General Decision Number: ND080018 05/23/2008 ND18 Superseded General Decision Number: ND20070018 State: North Dakota Construction Type: Heavy Counties: Burleigh, Cass, Grand Forks and Morton Counties in North Dakota. BURLRIGH AND MORTON COUNTIES: HEAVY INDUSTRIAL/PROCESSING PLANTS AND REFINERIES Modification Number Publication Date 0 02/08/2008 1 05/02/2008 2 05/16/2008 3 05/23/2008 CARP1091-002 05/01/2006 BURLRIGH AND MORTON COUNTIES: Rates Fringes CARPENTER........................$ 21.60 11.75 ---------------------------------------------------------------- CARP1176-005 05/01/2006 CASS AND GRAND FORKS COUNTIES: Rates Fringes CARPENTER........................$ 18.77 11.48 ---------------------------------------------------------------- ELEC0714-011 07/01/2006 BURLEIGH AND MORTON Rates Fringes Electrician......................$ 23.20 11%+6.92 ---------------------------------------------------------------- ELEC1426-014 06/01/2007 CASS AND GRAND FORKS COUNTIES: Rates Fringes ELECTRICIAN CABLE SPLICER...............$ 23.90 7.46+12% WIREMAN(INCLUDING LOW VOLTAGE)....................$ 22.76 7.46+12% ---------------------------------------------------------------- * ENGI0049-039 04/28/2008 Rates Fringes Power equipment operators: GROUP 1.....................$ 27.60 13.85 GROUP 2.....................$ 24.95 13.85 GROUP 3.....................$ 24.35 13.85 POWER EQUIPMENT OPERATORS DEFINATIONS: GROUP 1: Crane Operator 180' Boom or Jib and over,any combination, all types. GROUP 2: Crane Operator 135' not to exceed 180' of Boom or Jib, any combination, all Types. Gentry Crane Operator GROUP 3: Crane Operator up to and not including 135' of Boom or Jib, any combination, all types. ---------------------------------------------------------------- LABO0580-003 05/01/2000 Rates Fringes Laborers: Common......................$ 14.33 4.81 ---------------------------------------------------------------- PLUM0300-004 05/01/2008 CASS AND GRAND FORKS COUNTIES: Rates Fringes PIPEFITTER.......................$ 32.14 9.70 ---------------------------------------------------------------- PLUM0300-005 05/28/2007 BURLEIGH AND MORTON COUNTIES: Rates Fringes PIPEFITTER.......................$ 31.46 10.25 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION