General Decision Number: MN120109 05/04/2012 MN109 Superseded General Decision Number: MN20100143 State: Minnesota Construction Type: Heavy Heavy including Water and Sewer Lines County: Blue Earth County in Minnesota. HEAVY CONSTRUCTION PROJECTS (including sewer/water construction). Modification Number Publication Date 0 01/06/2012 1 05/04/2012 ELEC0343-007 06/01/2009 Rates Fringes ELECTRICIAN......................$ 31.08 14.85 ---------------------------------------------------------------- ENGI0049-079 05/01/2011 Rates Fringes OPERATOR: Power Equipment GROUP 2.....................$ 29.36 16.60 GROUP 3.....................$ 28.91 16.60 GROUP 4.....................$ 28.61 16.60 GROUP 5.....................$ 26.04 16.60 GROUP 6.....................$ 25.17 16.60 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 2: Crane with over 135' Boom, excluding jib; Dragline & Hydraulic Backhoe with shovel-type controls 3 cubic yards and over; Grader/Blade finishing earthwork and bituminous. GROUP 3: Dragline & Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over; Mechanic; Tandem Scraper; Truck Crane; Crawler Crane GROUP 4: Bituminous Roller 8 tons & over; Elevating Grader; Bobcat/Skid Steer Loader over 1 cu yd; Loader over 1 cu yd; Grader; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Tractor over 50 hp; Bulldozer over 50 hp (Sewer & Water lines only). GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Bobcat/Skid Steer Loader up to 1 cu yd; Loader up to 1 cu yd; Tractor 50 hp or less; Bulldozer 50 hp or less. GROUP 6: Oiler, Crane Oiler CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM; CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM UNDERGROUND WORK: UNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE - $ .50 PREMIUM HAZARDOUS WASTE PROJECTS (PPE Required): LEVEL A - $1.25 PREMIUM LEVEL B - $ .90 PREMIUM LEVEL C - $ .60 PREMIUM ---------------------------------------------------------------- * IRON0512-013 05/01/2012 Rates Fringes IRONWORKER, STRUCTURAL...........$ 34.15 21.20 ---------------------------------------------------------------- LABO0132-037 05/01/2011 Rates Fringes LABORER (LANDSCAPE)..............$ 18.79 10.05 ---------------------------------------------------------------- LABO0563-006 05/01/2011 Rates Fringes LABORERS (1) Common or General Laborer (Sewer & Water Lines only).................$ 24.71 12.44 (2) Mason Tender - Cement/Concrete.............$ 24.91 12.44 (6) Pipelayer...............$ 26.71 12.44 ---------------------------------------------------------------- SUMN2009-081 09/28/2009 Rates Fringes IRONWORKER, REINFORCING..........$ 31.15 0.00 LABORER: Common or General (Excludes Water & Sewer Lines)...$ 18.90 0.00 OPERATOR: Bulldozer (Excludes Water and Sewer Lines)...........$ 21.29 7.35 TRUCK DRIVER: Straight Truck....$ 16.05 0.00 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION