General Decision Number: MO080042 07/04/2008 MO42 Superseded General Decision Number: MO20070042 State: Missouri Construction Type: Building County: Atchison County in Missouri. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/14/2008 3 05/02/2008 4 05/09/2008 5 06/20/2008 6 07/04/2008 * ASBE0039-003 06/02/2008 Rates Fringes Asbestos Workers/Insulator Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls...........$ 28.41 11.39 ---------------------------------------------------------------- ASBE0207-018 05/01/2007 Rates Fringes HAZARDOUS MATERIAL HANDLER Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 24.75 8.15 ---------------------------------------------------------------- BOIL0083-005 01/01/2008 Rates Fringes BOILERMAKERS.....................$ 31.00 18.52 ---------------------------------------------------------------- BRMO0005-001 05/01/2008 Rates Fringes BRICKLAYER Bricklayers, Stone Masons, Marble Setters, Caulkers, Cleaners and Terrazzo Workers.....................$ 29.32 11.53 Tile Layer.......................$ 30.49 10.70 ---------------------------------------------------------------- CARP0110-001 05/01/2008 Rates Fringes Carpenters: CARPENTERS, MILLWRIGHTS, LATHERS & PILEDRIVERS.......$ 27.95 11.18 ---------------------------------------------------------------- ELEC0545-001 06/01/2005 Rates Fringes Electricians.....................$ 28.45 11.10 ---------------------------------------------------------------- IRON0010-014 04/01/2008 Rates Fringes Ironworker.......................$ 23.75 20.30 ---------------------------------------------------------------- LABO0579-001 05/01/2008 Rates Fringes Laborers: GROUP 1.....................$ 22.06 9.45 GROUP 2.....................$ 22.26 9.45 GROUP 3.....................$ 22.41 9.45 LABORERS CLASSIFICATIONS GROUP 1: General Laborers; Vibrator man; air tool operator; mechanical tamper; swinging scaffold; cutting torch; drain tile, mastic kettleman; bulk cement handler; chain or concrete saw; jack hammer and chipping hammer; mechanical buggy. GROUP 2: Mason tender; plasterer tender GROUP 3: Asbestos abatement (for non-mechanical systems); batter board man; head pipelayer on sewer work; sandblasting and gunnite trigger man. ---------------------------------------------------------------- PAIN0098-001 05/01/2007 Rates Fringes Painters: Brush & Roller..............$ 23.40 9.20 Sandblaster.................$ 24.40 9.20 Steeplejack.................$ 26.40 9.20 ---------------------------------------------------------------- PAIN0558-007 11/01/2006 Rates Fringes Glaziers.........................$ 24.61 13.02 ---------------------------------------------------------------- PLAS0017-002 04/01/1997 Rates Fringes Plasterer........................$ 19.90 3.20 ---------------------------------------------------------------- PLAS0518-009 05/01/2001 Rates Fringes Cement Mason/Concrete Finisher...$ 23.13 7.15 ---------------------------------------------------------------- PLUM0045-001 09/01/2007 Rates Fringes Plumbers and Pipefitters.........$ 30.75 14.90 ---------------------------------------------------------------- * ROOF0020-004 06/01/2008 Rates Fringes Roofers..........................$ 25.50 10.41 ---------------------------------------------------------------- SHEE0002-009 07/01/2006 Rates Fringes Sheet Metal Worker...............$ 32.56 13.17 ---------------------------------------------------------------- TEAM0541-011 05/01/1997 Rates Fringes Truck drivers: GROUP 1.....................$ 17.54 4.40 GROUP 2.....................$ 17.69 4.40 GROUP 3.....................$ 17.70 4.40 GROUP 4.....................$ 17.81 4.40 TRUCK DRIVER CLASSIFICATIONS GROUP 1: Flat bed trucks single axle; station wagons; pickup trucks; material trucks single axle; tank wagons single axle. GROUP 2: Agitator and transit mix-trucks. GROUP 3: Flat bed trucks tandem axle; articulated dump trucks; material trucks tandem axle; tank wagon tandem axle. GROUP 4: Semi and/or pole trailers; winch, fork & steel trucks; distributor drivers & operators; tank wagon semi-trailer; insley wagons, dumpsters, half-tracks, speedace, euclids & other similar equipment; A-frame and derrick trucks; float or low boy. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION