General Decision Number: NV100054 04/23/2010 NV54 State: Nevada Construction Type: Highway County: Humboldt County in Nevada. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). Modification Number Publication Date 0 04/23/2010 SUNV2010-008 03/12/2010 Rates Fringes BRICKLAYER.......................$ 32.68 BRICKLAYER ZONE PAY: add the applicable amounts per hour, calculated based on a radius of over 50 miles from Washoe County Courthouse in Reno, Nevada: Zone 1: 0 to 35 miles: $0.00 Zone 2: over 35 to 75 miles: $1.25 Zone 3: over 75 miles: $5.37 CARPENTER........................$ 38.30 CARPENTER ZONE PAY: add the applicable amounts per hour, calculated from the Washoe County Courthouse: Zone 1: 0 to 50 miles: $0.00 (road miles of either the Carson City Courthouse or the Washoe County Courthouse) Zone 2: over 50 to 150 miles: $3.00 Zone 3: over 150 to 300 miles: $4.00 Zone 4: over 300 miles: $5.00 CEMENT MASON.....................$ 17.00 ELECTRICIAN Electrician: Neon Sign..................$ 44.31 Wireman....................$ 31.22 Line Construction: Equipment Specialist.......$ 47.86 Groundman..................$ 39.19 Lineman....................$ 57.91 Hod Carrier (Brick Mason Tender)..........................$ 30.10 HOD CARRIER ZONE PAY: add the applicable amounts per hour, calculated based on radius from the Washoe County Courthouse: Zone 1: 35 to 75 miles: $1.25 Zone 2: over 75 miles: $7.50 IRONWORKER.......................$ 54.38 LABORER Fence Erector...............$ 30.82 Flagperson..................$ 27.95 Highway Striper.............$ 33.57 Laborer.....................$ 30.82 LABORER ZONE PAY: add the applicable amounts per hour: Zone 1: 0 to 50 miles: $0.00 [radius from Carson City Courthouse or Washoe County Courthouse] Zone 2: over 50 to 150 miles: $2.00 (Based on a radius from the Washoe County Courthouse) Zone 3: over 150 to 300 miles: $3.00 (Based on a radius from the Washoe County Courthouse) Zone 4: over 300 miles: $4.00 (Based on a radius from the Washoe County Courthouse) MILLWRIGHT.......................$ 49.70 Operating Engineer: (All Other Work) Group 1....................$ 41.33 Group 1A...................$ 44.09 Group 2....................$ 44.62 Group 3....................$ 44.89 Group 4....................$ 45.63 Group 5....................$ 45.93 Group 6....................$ 46.10 Group 7....................$ 46.35 Group 8....................$ 46.94 Group 9....................$ 47.26 Group 10....................$ 47.61 Group 10A...................$ 47.80 Group 11....................$ 48.04 Group 11A...................$ 49.68 Group 11B...................$ 50.49 Lubrication & Service Engineer....................$ 46.10 ZONE PAY [ALL OPERATING ENGINEERS INCLUDING PILEDRIVERS, & STEEL ERECTION]: add the applicable amounts per hour calculated based on a radius from the Washoe County Courthouse: Zone 1: 0 to 50 miles: $0.00 (of either the Carson City Courthouse or the Washoe County Courthouse) Zone 2: over 50 to 150 miles: $2.00 Zone 3: over 150 to 300 miles: $3.00 Zone 4: over 300 miles: $4.00 OPERATING ENGINEER CLASSIFICATIONS: Group 1 Engineer Assistant Group 1A Heavy Duty Repairman Tender; Oiler; Parts man Group 2 Compressor; Material Loader and/or Conveyor (handling building materials); Pump Group 3 Bobcat or similar loader, under 1/4 cu. yd.; Concrete Curing Machines; Conveyor Belt (tunnel); Forklift (under 20'); Engineer Generating Plant (500 K.W.); Mixer Box (concrete plant); Motorman; Rotomist; Oiler (truck crane) Group 4 Concrete Mixer, Skip type; Dinky; Forklift (over 20') or Lumber Stacker; Ross Carrier; Skip Loader under 1 cu. yd; Tie Spacer Group 5 Concrete Mixers over 1 cu. yd.; Concrete Pumps or Pumpcrete Guns; Elevator and Material Hoist 1 drum; Groundman for Asphalt Milling and similar Group 6 Auger type drilling equipment up to 30 ft. depth digging capacity; Boom Truck or Dual Purpose A-Frame Truck; B.L.H. Lima Road Pactor or similar; Chip Box Spreader (Flaherty type or similar); Concrete Batch Plant (wet or dry); Concrete Saws; Locomotives (over 30 tons); Maginnis International Full Slab Vibrator; Mechanical Finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical Burn, Curb and/or Curb and Gutter Machine (concrete or asphalt); Pavement Breaker, Truck Mounted with compressor combination; Pavement Breaker or Tamper (with or without compressor combination); Power Jumbo (setting slip-forms, etc., in tunnels); Roller (except asphalt) Self-Propelled Tape Machine; Self-Propelled Compactor (single engine); Self-Propelled Power Sweeper; Slip- Form Pump (power-driven by hydraulic, electric, air, gas, etc. lifting device for concrete forms); Small Rubber-Tired Tractors; Snooper Crane, Paxton-Mitchell or similar; Stationary Pipe Wrapping, Cleaning and Bending Machine Group 7 Auger type drilling equipment over 30 ft. depth digging capacity; Compressor (over 2); Concrete Conveyor or Concrete Pump, truck or equipment mounted (any assistance required shall be performed by an Assistant to Engineer) Boom length to apply; Concrete Conveyor, Building Site; Drilling and Boring Machine, vertical and horizontal (not to apply to waterliners, wagon drills or jack hammers); Crusher Plant Engineer; Generators; Kolman Loader; Material Hoist 2 or more drums; Mechanical Finishers or Spreader Machine (asphalt, Barber- Greene or similar); Mine or Shaft Hoist; Pipe Bending Machines (pipeline only); Pipe Cleaning Machines (tractor-propelled and supported); Pipe Wrapping Machines (tractor-propelled and supported); Portable Crushing and Screening Plants; Post Driller and/or Driver; Pumps over 2; Roller (asphalt); Screedman (except asphalt or concrete paving); Screedman (Barber-Greene and similar) (asphalt or concrete paving); Self- Propelled Boom-Type Lifting Device (center mount) (on under 10 ton capacity) Slusher; Surface Heater and Planer; Trenching Machine (maximum digging capacity 3 ft. depth); Truck-Type Loader. Group 8 Asphalt Plant Engineer; Asphalt Milling Machine; Cast-In-Place Pipe-Laying Machine; Combination Slusher and Motor; Concrete Batch Plant (multiple units); Dozer; Drill Doctor; Elevating Grader; Grooving and Grinding Machine; Ken Seal; Loader (up to 2 1/2 cu. yds); Mechanical Trench Shield; Mixermobile; Push Cats; Road Oil Mixing Machine Wood-Mixer (and other similar Pugmill equipment); Rubber-Tired Earthmoving Equipment (up to 35 cu. yds. "struck", Euclids, T-Pulls, DW10, 20, 21 and similar); Self-Propelled Compactors with Dozer; Hyster 450, Cat 825 or similar; Sheepfoot; Small Tractor (with boom); Soil Stabilizer (P & H or equal); Timber Skidder (rubber-tired) or similar equipment; Tractor-Drawn Scraper; Tractor; Tractor- Mounted Compressor Drill Combination; Trenching Machine over 3 feet depth; Tri-Batch Paver; Tunnel Badger or Tunnel Boring Machine; Tunnel Mole Boring Machine; Vermeer T-600b Rock Cutter Group 9 Chicago Boom; Combination Backhoe and Loader (up to 3/8 cu. yd.); Combination Mixer and Compressor (gunite); Lull Hi-Lift (over 20 feet); Mucking Machine; Sub-Grader (Gurries or other types); Tractor with Boom (D6 or larger); Track-Laying-Type Earthmoving Machine (single engine with tandem scrapers) Group 10 Boom-Type Backfilling Machine; Bridge Crane; Cary-Lift or similar; Chemical Grouting Machine; Derricks; Derrick Barges (except excavation work); Euclid Loader and similar types; Grade Setter, Grade Checker; Heavy Duty Rotary Drill Rigs; Lift-Slab (Vagtborg and similar types); Loader over 2 1/2 cu. yds. up to 4 cu. yds.; Locomotive over 100 tons, single or multiple units; Multiple-Engine Earthmoving Machines (Euclid Dozers, etc.); Pre-Stress Wire Wrapping Machine; Rubber-Tired Scraper, Self-Loading; Single-Engine Scraper over 35 cu. yds.; Shuttle Car (Reclaim Station); Train Loading Station; Trenching Machine multi-engine with sloping attachments (Jefco or similar); Vacuum Cooling Plant; Whirley Crane (under 25 tons) Group 10A Backhoe-Hydraulic up to 1 cu. yd.; Backhoe up to 1 cu. yd.(Cable); CMI Dual Lane Auto-Grader SP30 or similar type; Cranes not over 25 tons (hammerhead and gantry); Finish Blade; Gradalls up to 1 cu. yd.; Motor Patrol; Power Shovels; Clamshells; Draglines; Cranes up to 1 cu. yd.; Rubber-Tired Scraper, Self-Loading (twin engine); Self-Propelled Boom-Type Lifting Device, center mount over 10 tons up to 25 tons. Group 11 Automatic Asphalt or Concrete Slip-Form Paver; Automatic Railroad Car Dumper; Canal Trimmer; Cary Lift, Campbell or similar type; Cranes over 25 tons; Euclid Loader when controlled from the Pullcat; Highline Cableway; Loader over 4 cu. yds. up to 12 cu. yds; Multi-Engine Earthmoving Equipment up to 75 cu. yds., Struck; Multi-Engine Scrapers (when used to Push Pull); Power Shovels, Clamshells, Draglines, Backhoes Gradalls over 1 cu. yd. up to 7 cu. yds.; Self-Propelled Boom- Type Lifting Device (center mount) over 25 tons; Self- Propelled Compactor with multiple-propulsion power units; Single-Engine Rubber-Tired Earthmoving Machine with Tandem Scraper; Slip-Form Paver (concrete or asphalt); Tandem Cats and Scraper; Tower Crane Mobile (including Rail Mount); Truck Mounted Hydraulic Crane when remote control equipped over 10 tons up to 25 tons; Universal Liebher and Tower Cranes (and similar types); Wheel Excavator up to 750 cu. yds. per hour; Whirley Cranes over 25 tons Group 11A Band Wagons (in conjunction with Wheel Excavators); Helicopter; Loader over 12 cu. yds.; Multi-Engine Earthmoving Equipment over 75 cu. yds. "struck"; Power Shovels, Clamshells, Draglines, Backhoes, and Gradalls over 7 cu. yds.; Remote-Controlled Earth Moving Equipment; Wheel Excavator over 750 cu. yds. per hour. Group 11B Holland Loader or similar or Loader over 18 cu. yds. Operating Engineer: (PILEDRIVER) Group 1 Oiler...............$ 48.72 Group 1 Truck Crane Oiler...$ 50.64 Group 1.....................$ 56.10 Group 2 Oiler...............$ 48.52 Group 2 Truck Crane Oiler...$ 50.43 Group 2.....................$ 54.56 Group 3 Oiler...............$ 48.29 Group 3 Truck Crane Oiler...$ 50.21 Group 3.....................$ 53.11 Group 4.....................$ 51.60 Group 6.....................$ 49.38 Group 8.....................$ 47.46 OPERATING ENGINEER CLASSIFICATIONS [PILEDRIVER]: Group 1 Derrick Barge Pedestal mounted over 100 tons; Clamshells over 7 cu. yds.; Self Propelled Boom Type Lifting Device, over 100 tons; Truck Crane or Crawler, land or barge mounted over 100 tons Group 2 Derrick Barge Pedestal mounted 45 tons up to 100 tons; Clamshells under 7 cu. yds.; Self Propelled Boom Type Lifting Device over 45 tons; Truck Crane or Crawler, land or barge mounted, 45 tons up to 100 tons Group 3 Derrick Barge Pedestal mounted under 45 tons; Self Propelled Boom Type Lifting Device under 45 tons; Skid/Scow Piledriver, any tonnage; Truck Crane or Crawler, land or barge mounted under 45 tons Group 4 Forklift, over 10 tons Group 6 Deck Engineer Group 8 Deckhand Fireman Operating Engineer: (STEEL ERECTION) Group 1 Oiler...............$ 48.50 Group 1 Truck Crane Oiler...$ 50.46 Group 1.....................$ 56.63 Group 2 Oiler...............$ 48.29 Group 2 Truck Crane Oiler...$ 50.21 Group 2.....................$ 55.12 Group 3 Hydraulic...........$ 49.66 Group 3 Oiler...............$ 48.07 Group 3 Truck Crane Oiler...$ 49.99 Group 3.....................$ 53.88 Group 4.....................$ 52.15 Group 5.....................$ 51.05 OPERATING ENGINEER CLASSIFICATIONS [STEEL ERECTION]: Group 1 Cranes over 100 tons; Derrick over 100 tons; Self-Propelled Boom Type Lifting Devices over 100 tons Group 2 Cranes over 45 tons up to 100 tons; Derrick under 100 tons; Self Propelled Boom Type Lifting Device over 45 tons; Tower Crane Group 3 Cranes, under 45 tons; Self Propelled Boom Type Lifting Device under 45 tons Group 4 Chicago Boom; Forklift over 10 tons Group 5 Boom Cat PAINTER Brush, Roller...............$ 32.74 Sandblast...................$ 33.24 Spray.......................$ 33.59 Structural Steel............$ 33.74 PILEDRIVERMAN....................$ 58.47 PLUMBER/PIPEFITTER...............$ 45.20 TRUCK DRIVER Bus & Manhaul Drivers 0 to 18,000 lbs. (single unit)......................$ 35.07 18,000 lbs. & over (single unit)..............$ 35.18 Helicopter Pilot (transporting men/materials).............$ 49.66 Lift Jitneys...............$ 35.29 Dump Trucks, Dumpcretes, and Bulk Cement Spreader 0 to 004 yds...............$ 35.02 004 yds. to 008 yds........$ 35.24 008 yds. to 018 yds........$ 35.45 018 yds. to 025 yds........$ 35.62 025 yds. to 060 yds........$ 36.04 060 yds. to 075 yds........$ 37.48 075 yds. to 100 yds........$ 38.43 100 yds. to 150 yds........$ 38.90 150 yds. to 250 yds........$ 40.90 250 yds. to 350 yds........$ 43.90 over 350 yds...............$ 45.40 Transit Mix 0 to 8 yds.................$ 35.45 8 yds. to 12 yds...........$ 35.56 over 12 yds................$ 35.78 Using Boom.................$ 0.16 Water & Jetting Trucks 0 to 2,500 gallons.........$ 35.43 2,500 gallons & over.......$ 35.45 Bootman, Comb. Bootman & Road Oiler.................$ 35.51 DW 20's & 21's & other similar Cat type, Terry Cobra LeTourneau pulls, Tournerocker, Euclid, & similar type equipment when pulling Aqua/Pak, Water Tank Trailers, & Fuel, and/or Grease Tank Trailer, or other miscellaneous Trailers, (except as defined under "Dump Trucks").............$ 35.73 Flat Rack (2 or 3 axle unit)......................$ 33.34 Heavy Duty Transport (High Bed); Heavy Duty Transport (Gooseneck Low Bed); Tiltbed or Flatbed Pull Trailers..............$ 35.62 Winch Truck & "A" Frame Drivers 0 to 18,000 lbs............$ 35.18 18,000 lbs. & over.........$ 35.29 Oil Tanker with Pup........$ 36.04 Oil Tanker.................$ 35.62 Pick Up Truck & Pilot Cars (Jobsite).............$ 33.14 Pick Up Truck & Pilot Cars (Over the road).......$ 35.13 Tire Repairmen.............$ 35.45 Truck Oil Greaser; Fuel Truck Driver; Fuel Man & Fuel Island Man............$ 35.18 Truck Repairmen............$ 35.78 RUCK DRIVER ZONE PAY:add the applicable amounts per hour: Zone 1: 0 to 50 miles: $0.00 (from either Carson City Courthouse or Washoe County Courthouse) Zone 2: over 50 to 150 miles: $2.00 [from Washoe County Courthouse] Zone 3: over 150 to 300 miles: $3.00 [from Washoe County Courthouse] Zone 4: over 300 miles: $4.00 [from Washoe County Courthouse] ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION