General Decision Number: MN080007 06/13/2008 MN7 Superseded General Decision Number: MN20070007 State: Minnesota Construction Type: Building Counties: Anoka, Carlton, Carver, Cook, Dakota, Hennepin, Itasca, Koochiching, Lake, Ramsey, Scott, Sherburne, St Louis and Washington Counties in Minnesota. BUILDING CONSTRUCTION PROJECTS (Does not include Residential Construction projects consisting of single family homes and apartments up to and including 4 stories; Does not include Treatment Plants) Modification Number Publication Date 0 02/08/2008 1 04/04/2008 2 05/02/2008 3 05/16/2008 4 05/30/2008 5 06/13/2008 ASBE0034-008 06/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, AND WASHINGTON COUNTIES Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems)..............$ 36.20 16.32 ---------------------------------------------------------------- ASBE0049-002 06/01/2007 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES: Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems).....$ 33.06 12.85 ---------------------------------------------------------------- ASBE0205-002 01/01/2002 ANOKA, BENTON, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, STEARNS AND WASHINGTON COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials from mechanical systems whether they contain asbestos or not)...$ 23.06 5.25 ---------------------------------------------------------------- ASBE0205-016 05/01/1998 CARLTON COOK, ITASCA, KOOCHICHING, LAKE, AND ST. LOUIS COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulating materials from mechanical systems whether they contain asbestos or not)....$ 19.72 3.69 ---------------------------------------------------------------- ASBE0205-018 01/01/2002 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT,SHERBURNE, AND WASHINGTON COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulating materials from mechanical systems whether they contain asbestos or not)....$ 23.06 5.25 ---------------------------------------------------------------- BOIL0647-002 07/01/2007 Rates Fringes BOILERMAKER......................$ 31.59 16.73 ---------------------------------------------------------------- BRMN0001-001 05/01/2008 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE (City of Elk River) & WASHINGTON COUNTIES Rates Fringes Bricklayer, Stonemason...........$ 34.14 13.30 ---------------------------------------------------------------- BRMN0001-004 05/01/2008 Rates Fringes MARBLE SETTER....................$ 34.14 13.30 ---------------------------------------------------------------- BRMN0001-017 05/01/2007 ALL COUNTIES EXCEPT: CARLTON, COOK, LAKE & ST LOUIS (City of Duluth and South of Township Line 55) Rates Fringes Tile Layer.......................$ 30.54 16.39 ---------------------------------------------------------------- BRMN0001-021 05/01/2008 Rates Fringes TILE FINISHER....................$ 26.78 13.15 ---------------------------------------------------------------- BRMN0001-033 05/01/2008 Rates Fringes TERRAZZO WORKER/SETTER Base Machine................$ 32.79 13.20 Finisher....................$ 32.46 13.20 Mechanic....................$ 34.31 13.20 ---------------------------------------------------------------- BRMN0003-002 05/01/2008 CARLTON, COOK, LAKE & ST. LOUIS (South of a line between Townships #54 & #55, 2 miles north of Cotton) COUNTIES: Rates Fringes BRICKLAYER.......................$ 29.79 16.85 ---------------------------------------------------------------- BRMN0003-003 05/01/2008 CARLTON, COOK, LAKE & ST. LOUIS (City of Duluth and south of Township Line 55) Rates Fringes Tile Layer.......................$ 24.13 17.38 ---------------------------------------------------------------- BRMN0015-002 05/01/2007 KOOCHICHING COUNTY Rates Fringes BRICKLAYER.......................$ 29.50 12.55 ---------------------------------------------------------------- BRMN0015-004 05/01/2007 KOOCHICHING COUNTY Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 28.05 12.55 ---------------------------------------------------------------- BRMN0016-001 05/01/2007 ITASCA COUNTY Rates Fringes BRICKLAYER.......................$ 29.79 16.85 ---------------------------------------------------------------- CARP0087-004 05/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE (Excluding St. Cloud & extending 5 miles beyond the city limits of St. Cloud) & WASHINGTON COUNTIES Rates Fringes Carpenters: Carpenter, Insulator, Piledriverman...............$ 32.84 11.85 ---------------------------------------------------------------- CARP0087-010 05/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE AND WASHINGTON COUNTIES Rates Fringes Carpenter & Piledrivermen (Site Preparation, Excavation and Incidental Paving)..........$ 32.44 11.78 ---------------------------------------------------------------- CARP0190-010 05/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, AND WASHINGTON COUNTIES Rates Fringes LATHER...........................$ 31.89 12.82 ---------------------------------------------------------------- CARP0361-008 05/01/2007 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE, ST LOUIS COUNTIES Rates Fringes LATHER...........................$ 25.93 12.90 ---------------------------------------------------------------- CARP0361-016 05/01/2007 ST LOUIS COUNTY (DULUTH) Rates Fringes Carpenter & Piledrivermen (Site Preparation, Excavation, and Incidental Paving)..........................$ 29.02 12.90 ---------------------------------------------------------------- CARP0361-017 05/01/2007 ST LOUIS COUNTY (Except Duluth) Rates Fringes Carpenter & Piledrivermen (Site Preparation, Excavation, and Incidental Paving)..........................$ 28.62 12.90 ---------------------------------------------------------------- CARP0361-018 05/01/2007 CARLTON, COOK, LAKE (South part, excluding Sawbill Landing) AND ST. LOUIS (Duluth Area including Alborn, Arnold, Bartlett, Birch, Brookstone, Canyon, Clinton, Culver, Floodwood, Gowan, Island, Kelsey, Lakewood, Meadowlands, Munger, Palmers, Payne, Prasit, Shaw, Taft) COUNTIES Rates Fringes CARPENTER........................$ 25.65 12.90 ---------------------------------------------------------------- CARP0548-007 05/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, AND WASHINGTON COUNTIES Rates Fringes MILLWRIGHT.......................$ 32.51 13.51 ---------------------------------------------------------------- CARP0596-001 06/01/2007 AREA 1: CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST LOUIS COUNTIES AREA 2: REMAINING AREA Rates Fringes SOFT FLOOR LAYER Area 1......................$ 24.99 14.20 Area 2......................$ 29.55 13.82 ---------------------------------------------------------------- CARP0606-001 05/01/2007 ITASCA, KOOCHICHING, LAKE (Northern part, including Sawbill Landing) & ST. LOUIS (Excluding Duluth Area) COUNTIES Rates Fringes Carpenters: Carpenter, Piledriverman....$ 25.00 11.79 ---------------------------------------------------------------- CARP0606-007 05/01/2007 ITASCA, KOOCHICHING, LAKE (Northern half, excluding Two Harbors, Isabella & Finland), AND ST LOUIS (N.E. 2/3 including Cook, Cusson, Ely; and western strip including Chisholm, Orr and Greaney) COUNTIES Rates Fringes CARPENTER (Site Preparation, Excavation, and Incidental Paving) Carpenter & Piledriverman...$ 29.73 11.79 ---------------------------------------------------------------- CARP1348-001 05/01/2007 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES: Rates Fringes MILLWRIGHT.......................$ 27.60 12.10 ---------------------------------------------------------------- ELEC0110-006 03/01/2004 Rates Fringes Communications System (SOUND, SIGNAL & COMMUNICATIONS WORK) Installer...................$ 19.53 8.45+a,b Technician (Installation of Controller)..............$ 27.93 10.46+a,b FOOTNOTES: a. 1 year service - 5 days paid vacation; 2 years service - 10 days paid vacation; 5 years service - 12 days paid vacation; 7 years service - 14 days paid vacation; 9 years service - 16 days paid vacation; 11 years service - 18 days paid vacation; 12 years service - 20 days paid vacation b. 8 Paid Holidays: New Year's Day; Memorial Day; 4th of July; Labor Day; Thanksgiving Day; Day after Thanksgiving; the normal work day preceding Christmas Day; & Christmas Day ---------------------------------------------------------------- ELEC0110-012 05/01/2007 ANOKA (Except Anoka & Fridley Townships & the cities of Andover, Anoka, Columbia Heights, Coon Rapids, Fridley, Hilltop, Ramsey & Spring Lake Park), DAKOTA, RAMSEY, SHERBURNE (East of Becker and Santiago Twps), AND WASHINGTON COUNTIES Rates Fringes ELECTRICIAN......................$ 33.60 3%+17.01 ---------------------------------------------------------------- ELEC0242-002 06/03/2007 CARLTON, COOK, ITASCA (Southerly 12 Twps. including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), LAKE & ST. LOUIS (South part bounded on the north by the north line of Kelsey Township extended east & west) COUNTIES Rates Fringes ELECTRICIAN......................$ 29.91 59.25% ---------------------------------------------------------------- ELEC0292-011 05/01/2007 ANOKA (Anoka & Fridley Townships & the cities of Andover, Anoka, Columbia Heights, Coon Rapids, Fridley, Hilltop, Ramsey & Spring Lake Park), CARVER, HENNEPIN, AND SCOTT COUNTIES; AND SHERBURNE COUNTIES (East of Hwy 25 to Hwy 10 and an imaginary line straight West to the Mississiippi River) Rates Fringes Cable splicer....................$ 34.00 64.05% ELECTRICIAN......................$ 33.00 64.05% ---------------------------------------------------------------- ELEC0294-002 06/01/2007 ITASCA (Excluding section South of a line extending East & West of the South line of Grand Rapids & Trout Lake Twps), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) Rates Fringes Cable splicer....................$ 30.71 57.85% Electricians: Jobs over $3,244,800........$ 30.16 57.85% Jobs under $3,244,800.......$ 22.66 35.5%+5.50 ---------------------------------------------------------------- ELEC0294-006 06/01/2007 KOOCHICHING (East of a line extending North and South from the easternmost point of City limits of Grand Rapids), & ST. LOUIS (North part bounded on the south by the south line of Ellsburg Township, extended east & west) COUNTIES Rates Fringes ELECTRICIAN......................$ 30.16 57.85% CABLE SPLICER: $0.55 additional per hour ---------------------------------------------------------------- ELEV0009-001 01/01/2008 Rates Fringes ELEVATOR MECHANIC................$ 38.58 16.285 FOOTNOTE: PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- * ENGI0049-040 05/01/2008 Site Preparation, Excavation, and Incidental Paving Rates Fringes Power Equipment Operator AREA 1: GROUP 1....................$ 31.07 14.15 GROUP 2....................$ 30.07 14.15 GROUP 3....................$ 29.52 14.15 GROUP 4....................$ 29.22 14.15 GROUP 5....................$ 26.18 14.15 GROUP 6....................$ 24.97 14.15 AREA 2: GROUP 1....................$ 28.61 14.15 GROUP 2....................$ 27.61 14.15 GROUP 3....................$ 27.16 14.15 GROUP 4....................$ 26.86 14.15 GROUP 5....................$ 24.29 14.15 GROUP 6....................$ 23.42 14.15 AREA 3: GROUP 1....................$ 24.20 14.15 GROUP 2....................$ 23.20 14.15 GROUP 3....................$ 22.27 14.15 GROUP 4....................$ 21.96 14.15 GROUP 5....................$ 20.25 14.15 GROUP 6....................$ 19.65 14.15 AREA DESCRIPTIONS AREA 1 (METRO): ANOKA, CARVER, COOK, DAKOTA, HENNEPIN, LAKE, RAMSEY, SCOTT, SHERBURNE (South of the Northern boundary of T. 33-N, and East of the western boundary of R. 27-W), ST. LOUIS, and WASHINGTON COUNTIES AREA 2 (EASTERN): CARLTON, ITASCA (East of the Western right of way of Hwy #6), KOOCHICHING (East of a North-South line from the Canadian border to Pelland, the Western right of way of Hwy #71 from Pelland to Big Falls and Hwy #6), and SHERBURNE (Remainder) COUNTIES AREA 3 (WESTERN): ITASCA (Remainder) and KOOCHICHING (Remainder) COUNTIES POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1 - Helicopter Pilot; *Crane with over 135' Boom, excluding Jib; Dragline, Crawler, Hydraulic Backhoe and/or other similar equipment with Shovel-type Controls 3 cu. yds. & over Mfg. rated Cap.; & Pile Driving when 3 Drums are in use GROUP 2 - Cableway; Concrete Mixer, Stationary Plant over 34E; Derrick (Guy or Stiffleg) (Power) (Skids or Stationary); Diver; Dragline, Crawler, Hydraulic Backhoe and/or similar equipment with Shovel-type Controls, up to 3 cu. yds; Dredge or Engineers, Dredge (Power) & Engineer; Front End Loader, 5 cu. yds. & over; Grader or Motor Patrol, Finishing Earthwork & Bituminous; Locomotive Crane; Master Mechanic; Mixer (Paving) Concrete Paving, Road; Mole, including Power Supply; Mucking Machine, including Mucking Operations, Conway or similar type; Piledriving; Refrigeration Plant Engineer; Tandem Scraper; Tractor - Boom type; Truck Crane - Crawler Crane; & Tugboat 100 HP & over GROUP 3 - Dual Tractor; Elevating Grader; Pumpcrete; Scraper- Struck Cap. 32 cu. yds & over; & Self-propelled Traveling Soil Stabilizer GROUP 4 - Air Track Rock Drill; Articulated Hauler Terex, Caterpillar or similar type; Asphalt Bituminous Stabilizer Plant; Automatic Road Machine (CMI or similar); Backfiller; Bituminous Roller (8 Tons & over); Bituminous Spreader & Finishing (Power); Boom Truck (Power operated Boom); Brokk or R.T.C. 750 Remote Control or Similar types with all attachments; Cat & Scraper; Cat Tractor with Rock Wagons or similar types; Challenger 75-D or 85-D when pulling Scraper or Bulldozer; Chip Harvester & Tree Cutter over 150 HP; Concrete Batch Plant; Concrete Mixer on jobsite over 14S; Concrete Mobile; Crushing Plant (Gravel & Stone) or Gravel Washing, Crushing & Screening Plant; Curb Machine; Directional Boring Machine; Dope Machine (Pipeline); Drill Rigs, Heavy Rotary or Churn or Cable Drill; Fork Lift or Straddle Carrier; Fork Lift or Lumber Stacker; Front End Loader, over 1 cu. yd.; Hoist Engineer (Power); Hydraulic Tree Planter; Launcherman (Tankerman or Pilot License); Lead Greaser; Locomotive; Mechanic; Milling, Grinding & Planing Machine; Morbark Tub Grinder or Similar Type; Multiple Machines, such as Air Compressors, Welding Machines, Generators, Pumps; Pavement Breaker or Tamping Machine (Power Driven) Mighty Mite or similar type; Pickup Sweeper, 1 cu. yd. & over Hopper Cap.; Pipeline Wrapping, Cleaning or Bending Machine; Power Plant Engineer, 100 K.W.H. & over; Power Actuated Horizontal Boring Machine, over 6"; Pugmill; Rubber- tired Farm Tractor, Backhoe Attach.; Scraper, up to 32 cu. yds.; Skid Steer Loader, over 1 cu. yd. with Backhoe Attachment; Slip Form (Power Driven) (Paving); Tie Tamper & Ballast Machine; Tractor, Bulldozer; Tractor Operator, over 50 HP with Power Take-off; Trenching Machine (Sewer, Water, Gas); Well Point Installation; & Dismantling or Repair Mechanic GROUP 5 - Air Compressor, 600 CFM or over; Bituminous Roller (Under 8 tons); Bituminous Rubber-tired Roller; Bituminous Spreader & Bituminous Finishing Machine Tender (Power); Concrete Distributor & Spreader Finishing Machine, Longitudinal Float, Joint Machine, & Spray; Concrete Saw (Multiple Blade) (Power Operated); Form Trench Digger (Power); Front End Loader, up to & incl. 1 cu. yd.; Grader (Motor Patrol); Gunite Gunall; Hydraulic Log Splitter; Loader (Barber Greene or similar type); Payhauler or similar type; Post Hole Driving Machine/Post Hole Augar; Power Actuated Auger & Boring Machine; Power Actuated Jack; Pump; Self-propelled Chip Spreader (Flaherty or similar); Sheep Foot Compactor with Blade - 200 HP & over; Shouldering Machine (Power) Apsco or similar type incl. self-propelled Sand & Chip Spreader; Stump Chipper & Tree Chipper; Tractor Operator, Bulldozer, 50 HP or less; & Tree Farmer (Machine) GROUP 6 - Challenger 75-D or 85-D when pulling Disk or Roller; Conveyor; Dredge Deck Hand; Fireman or Tank Car Heater; Gravel Screening Plant (Portable not Crushing or Washing); Greaser (Truck or Tractor); Leverman; Mechanic Tender; Mechanic, Space Heater (Temporary Heat); Oiler (Power Shovel, Crane, Dragline); Power Sweeper; Roller on Gravel Compaction; Self-propelled Vibrating Packer (35 HP & over); Sheep Foot Roller; Tractor, Wheel Type (over 50 HP); & Truck Crane Oiler *CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM; CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM UNDERGROUND WORK: TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE - $ .50 PREMIUM HAZARDOUS WASTE PROJECTS (PPE Required): LEVEL A - $1.25 PREMIUM LEVEL B - $ .90 PREMIUM LEVEL C - $ .60 PREMIUM ---------------------------------------------------------------- ENGI0049-041 05/01/2008 Rates Fringes Power Equipment Operator (BUILDING CONSTRUCTION) GROUP 1.....................$ 34.14 14.15 GROUP 2.....................$ 33.80 14.15 GROUP 3.....................$ 32.39 14.15 GROUP 4.....................$ 32.05 14.15 GROUP 5.....................$ 31.88 14.15 GROUP 6.....................$ 30.37 14.15 GROUP 7.....................$ 29.25 14.15 GROUP 8.....................$ 27.24 14.15 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1 - Helicopter Operator; Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over GROUP 2 - Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over, Concrete Pump 164 ft Boom GROUP 3 - Traveling Tower Crane; Master Mechanic; Pile Driving Operator (when 3 drums are used); Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Derrick (Guy & Stiffleg); Tower Crane (Stationary) up to 200'; & AllTerrain Vehicle Crane, Boom Truck over 100 ft. GROUP 4 - Crawler Backhoe; Hoist Engineer (3 drums or more); Locomotive Operator; Overhead Crane Operator (inside building perimeter); & Tractor Operator with Boom GROUP 5 - Air Compressor Operator 450 CFM or over (2 or more machines); Pump Operator and/or Conveyor Operator (2 or more machines); Mechanic; Pumpcrete or Complaco type Machine Operator; Forklift; Boom Truck up to 100 ft.; Concrete Mixer Operator; Drill Rig - Heavy Rotary or Churn when used for Caisson Drilling for Elevator Cylinder or Building Construction; Front End Loader (Over 1 cu. yd.); Hoist Engineer (1 or 2 drums); Straddle Carrier Operator; Power Plant Engineer (100 KW & over on multiples equal to 100KW & over); Tractor Operator over D2; & Well Point Pump Op. GROUP 6 - Concrete Batch Plant Operator; Gunite Operator; Tractor Operator D2 or similar size; & Front End Loader Operator, up to 1 cu. yd. GROUP 7 - Air Compressor Operator 600 CFM or over; Pump and/or Conveyor Operator; Brakeman; Pick-up Sweeper (1 cu. yd. & over Hopper capacity); Truck Crane Oiler; & Welding Machine Operator, Fireman temporary heat. GROUP 8 - Mechanical Space Heater (Temporary Heat); Oiler or Greaser; & Elevator Operator ---------------------------------------------------------------- IRON0512-001 05/01/2008 ANOKA, BENTON, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, STEARNS, & WASHINGTON COUNTIES Rates Fringes IRONWORKER.......................$ 32.80 19.42 ---------------------------------------------------------------- IRON0563-002 05/01/2008 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES Rates Fringes IRONWORKER.......................$ 28.66 18.50 ---------------------------------------------------------------- LABO0010-001 05/01/2007 Rates Fringes Landscape Laborer................$ 15.66 9.13 ---------------------------------------------------------------- LABO0132-002 05/01/2007 ANOKA, BENTON, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, STEARNS AND WASHINGTON COUNTIES Rates Fringes LABORER (Asbestos abatement).....$ 27.11 9.97 ---------------------------------------------------------------- LABO0132-010 05/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE & WASHINGTON COUNTIES Rates Fringes Laborers: Group 1.....................$ 29.51 10.38 Group 2.....................$ 30.01 10.38 Group 3.....................$ 30.51 10.38 LABORERS CLASSIFICATIONS GROUP 1 - Construction Craft Laborer; Asbestos & Hazardous Waste Tech; Flagperson/Traffic Control; Carpenter Tender; Concrete; Damp Proofer Below Grade; Drill Runner Tender; Dumpman - Dirt, Asphalt, Concrete, Cement; Heater Tender; Hot Tar Caulker - Corker; Joist Handler; Material Handler - Power Buggy; Rebar; Snow Blower Operator; Signal Person; Hydro Blast or Waterblast; Chain Saw Operator; Concrete Saw, Drill Operator; Concrete Vibrator; Demolition & Remodeling, Excluding Demolition of an entire Structural System; Mason Tender; Mortar Mixer - Cement or any other substitute Material or Composition; Pipe Handler; Pneumatic & Electric Tool, Jackhammer, Paving Buster, Chipping Hammer, Tamper Operator, etc.; Swing Stage Line Scaffold (Not including "Patent" Scaffolding); Torchman - Gas, Electric, Thermal or similar device; & Remote Control Tamper GROUP 2 - Caisson Work; Mounted Wall Saw Operator; Nozzle Operator-Gunite, Cement, Sandblasting; Pipelayer; Pipe Rehab Technical, including Cleaning, Cutting, Cameraing, etc; Refractory Worker; Sheeting Setter & Driver, Heavy Building Excavation; Underground Work-Open Ditch or Excavation 8' Below Grade; & Underpinning GROUP 3 - Driller for Blasting purposes; Dynamite Blaster or substitute products Tovex TR, Water, Gas, Gel, Bristar, Silent Dynamite, etc. ---------------------------------------------------------------- LABO0132-014 06/01/2007 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE & WASHINGTON COUNTIES: Rates Fringes PLASTER TENDER...................$ 30.73 11.21 ---------------------------------------------------------------- LABO0563-006 05/01/2007 Site Preparation, Excavation, and Incidental Paving Rates Fringes Laborers: AREA 1: GROUP 1....................$ 26.27 10.28 GROUP 2....................$ 26.47 10.28 GROUP 3....................$ 26.62 10.28 GROUP 4....................$ 26.72 10.28 GROUP 5....................$ 26.97 10.28 GROUP 6....................$ 28.27 10.28 AREA 2: GROUP 1....................$ 25.82 9.66 GROUP 2....................$ 26.02 9.66 GROUP 3....................$ 26.17 9.66 GROUP 4....................$ 26.27 9.66 GROUP 5....................$ 26.52 9.66 GROUP 6....................$ 27.82 9.66 AREA 3: GROUP 1....................$ 24.88 10.60 GROUP 2....................$ 25.08 10.60 GROUP 3....................$ 25.23 10.60 GROUP 4....................$ 25.33 10.60 GROUP 5....................$ 25.58 10.60 GROUP 6....................$ 26.88 10.60 AREA 4: GROUP 1....................$ 17.99 8.51 GROUP 2....................$ 18.19 8.51 GROUP 3....................$ 18.34 8.51 GROUP 4....................$ 18.44 8.51 GROUP 5....................$ 18.69 8.51 GROUP 6....................$ 19.99 8.51 AREA DESCRIPTIONS AREA 1 (District 1): ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE, and WASHINGTON COUNTIES AREA 2 (District 2A): CARLTON, COOK, LAKE and ST. LOUIS (South of T. 55 N) COUNTIES AREA 3 (District 2B): ITASCA and ST. LOUIS (North of T. 55 N) AREA 4 (District 4): KOOCHICHING COUNTY LABORERS CLASSIFICATIONS GROUP 1: Construction; Bituminous Batcherperson (Stationary Plant); Bituminous Worker - Shoveler, Raker, Floater, Squeegee, Utility; Blaster Tender; Brick Tender; Carpenter Tender; Cement Coverperson Batch Truck; Cement Handler - Bulk, Bag; Concrete Batcherperson; Concrete Handler, Caisson, Footings, Columns, Piling, Slabs, etc.; Concrete Longitudinal Float Operator (Manual Bullfloat on Paving); Concrete Shoveler, Tamper & Puddler (Paving); Conduit Layer; Curb Setter; Damp Proofer Below Grade; Demolition of an entire Structural System, Excluding Remodeling; Drill Runner Tender; Dump Operator (Dirt, Paver, Dumping Batch Truck, etc.); Fabric Installer; Grade Checker; Hydrant & Valve Setter; Hydro Blast or Waterblaster; Joint Filler (Concrete Pavement); Kettleperson (Bituminous or Lead); Labor Wrecking Demolition; Mortar Mixer; Pipe Handler; Power Buggy Operator; Pump Operator(Less than 6"); Retaining Wall Installation; Sand Cushion Bedmaker; Slip Lining of Utility Lines; Soil Stabilizer; Sound Barrier & Guard Rail Installation; Squeegeeperson; Stabilizing Batcherperson (Stationary Plant); Temporary Heaters & Blower Tender; Top Person (Sewer, Water or Gas Trench); Flagperson;Traffic Controller (Traffic Barriers) & Transit/Level. Pipelayer, Laser Beam (sewer, water, gas) $1.50 above Group 1 rate. Blasting Person (Dynamite or substitute product) $3.00 above Group 1 rate. GROUP 2: Chain Saw; Compaction Equipment (Hand Operated or Remote Control); Concrete Drilling; Concrete Mixer Operator; Concrete Sawer; Concrete Vibrator; Ditch & Other Work more than 8' Below starting level of manual work; Formsetter; Joint Sawer, Mortar; Pipe Fuser/Technician; Pneumatic Tools, Jackhammer, Paving Buster, Chipping Hammer, etc.; Remote Control Demo Machine & Related Accessories (Electric/Hydraulic); Stone Tender/Mason Tender; & Torchperson - Gas, Electric, Thermal or Similar Device GROUP 3: Brick or Block Paving Setter; Caisson Work; Cofferdam Work GROUP 4: Cement Gun Operator (1 1/2" or Over); Driller - Air Track or Similar; & Nozzle Operator (Gunite, Sandblasting, Cement); Pipe Rehab (Including Cleaning, Relining, Camera). GROUP 5: Asbestos & Hazardous Waste Technician;Bottom person (Sewer, Water, or Gas Trench more than 8 ft below starting level of manual work); Tunnel Laborer; Tunnel Miner; Tunnel Miner Tender; Underground Laborer; & Underpinning GROUP 6: Tunnel Miner Under Pressure ---------------------------------------------------------------- LABO1091-001 05/01/2007 CARLTON, COOK, LAKE & ST. LOUIS (South of T 55 N) COUNTIES: Rates Fringes Laborers: GROUP 1.....................$ 23.63 9.66 GROUP 2.....................$ 23.78 9.66 GROUP 3.....................$ 24.03 9.66 GROUP 4.....................$ 24.33 9.66 GROUP 5.....................$ 21.73 9.66 LABORER CLASSIFICATIONS GROUP 1: General; Carpenter Tender; Concrete Laborer; Damp Proofer Below Grade; Drill Runner Tender; Dumpman - Dirt, Asphalt, Concrete, Cement; Heater Tender; Hot Tar Caulker - Corker; Joist Handler; Rebar; Snow Blower Operator; Signalperson; Material Handler (All types Power Buggy); Fire Control; Asbestos Removal; & Hazardous Waste GROUP 2: Chain Saw Operator; Concrete Saw, Drill Operator; Concrete Vibrator; Demolition & Wrecking, Excluding Remodeling; Gunite, Sandblasting Machine Operator; Mason Tender; Mortar Mixer - Cement or any other substitute material or composition; Pipe Handler; Pneumatic & Electric Tools,Jackhammer, Paving Buster, Chipping Hammer, Tamper Operator, etc.; Swing Stage Line Scaffold (not including "patent" scaffolding); Torchman - Gas, Electric, Thermal or similar device; & Hydroblast GROUP 3: Caisson Work; Nozzle Operator - Gunite, Cement, Sandblasting; Pipelayer; Refractory Worker; Sheeting Setter & Driver, Heavy Building Excavation; Underground Work - Open Ditch or Excavation 8' Below Grade; Underpinning; & Hod Carrier GROUP 4: Driller for Blasting Purposes; Dynamite Blasters or substitute products Tovex TR, Water, Gas, Gel, Bristar, Silent Dynamite, etc.; Asbestos Abatement Worker; & Hazardous Waste Worker GROUP 5: FLAGPERSON ---------------------------------------------------------------- LABO1091-003 05/01/2007 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES Rates Fringes LABORER (Asbestos Abatement).....$ 25.65 9.51 ---------------------------------------------------------------- LABO1097-001 05/01/2007 ITASCA, KOOCHICHING & ST. LOUIS (North of T 55N) COUNTIES: Rates Fringes Laborers: GROUP 1.....................$ 22.97 10.16 GROUP 2.....................$ 23.37 10.16 GROUP 3.....................$ 23.67 10.16 GROUP 4.....................$ 24.97 10.16 LABORERS CLASSIFICATIONS GROUP 1: Construction; Carpenter Tender; Concrete; Damp Proofer Below Grade; Dump Person - Dirt, Asphalt, Concrete & Cement; Heater Tender; Hot Tar Caulker - Corker; Joist Handler; Material Handler - Power Buggy; Rebar; Signal Person; & Snow Blower Operator; Chain Saw Operator; Concrete Vibrator; Demolition & Wrecking, Excluding Remodeling; Mason Tender; Mortar Mixer - Cement or Any Other Substitute Material or Composition; Pipe Handler; Pneumatic & Electric Tool, Jackhammer, Paving Buster, Chipping Hammer, Tamper Operator, Etc.; Swing Stage Line Scaffold (Not including "Patent" Scaffolding); & Torch Person - Gas, Electric, Thermal or similar device; Scrapping, Sweeping & Clean- up; Skid Steer, Forklift (Incidental Use); Flagperson. GROUP 2: Creosote Handler; Caisson Work; Concrete Saw Drill Operator; Nozzle Operator - Gunite, Cement, Sandblasting; Pipelayer; Sheeting Setter & Driver, Heavy Building Excavation; Underground Work - Open Ditch or Excavation 8' Below Grade; Underpinning; & High Pay/Low Pay - 40 ft. Over or Under Ground Floor without Conventional Floor Areas; Pipe- Rehab Technician, including Cleaning, Cutting, Camering, etc.; and Wall Mounted Saw Operator GROUP 3: Driller for Blasting Purposes; Dynamite Blaster or substitute products; & Tovex TR, Water, Gas, Gel, Bristar, Silent Dynamite, etc. GROUP 4: Refractory work ---------------------------------------------------------------- PAIN0061-001 05/01/2007 DAKOTA, RAMSEY AND WASHINGTON COUNTIES Rates Fringes Drywall Finisher/Taper..............$ 30.19 13.30 Sander......................$ 22.64 13.30 Painters: Brush; Paperhanger..........$ 30.19 13.35 Sandblaster; Spray; Swing Stage; Boatswain Chair; Window Jack; Safety Belt; Erected Structural Steel; Application of Epoxy Materials & Materials containing over 50% Creosote....................$ 30.94 13.35 ---------------------------------------------------------------- PAIN0106-001 05/01/2007 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES: Rates Fringes GLAZIER..........................$ 23.00 11.75+a FOOTNOTE: a. 1 to 4 years service - 1 week paid vacation; 5 to 11 years - 2 weeks paid vacation; 11 years or more - 3 weeks paid vacation ---------------------------------------------------------------- PAIN0106-011 05/01/2007 CARLTON, COOK, ITASCA, KOOCHICHING, LAKE & ST. LOUIS COUNTIES: Rates Fringes Painters: New: Brush; Roller..............$ 26.66 11.82 Paperhanging; Spray; Steel and Taping...........$ 27.26 11.82 Repaint: Brush; Roller; & Lead Base Paint Removal & Abatement with Basic Hand Tools such as Scrapers.....$ 25.16 11.82 Paperhanging; Spray; Steel; Taping; Lead Base Paint Removal/Abatement with Other Than Basic Hand Tools.................$ 25.76 11.82 ---------------------------------------------------------------- PAIN0386-001 05/01/2007 ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (South and East of a line drawn between the town of Santiago in Sherburne County and the town of Clearwater in Wright County) COUNTIES Rates Fringes Painters: Brush; Roller & Paperhanger.$ 29.70 13.84 Spray; Steel; Sandblaster; Swing Stage & Epoxy.........$ 30.45 13.84 ---------------------------------------------------------------- PAIN0386-011 05/01/2007 ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (South & east of a line drawn between the town of Santiago, Sherburne County and the town of Clearwater, Wright County) COUNTIES Rates Fringes Drywall Finisher....................$ 28.67 14.82 Sander......................$ 21.50 14.71 ---------------------------------------------------------------- PAIN0880-001 05/01/2002 Rates Fringes Sign Painter.....................$ 21.12 2.07+a+b FOOTNOTES: a. 8 Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; the Day After Thanksgiving; the last working Day Before Christmas; & Christmas Day b. Vacation Pay: 3 years service - 2 weeks paid vacation; 6 years service - 3 weeks paid vacation; 15 years service - 4 weeks paid vacation ---------------------------------------------------------------- PAIN0884-010 06/01/2007 BENTON, SHERBURNE (Western one-half, North & West of a line drawn between the city of Santiago in Sherburne County & the city of Clearwater in Wright County) & STEARNS COUNTIES: Rates Fringes Drywall Finisher/Taper...........$ 23.26 11.41 Painters: Brush & Roller..............$ 23.26 11.41 PROJECTS UNDER $8,000: Receive 80% of basic hourly rate. PAINTER'S PREMIUM: $0.75 per hour additional for the following work: Spray, Two Component Paints, Epoxies, Sandblasting & Rigging, Work done on Swing Scaffolding, Safety harness, Window Jacks, Boatswain's Chair, Coverings & erection of scaffolding for same, Work on erected Structural Steel, Abrasive Blasting. ---------------------------------------------------------------- PAIN1324-006 06/01/2005 ANOKA, CARVER, DAKOTA, HENNEPIN, ITASCA, KOOCHICHING, RAMSEY, SCOTT, SHERBURNE, & WASHINGTON COUNTIES Rates Fringes GLAZIER..........................$ 30.86 11.40 ---------------------------------------------------------------- PLAS0265-001 06/01/2006 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE & WASHINGTON COUNTIES: Rates Fringes PLASTERER........................$ 30.93 12.85 ---------------------------------------------------------------- * PLAS0633-001 05/01/2008 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE & WASHINGTON COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 31.74 14.30 ---------------------------------------------------------------- * PLAS0633-004 05/01/2008 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE & WASHINGTON COUNTIES: Rates Fringes CEMENT MASON/CONCRETE FINISHER (Site Preparation, Excavation, & Incidental Paving)..........................$ 31.05 14.30 ---------------------------------------------------------------- * PLAS0633-011 05/01/2008 CARLTON, COOK, LAKE & ST. LOUIS (South of T 55N) COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 27.61 13.38 ---------------------------------------------------------------- * PLAS0633-020 05/01/2008 CARLTON, COOK, LAKE & ST. LOUIS (South of T. #55 north) COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER (Site Preparation, Excavation & Incidental Paving)..........................$ 30.20 13.38 ---------------------------------------------------------------- * PLAS0633-024 05/01/2008 ITASCA & ST. LOUIS (North of White Face River) COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 25.40 12.45 ---------------------------------------------------------------- * PLAS0633-041 05/01/2008 KOOCHICHING COUNTY Rates Fringes CEMENT MASON/CONCRETE FINISHER (Heavy, Sewer & Water Lines).....................$ 25.40 12.45 PLASTERER........................$ 21.25 10.25 ---------------------------------------------------------------- * PLAS0663-003 05/01/2008 CARLTON, COOK, ITASCA, LAKE AND ST. LOUIS COUNTIES Rates Fringes PLASTERER........................$ 28.74 13.63 ---------------------------------------------------------------- PLUM0011-001 05/01/2007 CARLTON, COOK (A strip 20 miles inland along the shores of Lake Superior), LAKE (A strip 20 miles inland along the shores of Lake Superior) & ST. LOUIS (South of an east-west line drawn through Cotton) COUNTIES Rates Fringes Plumber, Pipefitter, Steamfitter......................$ 32.15 14.05 ---------------------------------------------------------------- PLUM0015-001 05/01/2007 ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (East of a line running northeasterly from the point of Wright County that lies furthest north to that pont of Mille Lacs County that is south by west) COUNTIES Rates Fringes PLUMBER..........................$ 35.30 16.79 FOOTNOTE: Paid Holiday: Labor Day ---------------------------------------------------------------- PLUM0034-002 05/01/2007 DAKOTA, RAMSEY & WASHINGTON COUNTIES Rates Fringes PLUMBER..........................$ 35.16 16.94 FOOTNOTE: Paid Holiday: Labor Day ---------------------------------------------------------------- PLUM0417-001 06/01/2007 ANOKA, DAKOTA, HENNEPIN, RAMSEY, SCOTT & WASHINGTON COUNTIES: Rates Fringes SPRINKLER FITTER.................$ 37.92 15.31+A FOOTNOTE: A. 6 Paid Holidays: Memorial Day; July 4th; Friday before Labor Day; Labor Day; Columbus Day; & Thanksgiving Day ---------------------------------------------------------------- PLUM0455-002 05/01/2007 DAKOTA, RAMSEY & WASHINGTON COUNTIES: Rates Fringes Pipefitter/steamfitter...........$ 34.69 18.69 ---------------------------------------------------------------- PLUM0539-001 05/01/2007 ANOKA, CARVER, HENNEPIN, SCOTT & SHERBURNE (East of a line running northeasterly from the point of Wright County that lies furthest north to that pont of Mille Lacs County that is south by west) COUNTIES Rates Fringes PIPEFITTER.......................$ 35.32 17.40 ---------------------------------------------------------------- PLUM0539-007 05/01/2007 SHERBURNE COUNTY (West of a line running Northeasterly from the Northern point of Wright County to the Souithwestern tip of Mille Lacs County) Rates Fringes PIPEFITTER.......................$ 31.57 15.59 ---------------------------------------------------------------- PLUM0589-001 06/01/2007 COOK (Except a strip 20 miles inland along the shores of Lake Superior), ITASCA, KOOCHICHING, LAKE (Except a strip 20 miles inland along the shores of Lake Superior) & ST. LOUIS (North of an East-West line drawn through Cotton) COUNTIES Rates Fringes Plumber/Pipefitter/Steamfitter...$ 32.55 14.07 ---------------------------------------------------------------- ROOF0096-003 07/02/2007 CARLTON, COOK, LAKE & ST. LOUIS (South of Hwy 16, excluding city of Forbes) COUNTIES Rates Fringes ROOFER...........................$ 27.10 12.00 ---------------------------------------------------------------- * ROOF0096-005 05/01/2008 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT & WASHINGTON COUNTIES Rates Fringes ROOFER...........................$ 31.74 13.10 FOOTNOTE: Paid Holiday - Labor Day ---------------------------------------------------------------- ROOF0096-012 05/01/2007 ITASCA, KOOCHICHING & ST. LOUIS (Northern two-thirds) COUNTIES Rates Fringes ROOFER...........................$ 23.55 9.20 ---------------------------------------------------------------- SFMN0669-005 04/01/2008 CARLTON, CARVER, COOK, ITASCA, KOOCHICHING, LAKE, SHERBURNE, AND ST. LOUIS COUNTIES Rates Fringes SPRINKLER FITTER.................$ 31.26 14.05 ---------------------------------------------------------------- SHEE0010-045 05/01/2008 CARLTON, COOK, LAKE & ST. LOUIS (Southern one-third) COUNTIES Rates Fringes SHEET METAL WORKER...............$ 30.85 16.91 ---------------------------------------------------------------- SHEE0010-046 05/01/2008 ITASCA, KOOCHICHING & ST. LOUIS (Northern two-thirds) COUNTIES Rates Fringes SHEET METAL WORKER...............$ 29.99 16.08 ---------------------------------------------------------------- SHEE0010-047 05/01/2006 ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT & WASHINGTON COUNTIES Rates Fringes Sheet metal worker...............$ 34.68 15.10+a FOOTNOTE: a. 1 Paid Holiday: Labor Day ---------------------------------------------------------------- SHEE0010-048 05/01/2008 SHERBURNE COUNTY Rates Fringes SHEET METAL WORKER...............$ 31.77 15.28 ---------------------------------------------------------------- TEAM0160-014 05/01/2008 Rates Fringes TRUCK DRIVER (Site Preparation, Excavation & Incidental Paving)) AREA 1: GROUP 1....................$ 25.15 11.80 GROUP 2....................$ 24.60 11.80 GROUP 3....................$ 24.50 11.80 GROUP 4....................$ 24.25 11.80 AREA 2: GROUP 1....................$ 24.75 11.80 GROUP 2....................$ 24.20 11.80 GROUP 3....................$ 24.10 11.80 GROUP 4....................$ 23.85 11.80 AREA 2A: GROUP 1....................$ 23.80 11.80 GROUP 2....................$ 23.25 11.80 GROUP 3....................$ 23.15 11.80 GROUP 4....................$ 22.90 11.80 AREA 4: GROUP 1....................$ 19.32 11.40 GROUP 2....................$ 18.81 11.40 GROUP 3....................$ 18.66 11.40 GROUP 4....................$ 18.66 11.40 AREA DESCRIPTIONS AREA 1: ANOKA, CARVER, DAKOTA, HENNEPIN, RAMSEY, SCOTT, SHERBURNE & WASHINGTON COUNTIES AREA 2: COOK, LAKE & ST. LOUIS COUNTIES AREA 2A: CARLTON AND ITASCA (East of T.H. #6) COUNTIES AREA 4: ITASCA (West of T.H. #6), AND KOOCHICHING COUNTIES TRUCK DRIVER CLASSIFICATIONS GROUP 1 - Boom; Mechanic; Off-Road, including Articulated Dump Truck; Tractor Trailer; Winch Truck GROUP 2 - Tri Axles (Including Four Axles) GROUP 3 - Bituminous Distributor; Bituminous Distributor (One man operation); Tandem Axles & Single Axles GROUP 4 - Bituminous Distributor Spray Operator (Rear and Oiler); Dumpman; Pilot Car; Self-propelled Packer; Slurry Operator; Tank Truck Tender (Gas, Oil, Road Oil & Water); Tractor Operator (Wheel type used for any purpose) THE FOLLOWING CLASSIFICATIONS SHALL COME UNDER THE APPROPRIATE AXLE RATE WAGE GROUP: "A" Frame; Dry Batch Hauler; Ready-Mix Concrete; Slurry; Tank (Gas, Oil, Road Oil & Water) ---------------------------------------------------------------- TEAM0346-001 05/01/2008 ANOKA, CARLTON, CARVER, COOK, DAKOTA, HENNEPIN, ITASCA (East of T.H. #6), LAKE, RAMSEY, ST. LOUIS, SCOTT, SHERBURNE & WASHINGTON COUNTIES Rates Fringes TRUCK DRIVER GROUP 1.....................$ 25.70 9.70 GROUP 2.....................$ 25.15 9.70 GROUP 3.....................$ 25.05 9.70 GROUP 4.....................$ 24.80 9.70 TRUCK DRIVER CLASSIFICATIONS GROUP 1: Boom Truck GROUP 2: Ready Mix, Tractor Trailor GROUP 3: Fork Lift, Mechanic, Tandem or 3 axle truck GROUP 4: Dumpman, Farm Tractor, Single or 2 axle Truck ---------------------------------------------------------------- TEAM1097-004 05/01/2007 ITASCA (West of T.H. 36), AND KOOCHICHING COUNTIES Rates Fringes TRUCK DRIVER.....................$ 22.97 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION