General Decision Number: MO080048 06/06/2008 MO48 Superseded General Decision Number: MO20070048 State: Missouri Construction Type: Building Counties: Barton, Bates and Vernon Counties in Missouri. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 04/04/2008 2 06/06/2008 CARP0007-011 04/01/2008 BATES AND VERNON COUNTIES Rates Fringes Carpenters (Including Drywall Hanging, Acoustical Ceiling and Batt Insulation).............$ 28.65 12.03 ---------------------------------------------------------------- CARP0311-002 04/01/2008 BARTON COUNTY Rates Fringes Carpenters (Including Drywall Hanging, Acoustical Ceiling and Batt Insulation).............$ 21.69 9.88 ---------------------------------------------------------------- ELEC0095-004 06/01/2006 BARTON AND VERNON COUNTIES Rates Fringes Electricians: Cable Splicers..............$ 21.35 9.71+8% Electricians................$ 21.00 9.71+8% ---------------------------------------------------------------- * ELEC0124-012 09/03/2007 BATES COUNTY Rates Fringes Electricians:....................$ 32.18 17.07 ---------------------------------------------------------------- * ELEC0124-015 09/03/2007 BATES COUNTY Rates Fringes Communication Technician.........$ 32.18 17.07 SCOPE OF WORK Includes the installation, operation, inspection, maintenance, repair, and service of radio, television, recording, voice, sound and vision production and reproduction apparatus, equipment and appliances used for domestic, commercial, educational and entertainment purposes. Any electrical work that becomes the structural part of a building that is not removable, such as the running of conduit or raceways and the setting of boxes in plaster or concrete, shall be done by journeyman electricians. ---------------------------------------------------------------- PAIN0003-009 09/30/2007 BARTON COUNTY: Rates Fringes Glaziers.........................$ 20.90 4.35+a a. PAID HOLIDAYS: Labor Day, Christmas Day, Memorial Day and Independence Day. ---------------------------------------------------------------- PAIN0558-006 10/01/2006 BATES AND VERNON COUNTIES Rates Fringes Glaziers.........................$ 25.00 12.67 ---------------------------------------------------------------- PLUM0178-007 11/01/2007 BARTON COUNTY Rates Fringes Pipefitters......................$ 22.62 11.23 ---------------------------------------------------------------- * PLUM0533-005 06/01/2008 BATES AND VERNON COUNTIES Rates Fringes Pipefitters......................$ 36.73 17.04 ---------------------------------------------------------------- SHEE0002-010 07/01/2006 Rates Fringes Sheet Metal Worker...............$ 32.56 13.17 ---------------------------------------------------------------- SUMO1995-001 01/23/1995 Rates Fringes BRICKLAYER.......................$ 16.63 Laborers: Brick Mason Tenders.........$ 13.01 Unskilled...................$ 12.24 Painters, Brush and Roller.......$ 15.60 Plumbers.........................$ 17.21 4.05 Roofers..........................$ 14.96 1.24 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION