General Decision Number: MN120067 02/03/2012 MN67 Superseded General Decision Number: MN20100101 State: Minnesota Construction Type: Building County: Pennington County in Minnesota. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories). Modification Number Publication Date 0 01/06/2012 1 02/03/2012 BOIL0647-001 07/01/2009 Rates Fringes BOILERMAKER......................$ 33.84 18.53 ---------------------------------------------------------------- BRMN0015-001 05/01/2010 Rates Fringes BRICKLAYER.......................$ 30.72 15.03 ---------------------------------------------------------------- CARP0606-017 06/01/2009 Rates Fringes CARPENTER (Acoustical Installation, Drywall Hanging, Form Work & Metal Stud Installation Only)..........$ 20.57 13.23 ---------------------------------------------------------------- ELEC1426-003 06/01/2011 Rates Fringes ELECTRICIAN......................$ 25.41 10.92 ---------------------------------------------------------------- * ELEV0009-004 01/01/2012 Rates Fringes ELEVATOR MECHANIC................$ 43.21 23.535 FOOTNOTE: PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0049-051 05/01/2011 Rates Fringes OPERATOR: Power Equipment GROUP 1.....................$ 32.75 15.85 GROUP 2.....................$ 32.43 15.85 GROUP 3.....................$ 31.10 15.85 GROUP 4.....................$ 30.78 15.85 GROUP 5.....................$ 30.62 15.85 GROUP 6.....................$ 29.20 15.85 GROUP 7.....................$ 28.14 15.85 GROUP 8.....................$ 26.25 15.85 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over. GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over. GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane. GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more); Overhead Crane (inside building perimeter). GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor 450 CFM or over (2 or more machines); Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2. GROUP 6: Bobcat/Skid Loader, Tractor D2 or similar size. GROUP 7: Crane Oiler. GROUP 8: Oiler, Greaser (Tractor/Truck). ---------------------------------------------------------------- IRON0512-019 10/01/2011 Rates Fringes IRONWORKER, REINFORCING, ORNAMENTAL AND STRUCTURAL........$ 29.14 20.37 ---------------------------------------------------------------- LABO0132-025 05/01/2011 Rates Fringes LABORER (LANDSCAPE)..............$ 18.79 10.05 ---------------------------------------------------------------- LABO1097-014 05/01/2011 Rates Fringes LABORER (Projects $760,000 & over:) (1) Mason Tender (Brick)....$ 19.06 12.43 (2) Pipelayer...............$ 19.46 12.43 LABORER (Projects under $760,000:) (1) Mason Tender (Brick)....$ 16.47 12.43 (2) Pipelayer...............$ 16.81 12.43 ---------------------------------------------------------------- PAIN0884-013 06/01/2010 Rates Fringes PAINTER (Brush & Roller).........$ 24.16 13.31 PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate. PAINTER'S PREMIUM - $0.75 per hour additional for the following: Two Component Paints; Epoxies; Sandblasting & Rigging; Work done on Swing Scaffolding, Safety Harness, Window Jacks, Boatswain's Chair, Coverings & Erection of Scaffolding for same; Work on Erected Structural Steel & Abrasive Blasting ---------------------------------------------------------------- PLUM0011-010 05/01/2011 Rates Fringes PLUMBER/PIPEFITTER...............$ 29.69 12.81 ---------------------------------------------------------------- ROOF0096-047 05/01/2009 Rates Fringes ROOFER...........................$ 22.89 9.65 ---------------------------------------------------------------- SHEE0010-008 06/08/2009 Rates Fringes SHEET METAL WORKER (HVAC Duct and System Installation only)....$ 21.79 11.3 ---------------------------------------------------------------- SUMN2009-021 07/27/2009 Rates Fringes CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 15.72 4.66 CEMENT MASON/CONCRETE FINISHER...$ 14.31 1.45 LABORER: Common or General......$ 11.50 1.44 LABORER: Mason Tender - Cement/Concrete..................$ 12.70 3.89 LABORER: Roof Tearoff...........$ 10.42 2.08 OPERATOR: Excavator.............$ 17.64 2.97 OPERATOR: Loader................$ 15.50 1.56 OPERATOR: Mechanic..............$ 19.74 4.47 PAINTER: Spray Only.............$ 17.98 4.47 SHEETMETAL WORKER, Excluding HVAC Duct and System Installation.....................$ 16.73 4.86 TRUCK DRIVER: Dump Truck........$ 13.92 1.08 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION