General Decision Number: NH080027 05/30/2008 NH27 Superseded General Decision Number: NH20070029 State: New Hampshire Construction Type: Heavy County: Hillsborough County in New Hampshire. HEAVY CONSTRUCTION PROJECTS Modification Number Publication Date 0 02/08/2008 1 04/25/2008 2 05/30/2008 BOIL0029-013 10/01/2007 Rates Fringes Boilermaker....................$ 28.81 26.6% + 8.96 ---------------------------------------------------------------- * CARP0107-013 03/01/2007 TOWNS OF GREENVILLE AND NEW IPSWICH: Rates Fringes Millwright.....................$ 28.43 20.09 ---------------------------------------------------------------- * CARP0111-008 03/01/2007 TOWN OF PELHAM: Rates Fringes Millwright.....................$ 28.43 20.09 ---------------------------------------------------------------- * CARP0118-004 10/01/2007 DOES NOT INCLUDE THE TOWNS OF GREENVILLE, NEW IPSWICH AND PELHAM: Rates Fringes Millwright.....................$ 22.17 12.76 ---------------------------------------------------------------- ENGI0098-013 04/01/2008 Rates Fringes Power equipment operators: _Backhoe; bulldozer; self-propelled hydraulic crane, up to 10 ton; truck crane; excavator; forklift, 7-ft. lift and over, or 3-ton capacity and over; mechanic...........$ 23.50 7.95 _Forklift, up to 7-ft. lift, and up to 3-ton capacity.................$ 21.50 7.95 Work on hazardous waste: $2.00 per hour additional. Shaft and tunnel work: $.50 per hour additional. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day; plus, for workers who have been employed for six months, a personal day. ---------------------------------------------------------------- SUNH2006-005 03/24/2006 Rates Fringes Carpenter _includes form work.........$ 19.90 3.90 Laborer, general...............$ 14.35 3.88 Power equipment operators: _Front end loader...........$ 21.43 8.55 Truck driver, dump.............$ 14.10 2.21 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION