General Decision Number: MN080001 09/05/2008 MN1 Superseded General Decision Number: MN20070001 State: Minnesota Construction Type: Highway Counties: Blue Earth, Brown, Cottonwood, Faribault, Jackson, Martin, Nicollet, Nobles, Rock, Sibley, Waseca and Watonwan Counties in Minnesota. HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date 0 02/08/2008 1 05/02/2008 2 05/16/2008 3 06/13/2008 4 09/05/2008 * CARP0930-009 05/01/2008 BROWN, COTTONWOOD, JACKSON, MARTIN, NOBLES, ROCK, & WATONWAN COUNTIES Rates Fringes CARPENTER........................$ 24.33 11.36 ---------------------------------------------------------------- * CARP1382-012 05/01/2008 BLUE EARTH, FARIBAULT, NICOLLET, SIBLEY AND WESECA COUNTIES Rates Fringes CARPENTER........................$ 27.53 12.64 ---------------------------------------------------------------- * ENGI0049-017 05/01/2008 Rates Fringes Power Equipment Operator Area 1 Group 1....................$ 28.61 14.15 Group 2....................$ 27.61 14.15 Group 3....................$ 26.86 14.15 Group 4....................$ 23.42 14.15 Area 2 Group 1....................$ 24.20 14.15 Group 2....................$ 23.20 14.15 Group 3....................$ 21.96 14.15 Group 4....................$ 19.65 14.15 AREA DESCRIPTIONS AREA 1 (EAST): BLUE EARTH, BROWN (East of the western right of way of Minn. Hwy 15), FARIBAULT, MARTIN (East of the western right of way of Minn. Hwy 15), NICOLLET (East of the western right of way of Minn. Hwy 15), SIBLEY (East of the western right of way of Minn. Hwy 15), WASECA & WATONWAN (East of the western right of way of Minn. Hwy 15) COUNTIES AREA 2 (WEST): BROWN (Remainder), COTTONWOOD, JACKSON, MARTIN (Remainder), NICOLLET (Remainder), NOBLES, ROCK, SIBLEY (Remainder), and WATONWAN (Remainder) COUNTIES POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: *Crane with over 135' Boom, excluding Jib GROUP 2: Locomotive Crane; Truck Crane - Crawler Crane GROUP 3: Milling, Grinding & Planing Machine GROUP 4: Truck Crane Oiler *CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM; CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM UNDERGROUND WORK: TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE - $ .50 PREMIUM HAZARDOUS WASTE PROJECTS (PPE Required): LEVEL A - $1.25 PREMIUM LEVEL B - $ .90 PREMIUM LEVEL C - $ .60 PREMIUM ---------------------------------------------------------------- IRON0512-010 05/01/2008 Rates Fringes IRONWORKER, REINFORCING..........$ 32.80 19.42 ---------------------------------------------------------------- SUMN1999-001 04/08/1999 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 17.99 Laborers: Common......................$ 12.92 3.88 Dumper......................$ 10.15 Fire Tender.................$ 11.65 2.32 Flagger.....................$ 9.25 Landscaper..................$ 9.91 3.39 Pipelayer...................$ 14.55 4.78 PAINTER (Parking Lot and Highway Striping) (Pavement Marking Only)....................$ 14.80 3.33 Power Equipment Operator Asphalt Plant...............$ 13.59 1.99 Auger.......................$ 17.43 5.25 Backhoe.....................$ 17.68 6.15 Bituminous Spreader Screws Operator....................$ 11.46 1.17 Broom.......................$ 12.13 Bulldozer...................$ 14.35 6.15 Crusher.....................$ 16.31 3.39 Front End Loader, 1 to 5 cu. yds.....................$ 13.62 Front End Loader: 5 cu. yds. & Over.................$ 10.00 Front End Loader: Under 1 cu. yd......................$ 12.91 4.33 Grader, Multi-purpose.......$ 13.68 3.04 Mechanic:...................$ 13.32 3.36 Oiler.......................$ 14.22 Roller, 8 Tons & Over.......$ 13.56 2.57 Roller, Dirt Compaction.....$ 12.78 4.48 Roller, Under 8 Tons........$ 10.29 Scraper.....................$ 15.16 6.15 Screed/Concrete.............$ 13.65 4.05 Self-propelled Packer, Rubber Tire.................$ 11.62 2.32 Spreader/Paver..............$ 13.33 2.58 Tractor Operator, Wheel Type........................$ 12.73 2.32 Trenching Machine...........$ 16.00 TRUCK DRIVER Four Axles..................$ 11.39 Greaser, Truck/Tractor......$ 11.87 2.32 Lowboy......................$ 13.79 2.83 Tandem/Three Axles..........$ 9.35 Tractor-Trailer.............$ 11.36 2.32 Two Axles...................$ 10.73 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION