General Decision Number: MS080011 07/25/2008 MS11 Superseded General Decision Number: MS20070021 State: Mississippi Construction Type: Highway Counties: Alcorn, Benton, Bolivar, Calhoun, Carroll, Chickasaw, Choctaw, Clay, Coahoma, Grenada, Itawamba, Lafayette, Lee, Leflore, Lowndes, Marshall, Monroe, Montgomery, Oktibbeha, Panola, Pontotoc, Prentiss, Quitman, Sunflower, Tallahatchie, Tate, Tippah, Tishomingo, Tunica, Union, Washington, Webster and Yalobusha Counties in Mississippi. AREA 1 - ALCORN, BENTON, CALHOUN, CHICKSAW, CHOCTAW, CLAY, ITAWAMBA, LAFAYETTE, LEE, LOWNDES, MARSHALL, MONROE, OKTIBBEHA, PONTOTOC, PRENTISS, TIPPAH, TISHOMINGO, UNION & WEBSTER AREA 2 - BOLIVAR, CARROLL, COAHOMA, GRENADA, LEFLORE, MONTGOMERY, PANOLA, QUITMAN, SUNFLOWER, TALLAHATCHIE, TATE, TUNICA, WASHINGTON & YALOBUSHA HIGHWAY CONSTRUCTION PROJECTS (does not include Building Structures in Rest Area Projects and Railroad Construction; Bascule; Suspension; and Spandrel Arch Bridges; Bridges designed for Commercial Navigation; Bridges involing Marine Construction and other major Bridges). Modification Number Publication Date 0 02/08/2008 1 07/25/2008 * SUMS1993-001 02/22/1993 AREA 1 - ALCORN, BENTON, CALHOUN, CHICKSAW, CHOCTAW, CLAY, ITAWAMBA, LAFAYETTE, LEE, LOWNDES, MARSHALL, MONROE, OKTIBBEHA, PONTOTOC, PRENTISS, TIPPAH, TISHOMINGO, UNION & WEBSTER AREA 2 - BOLIVAR, CARROLL, COAHOMA, GRENADA, LEFLORE, MONTGOMERY, PANOLA, QUITMAN, SUNFLOWER, TALLAHATCHIE, TATE, TUNICA, WASHINGTON & YALOBUSHA Rates Fringes CARPENTER Area 1......................$ 8.56 Area 2......................$ 8.18 Cement Finisher/Mason Area 1......................$ 8.07 Area 2......................$ 8.02 ELECTRICIAN Area 1......................$ 16.34 Area 2......................$ 16.94 Guard Rail Post Driver Area 1......................$ 6.75 Area 2......................$ 10.00 IRONWORKER, Reinforcing (Steel Tier) Area 1......................$ 8.00 Area 2......................$ 9.14 IRONWORKER, STRUCTURAL Area 1......................$ 7.26 Area 2......................$ 7.25 Joint Filler Area 1......................$ 6.55 Area 2......................$ 6.55 Joint Setter Area 1......................$ 6.55 Area 2......................$ 6.55 LABORER Area 1 Air Tool Operator, Jackhammer.................$ 6.55 Asphalt Raker..............$ 6.55 Formsetter.................$ 7.00 Grade Checker, Asphalt.....$ 7.50 Mason Tender...............$ 6.84 Pipelayer..................$ 7.42 Unskilled..................$ 6.55 Area 2 Air Tool Operator, Jackhammer.................$ 6.55 Asphalt Raker..............$ 6.55 Formsetter.................$ 6.75 Grade Checker, Asphalt.....$ 7.25 Mason Tender...............$ 7.21 Pipelayer..................$ 6.55 Unskilled..................$ 6.55 PAINTER (Structural steel) Area 1......................$ 8.23 Area 2......................$ 8.00 PILEDRIVERMAN Area 1......................$ 7.71 Area 2......................$ 8.14 Power Equipment Operator Area 1 Aggregate Spreader.........$ 6.75 Asphalt broom, sweeper.....$ 6.55 Asphalt distributor........$ 7.30 Asphalt paving machine, spreader...................$ 7.47 Asphalt plant..............$ 6.85 Backhoe, shovel............$ 8.72 Concrete breaker, hydro hammer.....................$ 8.24 Concrete finishing, curing machine.............$ 7.25 Concrete paving machine, dragline...................$ 9.00 Concrete saw...............$ 8.30 Crane, dragline............$ 9.47 Crusher Feeder Machine Operator...................$ 6.55 Earth auger................$ 8.00 Loader, all types..........$ 7.95 Mechanic, heavy equipment..$ 8.83 Milling machine............$ 7.40 Mixer, all types...........$ 6.55 Motor Patrol, grader.......$ 9.22 Mulcher machine............$ 6.55 Oiler, greaser.............$ 7.60 Piledriver machine.........$ 10.50 Roller, self-propelled.....$ 6.57 Scaper, all types..........$ 8.05 Striping machine...........$ 12.50 Tractor, truck type........$ 7.14 Tractor, wheel type........$ 6.55 Trenching machine..........$ 8.01 Welder.....................$ 9.03 Area 2 Aggregate spreader.........$ 6.55 Asphalt broom, sweeper.....$ 6.55 Asphalt distributor........$ 6.95 Asphalt paving machine, spreader...................$ 8.97 Asphalt plant..............$ 6.55 Backhoe, shovel............$ 8.52 Bulldozer..................$ 8.47 Concrete breaker, hydro hammer.....................$ 7.00 Concrete finishing, curing machine.............$ 8.00 Concrete saw...............$ 8.29 Crane, dragline............$ 8.91 Crusher Feeder Machine Operator...................$ 6.55 Loader, all types..........$ 6.85 Mechanic, heavy equipment..$ 8.09 Milling machine............$ 8.06 Mixer, all types...........$ 6.75 Motor patrol, grader.......$ 8.43 Mulcher machine............$ 6.55 Oiler, greaser.............$ 7.32 Piledriver machine.........$ 8.35 Roller, self-propelled.....$ 7.00 Scraper, all types.........$ 7.88 Striping machine...........$ 6.55 Tractor, track type........$ 6.55 Tractor, wheel type........$ 6.55 Trenching machine..........$ 8.01 Welder.....................$ 8.00 TRUCK DRIVER (All types) Area 1......................$ 6.66 Area 2......................$ 6.55 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION