General Decision Number: NH100006 07/23/2010 NH6 Superseded General Decision Number: NH20080006 State: New Hampshire Construction Type: Building County: Strafford County in New Hampshire. Building construction projects (does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 03/12/2010 1 03/26/2010 2 04/30/2010 3 05/07/2010 4 05/14/2010 5 05/21/2010 6 07/23/2010 BOIL0029-005 10/01/2009 Rates Fringes BOILERMAKER......................$ 32.14 26.6% + 8.96 ---------------------------------------------------------------- CARP0118-002 04/01/2010 Rates Fringes CARPENTER (Including Drywall Hanging, Form Work, Scaffold Building; does not include Drapery Blind Installation and Hard Wood Floor Installation)....................$ 24.72 15.66 Work on all designated hazardous material work sites, where the worker is in direct contact with hazardous material and when protective equipment is required for Levels A, B and C, as defined by the designated health and safety plan: 10% per hour additional. Welding: $1.00 per hour additional. ---------------------------------------------------------------- ELEC0490-001 01/01/2010 Rates Fringes ELECTRICIAN......................$ 26.75 3% + 14.45 Work performed from scaffolding suspended by ropes or cables 30 ft. in the air: 10% per hour additional. Work requiring the wearing of a canister respirator: 10% per hour additional. ---------------------------------------------------------------- ELEC0490-004 09/01/2007 Rates Fringes Teledata System Installer........$ 19.01 3% + 10.80 Work on radio, fiber-optics, holovision, video, recording voice, sound, nurse calls, emergency call, microwave and visual production and reproduction apparatus, telecommunication systems; fire alarm systems; burglar alarm, surveilance systems, CCTV, CATV, card access Systems RS 232 Ethernet; any local area network system associated with computer installation ---------------------------------------------------------------- ENGI0004-020 12/01/2009 Rates Fringes OPERATOR: Power Equipment GROUP 1.....................$ 24.75 21.32 GROUP 1-A...................$ 25.70 21.32 GROUP 1-B...................$ 26.57 21.32 GROUP 1-C...................$ 27.52 21.32 GROUP 1-D...................$ 28.35 21.32 GROUP 1-E...................$ 29.55 21.32 GROUP 2.....................$ 24.57 21.32 GROUP 2-A...................$ 25.53 20.62 GROUP 2-B...................$ 26.38 20.62 GROUP 2-C...................$ 27.31 20.62 GROUP 2-D...................$ 28.13 20.62 GROUP 2-E...................$ 29.31 20.62 GROUP 3.....................$ 25.33 20.62 PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day. GROUP DEFINITIONS: GROUP 1: Backhoe; crane, and truck crane, boom length (jib up to 150 ft.); excavator; forklift; front end loader (except when pushing) GROUP 1-A: Crane, and truck crane, boom length (jib over 150 ft.up to 185 ft.) GROUP 1-B: Crane, and truck crane, boom length (jib over 185 ft. up to 210 ft.) GROUP 1-C: Crane, and truck crane, boom length (jib over 210 ft. up to 250 ft.) GROUP 1-D: Crane, and truck crane, boom length (jib over 250 ft. up to 350 ft.) GROUP 1-E: Crane, and truck crane, boom length (jib over 350 ft.) GROUP 2: Bulldozer, mechanic, roller ---------------------------------------------------------------- IRON0007-009 03/16/2010 Rates Fringes IRONWORKER (Reinforcing & Structural)......................$ 20.15 19.09 ---------------------------------------------------------------- PAIN0035-018 01/01/2010 Rates Fringes DRYWALL FINISHER/TAPER New construction and power plants......................$ 24.47 13.41 Remodel.....................$ 21.79 13.41 PAINTER (BRUSH & ROLLER) New construction and power plants......................$ 24.47 13.41 Repaint work................$ 21.79 13.41 Drywall finisher: Work using power vacuum, drywall sander, bazooka or box and wipers working behind them: $1.40 per hour above the new construction rate. ---------------------------------------------------------------- * PLAS0534-008 07/01/2010 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 30.50 22.59 ---------------------------------------------------------------- SHEE0017-013 01/01/2010 Rates Fringes SHEET METAL WORKER (Including HVAC Duct Work)..................$ 26.62 19.45 ---------------------------------------------------------------- SUNH2005-007 11/01/2005 Rates Fringes Carpenters: _(includes drapery blind installation and hardwood floor installation; does not include drywall hanging, form work and scaffold building)...$ 16.33 1.19 Laborer, general...............$ 11.91 .79 Pipefitter _includes HVAC piping.......$ 19.65 6.39 Plumber........................$ 18.40 4.72 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION