Labor Day, Thanksgiving Day (provided the employee is employed one day before and one day after the holiday). ---------------------------------------------------------------- CARP0453-001 07/01/1999 Rates Fringes Carpenters: BUILDING CONSTRUCTION CARPENTER..................$ 18.01 5.435 MILLWRIGHTS & PILEDRIVERMEN..............$ 19.01 5.435 HEAVY AND HIGHWAY CONSTRUCTION CARPENTERS.................$ 20.90 7.325 ---------------------------------------------------------------- ELEC0043-009 06/01/2008 Rates Fringes Electricians: ENTIRE COUNTY, except Township of Genoa CABLE SPLICING.............$ 31.90 15.49 ELECTRICIANS...............$ 29.00 15.49 ---------------------------------------------------------------- ELEC0241-004 06/01/2008 REMAINDER OF COUNTY Rates Fringes ELECTRICIAN......................$ 29.50 18.93 ---------------------------------------------------------------- ELEC1249-003 05/05/2008 Rates Fringes LINE CONSTRUCTION: Lineman (LIGHTING AND TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems) Flagman.....................$ 21.83 12.00+6.5%+a Groundman Truck Driver (tractor trailer unit)......$ 30.92 12.00+6.5%+a Groundman Truck Driver......$ 29.10 12.00+6.5%+a Lineman & Technician........$ 36.38 12.00+6.5%+a Mechanic....................$ 29.10 12.00+6.5%+a FOOTNOTE: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday. ---------------------------------------------------------------- ELEC1249-004 05/05/2008 Rates Fringes Line Construction: Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved): Cable Splicer..............$ 43.64 12.00+7%+a Flagman....................$ 23.80 12.00+7%+a Groundman digging machine operator...................$ 35.70 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 33.72 12.00+7%+a Groundman Truck driver.....$ 31.74 12.00+7%+a Lineman and Technician.....$ 39.67 12.00+7%+a Mechanic...................$ 31.74 12.00+7%+a Overhead transmission line work (where 40.09other trades are or have been involved): Cable Splicer..............$ 46.41 12.00+7%+a Overhead transmission line work (where other trades are or have been involved): Flagman....................$ 25.31 12.00+7%+a Groundman digging machine operator...................$ 37.97 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 35.86 12.00+7%+a Groundman truck driver.....$ 33.75 12.00+7%+a Lineman and Technician.....$ 42.19 12.00+7%+a Mechanic...................$ 33.75 12.00+7%+a Substation: Cable Splicer..............$ 43.64 12.00+7%+a Flagman....................$ 23.80 12.00+7%+a Ground man truck driver....$ 31.74 12.00+7%+a Groundman digging machine operator...................$ 35.70 12.00+7%+a Groundman truck driver (tractor trailer unit).....$ 33.72 12.00+7%+a Lineman & Technician.......$ 39.67 12.00+7%+a Mechanic...................$ 31.74 12.00+7%+a Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 45.08 12.00+7%+a Flagman....................$ 24.59 12.00+7%+a Groundman Digging Machine Operator...................$ 36.88 12.00+7%+a Groundman Truck Driver (tractor-trailer unit).....$ 34.83 12.00+7%+a Groundman Truck Driver.....$ 32.78 12.00+7%+a Lineman & Technician.......$ 38.87 11.75+7%+a Mechanic...................$ 32.78 12.00+7%+a TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT Cable splicer/Central Office Person..............$ 23.07 3.05+3% Groundman..................$ 11.61 3.05+3% Installer Repairman- Teledata Lineman/Tecnician- Equipment Operator.........$ 21.91 3.05+3% TREE TRIMMER................$ 18.92 4.05+3%+b FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday. b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas Day. ---------------------------------------------------------------- ENGI0545-001 06/01/2008 BUILDING Rates Fringes Power equipment operators: GROUP 1.....................$ 27.15 17.10+a GROUP 2.....................$ 25.50 17.10+a GROUP 3.....................$ 22.19 17.10+a GROUP 4.....................$ 28.71 17.10+a POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING) GROUP 1: Air plako, asphalt and blacktop roller, automated concrete spreader (CMI or equivalent), automated fine grade machine (CMI), backhoe, elt palcer, blacktop spreader (such as barber Green & Blaw Knox), blacktop plant (automated), blast or rotary drill (truck or cat mounted), boom truck, cableway, caisson auger, central mix plant (automated), cherry picker (15 tons), concrete pump, crane, crusher (rock), derrick, diesel power unit, dragline, dredge, dual drum paver, elevating grader (self-propelled), elevator hoist (2 cage), excavator (all purpose-hydraulically operated), fork lift (loed and lull and other rough terrain type), front end loader (4 c.y. and over), gradall, grader (power), head tower (Saurman or equal), host ( 2 or 3 drum), hydroblaster (laser pump), work boat operator (LCM), light plants (compressors and generators), locomotive,maintenance engineer, maintenance welder, mine hoist, mucking machine or mole, overhead crane -fixed permanent, pile driver, quarry master or equivalent, refrigeration equipment (for soil stabilization), scraper sea mule, shovel, side boom, slip form paver, straddle buggy (ross carrier, lumber carrier), tractor drawn belt type loader (Euclid loader), tranching machine (digging capacity of over 4 ft depth), truck crane (operator), truck of trailer mounted log chipper (self feeder), tug operator (manned, rented equipment excluded), tunnel shovel, vibro or sonic hammer controls (when not mounted in proximity to the rig operator GROUP 2: "A" frame truck, blacktop plant (non automatic), All Back Dumps, Boring machine, bulldozer, cagehoist, central mix plant (non automated),cherry picker 15 tons and under), than 5), concrete paver (single drum over 16S), core boring machine, drill rigs (tractor mounted), elevator (as a material hoist), fork lift (all others), front end loader (under 4 c.y.), gunite machine, high pressure boiler 915 lbs & over), hoist (one drum), hydraulic breaking hammer (drop hammer), Kolman plant loader (screening gravel), maintenance grease man, mizer for stabilized base (self propelled Seaman mixer), monrail machine, parapet concrete or pavement grinder, parts man, post hole digger (truck or tractor mounted), power sweeper (wayne or similar), grout pump, pump- crete or sqeeze-crete, road widener (front end of grader or self prop.), roller, self contained hydraulic bench drill, shell winder (motorized), snorkel (overhead arms), snowblower control man, trenching machine (digging capacity of 4 ft or less), tugger hoist, vibrotamp, well drill, well point system, winch (motor driven), winch cat, winch truck GROUP 3: Compressor (up to 500 C.F.), concrete pave ror mixer (under 16S), concrete pavement spreaders and finishers (not automated), conveyor (over 12 ft), electric submersible pump (4" and over), farm tractor with or without accessories, fine grade machine (not automated), fireman, form tamper, generator (2,500 Watts and over), hydraulic pump, mechanical heaters (more than 2 whosw combined output exceeds 640,000 BTU per hour (manufacturer's rating) plus one self contained heating unit (sundog, air heat type, new Holland hay dryer type excluded), power heaterman (hay dryer), pumps (water and trash), revinus widener (road widener), single light plant, steam cleaner or jenny, tractor with or without towed accessories GROUP 4: Master mechanic PREMIUMS: Hazmat Work 2.50 Quad 9 Bulldozer or Multibowl Scraper .50 CRANE PREMIUMS (add to Group 1 Rate): All Lattice Boom Cranes (65 ton (capacity) and over Class A Rate Plus 1.25 All Hydraulic Cranes (100 ton capacity) and over Class A Rate Plus 1.25 All Hydraulic Cranes (80 ton capacity to 99 ton capacity) Class A Rate Plus .75 All Hydraulic Cranes (65 ton capacity to 79 ton capacity) Class A Rate Plus .60 FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day provided the employee has worked five consecutive working days before and the working day after the holiday. ---------------------------------------------------------------- ENGI0545-002 07/01/2008 HEAVY & HIGHWAY Rates Fringes Power equipment operators: GROUP 1.....................$ 28.15 19.75+a GROUP 2.....................$ 27.27 19.75+a GROUP 3.....................$ 23.99 19.75+a GROUP 4.....................$ 29.50 19.75+a POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY) GROUP 1: Automated Concrete Spreader (CMI Type); Automatic Fine Grader; Backhoe (Except Tractor Mounted, Rubber Tired); Belt Placer (CMI Type); Blacktop Plant (Automated); Boom Truck 100' & over (jib and Boom); Cableway; Caisson Auger; Central Mix Concrete Plant (Automated); Cherry Picker (over 5 tons capacity); Concrete Curb Machine, Self-propelled, Slipform; Concrete Pump 8" and over; Crane; Derricks; Dragline; Dredge; Dual Drum Paver; Excavator (All Purpose-Hydraulically operated) (Gradall or Similar); Front End Loader (4cu. yd. and over); Head Tower (Sauerman or equal); Hoist (Two or Three Drum); Holland Loader; Hydrodemolition equipment (self contained); Maintenance Engineer; Mine Hoist; Mucking Machine or Mole; Overhead Crane (Straddle Type); Pavement Profiler (over 300 horsepower); Pile Driver; Power Grader; Quad 9; Quarry Master (or equivalent); Scraper; Shovel; Side Boom; Slipform Paver (If a second man needed, he shall be an oiler); Tractor Drawn Belt-Type Loader; Truck Crane; Truck or Trailer Mounted Log Chipper (self Feeder); Tug Operator (Manned Rented Equipment Excluded); Tunnel shovel GROUP 2: Bituminous Spreader and Mixer; Blacktop Plant (Non- Automated); Blast or Rotary Drill (Truck or Tractor Mounted); Boring machine; Cage Hoist; Central Mix Plant (Non Automated) and all Concrete Batching Plants; Cherry Picker (5 Tons capacity and under); Compressors (4 or less) exceeding 2,000 C.F.M. combined capacity; Concrete Paver (over 16s); Concrete Pump (under 8"); Crawler Drill (self-contained); Crusher; Diesel Power Unit; Drill Rigs, Tractor Mounted; Front End Loader (under 4 cu. yd.); Greaser man, Hi-Pressure Boiler (15 lbs. and over); Hoist (One Drum); Kolman Plant Loader & Similar Type Loaders; L.C.M. Work Boat Operator; Locomotive; Mixer (for stabilizad base self- propelled); Monorail Machine; Plant Engineer; Pump Crete; Ready Mix Concrete Plant; Refrigeration Equipment (for soil stablization); Road Widener; Roller (all above sub-grade); Sea Mule; Seamule; Tractor with Dozer and/or Pusher; Trecher; Tugger Hoist; Welder; Winch; Winch Cat GROUP 3: A Frame Truck; Ballast Regulator, Ride on; Compressors (4 not to exceed 2,000 c.f.m. combined capacity; or 3 or less with more than 1,200 c.f.m. but not to exceed 2,000 c.f.m.); Compressors, Dust Collectors, Generators Pumps, Welding Machines, Light Plants (4 of any type or combination); Concrete Pavement Spreader and Finishers; Conveyer; Drill (core); Electric Pump used in conjunction with well-point system; Farm Tractor with accessories; Fine grade machine; Fork lift (under 15 ft.); Grout Pump; Gunite Machine; Hammers (Hydraulic self-propelled); Hydra Spiker, ride on; Hydro-blaster (water); Post Hole Digger and Post Driver; Power Sweeper; Roller (Grader and fill); Scarifier, ride on; Span-Saw, ride on; Submersible Electric Pump (when used in lieu of well point system); Tamper, ride on; Tie extractor, ride on; Tie Handler; Tie Inserter, ride on; Tie Spacer, ride on; Track Liner, ride on; Tractor with towed accessories; Vibatory Compactor; Well Point; Vibro Tamp GROUP 4: Master Mechanic PREMIUMS: Hazmat Work 2.50 CRANE PREMIUMS (Add to Group 1 Rate) Tower Crane (under 115 ft) 1.00 Boom length incl. jib over 115 - 149 ft 2.50 Boom length incl. jib over 150 ft 3.50 FOOTNOTE: a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee has worked the working day before and the working day after the holiday. ---------------------------------------------------------------- IRON0060-007 05/01/2008 Rates Fringes IRONWORKER Structural, Ornamental, Reinforcing, Pre-cast Concret Erector, Machinery Mover & Rigger, Fence Erector, Stone Derrikman, Welder, Sheeter, Sheeter Bucker-up...................$ 25.30 17.30 ---------------------------------------------------------------- LABO0633-005 07/01/2008 Rates Fringes Laborers BUILDING CONSTRUCTION Asbestos, Toxic and Hazardous Waste Removal....$ 22.02 11.85 Laborer....................$ 20.52 11.85 ASBESTOS REMOVAL: Removal of all asbestos containing materials from wall ceilings, floor columns, and other non-mechanical structures and surfaces. ---------------------------------------------------------------- LABO0633-006 07/01/2008 HEAVY & HIGHWAY CONSTRUCTION Rates Fringes Laborers: GROUP 1.....................$ 24.45 13.00+a GROUP 2.....................$ 25.15 13.00+a GROUP 3.....................$ 25.35 13.00+a GROUP 4.....................$ 26.15 13.00+a LABORER CLASSIFICATIONS (HEAVY & HIGHWAY CONSTRUCTION) GROUP 1: Laborers, flaggers, outboard and hand boats. GROUP 2: Bull float; chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh; small generators for laborers tools; installation of bridge drainage pipe, pipelayers, vibrator type rollers; tamper, drill doctor, tail or screw operator on asphalt paver, water pump (1-1/2" and singlediaphram); nozzle (asphalt, gunnite, seeding and sandblasting); laborers on chain link fence erection; rock splitter and power unit; pusher type concrete saw and all other gas, electric, oil and air tool operators; wrecking laborers. GROUP 3: All rock or drill machine operator (except quarry master and similar type); acetylene torch operator, asphalt raker, powderman. GROUP 4: Blaster, form setters, stone or granite curb setters. FOOTNOTE: a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has worked the working day before and the working day after the holiday. ---------------------------------------------------------------- PAIN0004-020 08/01/2007 Rates Fringes Painters: BUILDING CONSTRUCTION Brush & Roll, Drywall Taping/Finishing...........$ 20.00 10.58 Spray, Sandblasting, Structural Steel...........$ 20.50 10.58 HEAVY & HIGHWAY CONSTRUCTION Bridges....................$ 31.00 16.10 ---------------------------------------------------------------- PAIN0677-002 05/01/2007 Rates Fringes GLAZIER..........................$ 20.75 9.68 ---------------------------------------------------------------- PLUM0073-002 05/19/2008 REMAINDER OF COUNTY Rates Fringes Plumber, Pipefitter, Steamfitter COMMERCIAL: On all commercial, heating, plumbing, air conditioning, refrigeration and pipefitting work............$ 27.65 12.71 HVAC and REFRIGERATION SERVICE On all HVAC and refrigeration service work; all heating plumbing air conditioning, refrigeration; all servicing of same and Pipefitting work in all schools, hospitals, health related facilities and extended care facilities, including nursing homes AND On all commercial work where the total Plumbing Contract does not exceed 250,000.00; the Heating contract does not exceed 250,000.00 and Refrigeration contract does not exceed 250,000.00 and the total Plumbing, Heating and Refrigeration does not exceed 750,000.00..$ 24.05 12.71 ---------------------------------------------------------------- PLUM0267-004 05/01/2008 THE TOWN OF NEW HOPE Rates Fringes Plumber, Pipefitter, Steamfitter (Including HVAC Work)............................$ 28.11 15.62 ---------------------------------------------------------------- * ROOF0195-001 06/01/2008 Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.25 13.32 ---------------------------------------------------------------- SFNY0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 29.90 16.30 ---------------------------------------------------------------- * SHEE0058-001 05/01/2008 Rates Fringes Sheet Metal Worker Projects 10 million or less.$ 25.40 15.01 Projects over $10 million...$ 26.40 15.01 ---------------------------------------------------------------- TEAM0317-002 06/01/2002 BUILDING CONSTRUCTION Rates Fringes Truck drivers: Jobs where total project cost is $5 million or less..$ 16.43 8.21 Jobs where total project cost is over $5 million GROUP 1....................$ 17.43 8.36 GROUP 2....................$ 17.48 8.36 GROUP 3....................$ 17.58 8.36 GROUP 4....................$ 17.63 8.36 GROUP 5....................$ 17.83 8.36 TRUCK DRIVERS BUILDING CLASSIFICATIONS GROUP 1: Parts chasers. GROUP 2: Truck Driver GROUP 3: Tractor Trailer drivers, farm tractor and fuel truck drivers. GROUP 4: Material check and reciver. GROUP 5: Euclid driver. ---------------------------------------------------------------- TEAM0317-003 06/01/2003 HEAVY/HIGHWAY CONSTRUCTION Rates Fringes Truck drivers: GROUP 1....................$ 18.87 7.585+a GROUP 2....................$ 19.07 7.585+a FOOTNOTES: PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Christmas Day provided employee has worked the working day before and the working day after the holiday. Work on Hazardous Waste Sites Receive additional $1.50/hr. TRUCK DRIVERS HEAVY & HIGHWAY CLASSIFICATIONS GROUP 1: Pickups, panel trucks, flatboy material trucks (straight jobs), single-axle dump trucks, dupsters, receivers, greasers, truck tiremen, tandems and batch trucks, semi-trailers, low-boy trucks, asphalt distributor trucks, & agitator, mixer trucks & dumpcrete type vehicles, fuel trucks GROUP 2: Specialized earth moving equipment-euclid type, or similar off-highway equipment, where not self loaded,straddle (ross) carrier, and self-contained concrete mobile unit, off-highway tandem back-dump, twin engine euipment and double-hitched equipment where not self loaded. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION