General Decision Number: MI080007 06/20/2008 MI7 Superseded General Decision Number: MI20070007 State: Michigan Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.) Counties: Michigan Statewide. Modification Number Publication Date 0 02/08/2008 1 03/07/2008 2 03/21/2008 3 04/11/2008 4 05/02/2008 5 06/06/2008 6 06/13/2008 7 06/20/2008 CARP0004-004 06/01/2007 LIVINGSTON COUNTY (Townships of Brighton, Deerfield, Genoa, Hartland, Osceola and Tyrone); MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES: Rates Fringes Carpenter; piledriver............$ 28.88 15.48 ---------------------------------------------------------------- CARP0004-005 06/01/2007 DOES NOT INCLUDE LIVINGSTON COUNTY (Townships of Brighton, Deerfield, Genoa, Hartland, Osceola and Tyrone); MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES: Rates Fringes Carpenter; piledriver............$ 26.42 10.20 FOOTNOTE: DIVER: to be paid one and one-half (1-1/2) times the regular journeyperson rate. ---------------------------------------------------------------- ELEC0017-005 06/06/2006 HURON COUNTY; INGHAM COUNTY (Townships of Leroy, Locke, Wheatfield, White Oak and Williamson); LAPEER COUNTY; LENAWEE COUNTY (Townships of Clinton and Macon); LIVINGSTON COUNTY (Townships of Brighton, Conway, Genoa, Green Oak, Hamburg, Handy, Hartland, Howell, Iosco, Marion, Oceola and Putnam); MACOMB COUNTY; MONROE COUNTY (Townships of Ash, Berlin, Dundee, Exeter, Frenchtown, Ida, London, Milan, Monroe, Raisinville and Summerfield); OAKLAND, ST. CLAIR, SANILAC AND TUSCOLA COUNTIES; WASHTENAW COUNTY (Townships of Ann Arbor, Augusta, Bridgewater, Dexter, Freedom, Lima, Lodi, Northfield, Pittsfield, Salem, Saline, Scio, Superior, Webster, York and Ypsilanti); AND WAYNE COUNTY: Rates Fringes Line Construction Cable splicer; Line technician when helio-arc welding.....................$ 36.47 4.80+25.75% Combination driver/groundman............$ 24.25 4.80+25.75% Combination equipment operator and groundman......$ 25.73 4.80+25.75% Groundman...................$ 22.32 4.80+25.75% Line technician.............$ 35.00 4.80+25.75% TECHNICIAN (Commercial) ALL COMMERCIAL WORK EXCEPT LINE CONSTRUCTION:..........$ 35.77 4.80+25.75% ---------------------------------------------------------------- ELEC0876-001 06/01/2007 REMAINDER OF STATE: Rates Fringes Line Construction Cable splicer...............$ 32.71 3.75+21.5% Light equipment operator/groundman/truck driver/groundman (winch, A frame, diggers when used for distribution line truck and used for distribution work, distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under)................$ 20.70 3.75+21.5% Line technician.............$ 31.41 3.75+21.5% Operator/groundman (digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 23.62 3.75+21.5% Truck driver/groundman(trucks with winch or boom or dump, other than distribution work)..........$ 19.70 3.75+21.5% FOOTNOTE: Operators of 5/8 yard, rated capacity, backhoe or over; and operators of 25 ton, rated capacity, crane or over; and operators of heavy duty tension or pulling machinery on 345 KV and above: to receive the journeyman line technician rate of pay. ---------------------------------------------------------------- ENGI0324-003 06/01/2008 ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES: Rates Fringes Power Equipment Operators - Steel Erection: GROUP 1....................$ 42.07 17.30 GROUP 2....................$ 43.07 17.30 GROUP 3....................$ 40.57 17.30 GROUP 4....................$ 41.57 17.30 GROUP 5....................$ 39.07 17.30 GROUP 6....................$ 40.07 17.30 GROUP 7....................$ 38.80 17.30 GROUP 8....................$ 39.80 17.30 GROUP 9....................$ 38.35 17.30 GROUP 10....................$ 39.35 17.30 GROUP 11....................$ 37.62 17.30 GROUP 12....................$ 38.62 17.30 GROUP 13....................$ 37.26 17.30 GROUP 14....................$ 38.26 17.30 GROUP 15....................$ 36.62 17.30 GROUP 16....................$ 29.81 17.30 GROUP 17....................$ 28.40 17.30 GROUP 18....................$ 35.57 17.30 FOOTNOTE: Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Engineer when operating combination of boom and jib 400' or longer GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler GROUP 3: Engineer when operating combination of boom and jib 300' or longer GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler GROUP 5: Engineer when operating combination of boom and jib 220' or longer GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler GROUP 7: Engineer when operating combination of boom and jib 140' or longer GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler GROUP 9: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) GROUP 10: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler GROUP 11: Engineer when operating combination of boom and jib 120' or longer GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator GROUP 14: Crane operator on a crane that requires an oiler GROUP 15: Hoisting operator; 2 drum hoist and rubber tired backhoe GROUP 16: Compressor or welder operator GROUP 17: Oiler GROUP 18: Forklift and 1 drum hoist ---------------------------------------------------------------- ENGI0324-004 05/01/2008 Rates Fringes Power Equipment Operators - Steel Erection: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, VAN BUREN GROUP 1....................$ 28.74 16.75 GROUP 2....................$ 28.49 16.75 GROUP 3....................$ 27.99 16.75 GROUP 4....................$ 22.89 16.75 GROUP 5....................$ 21.24 16.75 GROUP 6....................$ 18.64 16.75 ANTRIM, BENZIE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE AND WEXFORD COUNTIES: GROUP 1....................$ 28.74 16.75 GROUP 2....................$ 28.49 16.75 GROUP 3....................$ 27.49 16.75 GROUP 4....................$ 22.59 16.75 GROUP 5....................$ 20.94 16.75 GROUP 6....................$ 18.14 16.75 FOOTNOTES: Crane operator with main boom and jib 300' or longer: $1.50 additional to the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 additional to the group 1 rate. Certified Crane Operator Premiums: a) Swing Boom Truck Operator over 12 tons-$.50 per hour b) Hydraulic Crane Operator 75 tons and under-$.75 per hour c) Hydraulic Crane Operator over 75 tons-$1.00 per hour d) Lattiee Boom Crane Operator-$1.50 per hour PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. POWER EQUIPMENT OPERATOR CLASSIFICATIONS: GROUP 1: Crane Operator with main boom & jib 400', 300', or 220' or longer. Tower Crane Operator with CCO certification for combined length of mast and boom 220' or longer. GROUP 2: Crane Operator with main boom & jib 140' or longer, Tower Crane(Operators without CCO certification, or less than 220' length) Gantry Crane; Whirley Derrick. GROUP 3: Regular Equipment Operator, Crane, Dozer, Loader, Hoist, Straddle Wagon, Mechanic, Grader and Hydro Excavator. GROUP 4: Air Tugger (single drum), Material Hoist Pump 6" or over, Elevators, Brokk Concrete Breaker. GROUP 5: Air Compressor, Welder, Generators, Conveyors GROUP 6: Oiler and fire tender ---------------------------------------------------------------- ENGI0324-005 09/01/2007 Rates Fringes Power equipment operators - underground construction (includes sewer): ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, EATON, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, HILLSDALE, HURON, INGHAM, IONIA, IOSCO, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, LAKE, LEELANAU, LENAWEE, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 2....................$ 22.38 15.75 ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, EATON, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, HILLSDALE, HURON, INGHAM, IONIA, IOSCO, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, LAKE, LEELANAU, LENAWEE, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 3....................$ 21.88 15.75 ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, BAY, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, EATON, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, HILLSDALE, HURON, INGHAM, HURON, INGHAM IONIA, IOSCO, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, LAKE, LEELANAU, LENAWEE, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 1....................$ 27.27 15.75 ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, EATON, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, HILLSDALE, HURON, INGHAM, IONIA, IOSCO, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, LAKE, LEELANAU, LENAWEE, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 4....................$ 21.60 15.75 GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW AND WAYNE COUNTIES: GROUP 1....................$ 28.98 15.75 GROUP 2....................$ 24.25 15.75 GROUP 3....................$ 23.52 15.75 GROUP 4....................$ 22.95 15.75 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger); Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader; Endloader; Gradall (and similar type machine); Grader; Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator GROUP 2: Boom truck (power swing type boom); Crusher; Hoist; Pump (1 or more - 6-in. discharge or larger - gas or diesel- powered or powered by generator of 300 amperes or more - inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller);Vac Truck GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger); Maintenance person; Pump (2 or more-4-in. up to 6-in. discharge-gas or diesel powered - excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger - gas or diesel powered) GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered - excluding submersible pumps); Roller (other than asphalt); Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over); End dump operator; Sweeper (Wayne type); Water wagon and Extend-a boom forklift ---------------------------------------------------------------- ENGI0324-006 06/01/2007 Rates Fringes Power equipment operators: (AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION) GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES: GROUP 1....................$ 27.61 15.77 GROUP 2....................$ 20.88 15.77 GROUP 3....................$ 22.18 15.77 GROUP 4....................$ 20.32 15.77 GENESEE, MACOMB, MONROE,OAKLAND, WASHTENAW and WAYNE COUNTIES: GROUP 5....................$ 20.15 15.77 STATEWIDE (Excluding Genesee, Macomb, Monroe, Oakland, Washtenaw and Wayne Counties): GROUP 1....................$ 27.61 15.77 GROUP 2....................$ 20.73 15.77 GROUP 3....................$ 22.03 15.77 GROUP 4....................$ 20.17 15.77 GROUP 5....................$ 19.85 15.77 FOOTNOTE: Crane premiums: Swing boom truck operator over 12 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under: $.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Asphalt plant operator; Crane operator (does not include work on bridge construction projects when the crane operator is erecting structural components); Dragline operator; Shovel operator; Locomotive operator; Paver operator (5 bags or more); Elevating grader operator; Pile driving operator; Roller operator (asphalt); Blade grader operator; Trenching machine operator (ladder or wheel type); Auto-grader; Slip form paver; Self-propelled or tractor-drawn scraper; Conveyor loader operator (Euclid type); Endloader operator (1 yd. capacity and over); Bulldozer; Hoisting engineer; Tractor operator; Finishing machine operator (asphalt); Mechanic; Pump operator (6-in. discharge or over, gas, diesel powered or generator of 300 amp. or larger); Shouldering or gravel distributing machine operator (self- propelled); Backhoe (with over 3/8 yd. bucket); Side boom tractor (type D-4 or equivalent or larger); Tube finisher (slip form paving); Gradall (and similar type machine); Asphalt paver (self- propelled); Asphalt planer (self-propelled); Batch plant (concrete-central mix); Slurry machine (asphalt); Concrete pump (3 in. and over); Roto-mill; Swinging boom truck (over 12 ton capacity); Hydro demolisher (water blaster); Farm-type tractor with attached pan GROUP 2: Screening plant operator; Washing plant operator; Crusher operator; Backhoe (with 3/8 yd. bucket or less); Side boom tractor (smaller than D-4 type or equivalent); Sweeper (Wayne type and similar equipment); Vacuum truck operator; Batch plant (concrete dry batch) GROUP 3: Grease Truck GROUP 4: Air compressor operator (600 cu. ft. per min or more); Air compressor operator (two or more, less than 600 cfm); Wagon drill operator; Concrete breaker; Tractor operator (farm type with attachment) GROUP 5: Boiler fire tender; Oiler; Fire tender; Trencher (service); Flexplane operator; Cleftplane operator; Grader operator (self-propelled fine-grade or form (concrete)); Finishing machine operator (concrete); Boom or winch hoist truck operator; Endloader operator (under 1 yd. capacity); Roller operator (other than asphalt); Curing equipment operator (self-propelled); Concrete saw operator (40 h.p. or over); Power bin operator; Plant drier operator (asphalt); Vibratory compaction equipment operator (6 ft. wide or over); Guard post driver operator (power driven); All mulching equipment; Stump remover; Concrete pump (under 3-in.); Mesh installer (self- propelled); Tractor operator (farm type); End dump; Skid steer ---------------------------------------------------------------- ENGI0324-007 05/01/2008 ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: Rates Fringes Power Equipment Operators - Steel Erection: Compressor, welder and forklift....................$ 24.11 16.47 Crane operator, main boom & jib 120' or longer........$ 27.86 16.47 Crane operator, main boom & jib 140' or longer........$ 28.11 16.47 Crane operator, main boom & jib 220' or longer........$ 28.36 16.47 Mechanic with truck and tools.......................$ 28.86 16.47 Oiler and fireman...........$ 22.81 16.47 Regular operator............$ 27.36 16.47 Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate. Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00) ---------------------------------------------------------------- ENGI0324-008 10/01/2007 Rates Fringes Power equipment operators - sewer relining: GROUP 1.....................$ 27.05 11.00 GROUP 2.....................$ 25.52 11.00 SEWER RELINING CLASSIFICATIONS GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems ---------------------------------------------------------------- ENGI0325-010 05/01/2008 ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: Rates Fringes Power equipment operators - underground construction: Crane operator, main boom & jib 120' or longer........$ 27.46 16.47 Crane operator, main boom & jib 140' or longer........$ 27.71 16.47 Crane operator, main boom & jib 220' or longer........$ 27.96 16.47 GROUP 1.....................$ 26.96 16.47 GROUP 2.....................$ 23.71 16.47 GROUP 3.....................$ 23.13 16.47 GROUP 4.....................$ 22.19 16.47 Mechanic with truck and tools.......................$ 28.46 16.47 FOOTNOTES: Swing boom truck operator over 15 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under: $.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional. Crusher pit, shafts and tunnel workers: $2.00 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Regular equipment operator, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, concrete pump, excavator, milling and pulverizing machines, scraper (self-propelled and tractor drawn), welder GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems GROUP 3: Air compressor, conveyor, concrete saw, farm tractor (without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger), end dumps and skid steer Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate. Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00) ---------------------------------------------------------------- ENGI0325-011 10/01/2007 Rates Fringes Power equipment operators - hazardous waste removal: (GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW AND WAYNE COUNTIES:) LEVEL A: Engineer when operating crane with boom and jib or leads 140' or longer....$ 34.18 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 34.48 15.75 GROUP 1....................$ 31.53 15.75 GROUP 2....................$ 27.30 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 32.50 15.75 LEVEL B AND C: Engineer when operating crane with boom and jib or leads 140' or longer....$ 33.23 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.53 15.75 GROUP 1....................$ 30.58 15.75 GROUP 2....................$ 26.35 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, pwer shovel operator.......$ 31.55 15.75 LEVEL D WHEN CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.68 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.98 15.75 GROUP 1....................$ 29.03 15.75 GROUP 2....................$ 24.80 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 29.38 15.75 LEVEL D: Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.93 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.23 15.75 GROUP 1....................$ 29.28 15.75 GROUP 2....................$ 25.05 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.25 15.75 Power equipment operators - hazardous waste removal: (REMAINDER OF STATE:) LEVEL A: Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.47 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.77 15.75 GROUP 1....................$ 29.82 15.75 GROUP 2....................$ 25.42 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.79 15.75 LEVEL D WHEN CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 140' or longer....$ 29.97 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.27 15.75 GROUP 1....................$ 27.32 15.75 GROUP 2....................$ 22.93 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.29 15.75 LEVEL D: Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.22 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.52 15.75 GROUP 1....................$ 27.57 15.75 GROUP 2....................$ 23.18 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.54 15.75 LEVELS B AND C: Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.41 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.73 15.75 GROUP 1....................$ 28.87 15.75 GROUP 2....................$ 24.48 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 29.84 15.75 HAZARDOUS WASTE REMOVAL CLASSIFICATIONS Group 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader,heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slope paver, trencher, ultra high pressure waterjet cutting tool system, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self-propelled), well drilling rig and hydro excavator GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon ---------------------------------------------------------------- ENGI0325-012 05/01/2008 Rates Fringes Power equipment operators - gas distribution and duct installation work: MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW AND WAYNE COUNTIES: GROUP 1....................$ 25.98 16.75 GROUP 2....................$ 25.85 16.75 GROUP 3....................$ 24.72 16.75 GROUP 4....................$ 24.15 16.75 STATEWIDE (does not include Macomb, Monroe, Oakland, St. Clair, Washtenaw and Wayne Counties): GROUP 1....................$ 25.07 16.75 GROUP 2-A..................$ 24.97 16.75 GROUP 2-B..................$ 24.75 16.75 GROUP 3....................$ 23.97 16.75 GROUP 4....................$ 23.47 16.75 SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work," starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation. DEFINITION OF GROUPS: MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW AND WAYNE COUNTIES: GROUP 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd. capacity or greater). GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2 yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck (with powered boom), tractor (wheel type other than backhoe or front endloader). GROUP 3: Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day) and trencher(service). GROUP 4: Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator. STATEWIDE (does not include Macomb, Monroe, Oakland, St. Clair, Washtenaw and Wayne Counties): GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe (over 1/2 yd. capacity), grader (Caterpillar 12 equivalent or larger) GROUP 2-A: Trencher(except service), backhoe (1/2 yd. capacity or less) GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or more), dozer (D-4 equivalent or larger), endloader (1 yd. capacity or larger), pump (1 or 2 six-inch or larger), side boom (D-4 equivalent or larger) GROUP 3: Backfiller, boom truck (powered), concrete saw (20 hp or larger), dozer (less than D-4 equivalent), endloader (under 1 yd. capacity), farm tractor (with attachments), pump (2 - 4 under six-inch capacity), side boom tractor(less than D-4 equivalent), tamper (self-propelled), trencher service and grader maintenance GROUP 4: Oiler, grease person and hydrostatic testing operator ---------------------------------------------------------------- IRON0008-007 06/01/2008 ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: Rates Fringes IRONWORKER (Metal Building Erection)........................$ 22.70 6.60 IRONWORKER: Reinforcing and Structural General contracts $10,000,000 or greater......$ 26.13 18.72 General contracts less than $10,000,000............$ 23.69 18.72 ---------------------------------------------------------------- IRON0008-011 06/01/2008 ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: Rates Fringes IRONWORKER (Metal Building Erection)........................$ 22.70 6.60 IRONWORKER: Reinforcing and Structural Contracts $10,000,000 or more........................$ 26.13 18.72 Contracts less than $10,000,000.................$ 23.69 18.72 ---------------------------------------------------------------- IRON0025-002 06/01/2007 ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES: Rates Fringes Ironworkers: Fence erector...............$ 21.73 19.16 Ornamental, structural, precast erector.............$ 28.93 19.64 Siding & decking............$ 24.12 17.76 ---------------------------------------------------------------- IRON0025-024 06/01/2007 ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES: Rates Fringes Ironworkers: Machinery mover, rigger and machinery erector.......$ 27.64 21.74 ---------------------------------------------------------------- IRON0026-014 06/01/2001 ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES: Rates Fringes Ironworkers: Reinforcing.................$ 23.50 15.51 Wire mesh...................$ 19.87 14.24 ---------------------------------------------------------------- IRON0055-005 10/01/2006 LENAWEE AND MONROE COUNTIES: Rates Fringes Ironworkers: Metal fences and guardrails.$ 18.93 15.89 Pre-engineered metal buildings, siding and decking.....................$ 21.28 16.08 All other work..............$ 26.00 16.08 FOOTNOTES: Work in tunnels and caissons under pressure: $.50 per hour additional. Work on furnaces, kilns or similar type units with a temperature of 125 degrees F. or over: $1.00 per hour additional. ---------------------------------------------------------------- IRON0292-003 06/01/2008 BERRIEN AND CASS COUNTIES: Rates Fringes Ironworkers: Cad Welder..................$ 24.00 16.46 Ironworker..................$ 23.50 16.46 ---------------------------------------------------------------- IRON0340-001 01/01/2007 ALLEGAN, ANTRIM, BARRY, BENZIE, BRANCH, CALHOUN, CHARLEVOIX, EATON, EMMET, GRAND TRAVERSE, HILLSDALE, IONIA, KALAMAZOO, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, VAN BUREN AND WEXFORD COUNTIES: Rates Fringes Ironworkers: Reinforcing and structural..$ 24.00 11.59 ---------------------------------------------------------------- LABO0005-006 10/01/2007 Rates Fringes Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE AND WEXFORD COUNTIES:) Levels A, B or C............$ 18.97 8.89 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D...............$ 17.97 8.89 Laborers - hazardous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) Work performed inside the building and up to and including 5 ft. outside the building: Levels A, B or C...........$ 21.84 9.64 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 20.84 9.64 Work performed over 5 ft. outside the building: Levels A, B or C...........$ 20.43 8.99 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 19.43 8.99 Laborers - hazardous waste abatement: (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (except the city of Portland); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES:) Levels A, B or C............$ 20.40 9.17 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D...............$ 19.40 9.17 Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES:) Levels A, B or C............$ 21.71 9.04 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D...............$ 20.71 9.04 Laborers - hazardous waste abatement: (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); LIVINGSTON COUNTY (west of M-151 (Oak Grove Rd.), including the City of Howell):) All work performed Levels A, B or C...........$ 21.51 9.09 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D...............$ 20.51 9.09 Laborers - hazardous waste abatement: (GENESEE, LAPEER AND SHIAWASSEE COUNTIES:) Levels A, B or C............$ 22.14 9.17 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D...............$ 21.14 9.17 Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES:) Work performed inside the building and up to and including 5 ft. outside the building: Levels A, B or C...........$ 22.15 9.19 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 21.15 9.19 Work performed over 5 ft. outside the building: Levels A, B or C...........$ 22.95 8.99 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 21.95 8.99 Laborers - hazardous waste abatement: (LIVINGSTON COUNTY (east of M-151 (Oak Grove Rd.) and south of M-59, excluding the city of Howell); AND WASHTENAW COUNTY:) Work performed inside the building and up to and including 5 ft. outside the building: Levels A, B or C...........$ 26.86 10.59 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 25.86 10.59 Work performed over 5 ft. outside the building: Levels A, B or C...........$ 22.95 8.99 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 21.95 8.99 Laborers - hazardous waste abatement: (MACOMB AND WAYNE COUNTIES:) Work performed inside the building and up to and including 5 ft. outside the building: Levels A, B or C...........$ 26.04 12.43 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 25.04 12.43 Work performed over 5 ft. outside the building: Levels A, B or C...........$ 22.81 11.75 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 21.81 11.75 Laborers - hazardous waste abatement: (MONROE COUNTY:) Work performed inside the building and up to and including 5 ft. outside the building: Levels A, B or C...........$ 26.92 11.19 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 25.92 11.19 Work performed over 5 ft. outside the building line: Levels A, B or C...........$ 22.95 8.99 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 21.95 8.99 Laborers - hazardous waste abatement: (Oakland County and the North East portion of Livingston County bordered by M-151 (Oak Grove Road) on the West and M-59 on the South.) Level A, B, C...............$ 26.04 12.43 Level D.....................$ 25.04 12.43 Laborers - hazardous waste abatement: (SANILAC AND ST. CLAIR COUNTIES:) All work performed 5 feet outside the building Levels A, B or C...........$ 21.29 8.99 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 20.29 8.99 Work performed inside the building and up to and including 5 ft. outside the building: Levels A, B or C...........$ 25.69 10.25 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 24.69 10.52 ---------------------------------------------------------------- LABO0259-001 09/01/2007 Rates Fringes Laborers - tunnel, shaft and caisson: MACOMB, OAKLAND AND WAYNE COUNTIES: GROUP 1....................$ 21.51 11.81 GROUP 2....................$ 21.62 11.81 GROUP 3....................$ 21.68 11.81 GROUP 4....................$ 21.86 11.81 GROUP 5....................$ 22.11 11.81 GROUP 6....................$ 22.44 11.81 GROUP 7....................$ 15.72 11.81 STATEWIDE (Except Macomb, Oakland and Wayne Counties): GROUP 1....................$ 22.20 9.05 GROUP 2....................$ 22.29 9.05 GROUP 3....................$ 22.39 9.05 GROUP 4....................$ 22.55 9.05 GROUP 5....................$ 22.81 9.05 GROUP 6....................$ 23.12 9.05 GROUP 7....................$ 15.39 9.05 SCOPE OF WORK: Tunnel, shaft and caisson work of every type and description and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction. TUNNEL LABORER CLASSIFICATIONS GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas) and watchman GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar machine, material mixer, fence erector and guard rail builder GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.) GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.) GROUP 6: Dynamite and powder GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc. ---------------------------------------------------------------- LABO0334-001 09/01/2007 Rates Fringes Laborers - open cut: ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OSTEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN AND WEXFORD COUNTIES: GROUP 1....................$ 19.05 9.05 GROUP 2....................$ 19.18 9.05 GROUP 3....................$ 19.29 9.05 GROUP 4....................$ 19.36 9.05 GROUP 5....................$ 19.48 9.05 GROUP 6....................$ 16.70 9.05 GROUP 7....................$ 15.04 9.05 ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: GROUP 1....................$ 19.28 9.05 GROUP 2....................$ 19.42 9.05 GROUP 3....................$ 19.55 9.05 GROUP 4....................$ 19.60 9.05 GROUP 5....................$ 19.65 9.05 GROUP 6....................$ 17.03 9.05 GROUP 7....................$ 15.14 9.05 CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (City of Portland); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (west of M-151 Oak Grove Rd.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES: GROUP 1....................$ 20.14 9.05 GROUP 2....................$ 20.28 9.05 GROUP 3....................$ 20.40 9.05 GROUP 4....................$ 20.45 9.05 GROUP 5....................$ 20.59 9.05 GROUP 6....................$ 17.89 9.05 GROUP 7....................$ 15.04 9.05 LIVINGSTON COUNTY (east of M-151 (Oak Grove Rd.)); MONROE AND WASHTENAW COUNTIES: GROUP 1....................$ 21.43 9.44 GROUP 2....................$ 21.54 9.44 GROUP 3....................$ 21.66 9.44 GROUP 4....................$ 21.73 9.44 GROUP 5....................$ 21.88 9.44 GROUP 6....................$ 19.18 9.44 GROUP 7....................$ 15.82 9.44 MACOMB, OAKLAND AND WAYNE COUNTIES: GROUP 1....................$ 21.36 11.81 GROUP 2....................$ 21.47 11.81 GROUP 3....................$ 21.52 11.81 GROUP 4....................$ 21.60 11.81 GROUP 5....................$ 21.66 11.81 GROUP 6....................$ 19.11 11.81 GROUP 7....................$ 15.73 11.81 SCOPE OF WORK: Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. For all areas except the Upper Peninsula, open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut constructon work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work. OPEN CUT LABORER CLASSIFICATIONS GROUP 1: Construction laborer GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, guard rail builder, headwall, seawall, breakwall, dock builder and fence erector GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g., wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person GROUP 4: Trench or excavating grade person GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits) GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc. ---------------------------------------------------------------- LABO0465-001 06/01/2007 Rates Fringes Laborers: (does not include hazardous waste abatement; tunnel, shaft & caisson; or open cut construction) ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OSTEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON AND WEXFORD GROUP 1....................$ 20.52 9.27 GROUP 2....................$ 20.73 9.27 GROUP 3....................$ 21.02 9.27 GROUP 4....................$ 21.46 9.27 GROUP 5....................$ 21.08 9.27 GROUP 6....................$ 21.51 9.27 ALL COUNTIES IN THE UPPER PENINSULA OF MICHIGAN GROUP 1....................$ 20.52 9.27 GROUP 2....................$ 20.73 9.27 GROUP 3....................$ 21.02 9.27 GROUP 4....................$ 21.46 9.27 GROUP 5....................$ 21.08 9.27 GROUP 6....................$ 21.51 9.27 ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA AND VAN BUREN COUNTIES: GROUP 1....................$ 21.27 9.27 GROUP 2....................$ 21.47 9.27 GROUP 3....................$ 21.71 9.27 GROUP 4....................$ 22.06 9.27 GROUP 5....................$ 21.93 9.27 GROUP 6....................$ 22.27 9.27 GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES: GROUP 1....................$ 23.02 9.32 GROUP 2....................$ 23.15 9.32 GROUP 3....................$ 23.33 9.32 GROUP 4....................$ 23.41 9.32 GROUP 5....................$ 23.62 9.32 GROUP 6....................$ 23.92 9.32 LABORER CLASSIFICATIONS GROUP 1: Asphalt shoveler or loader; asphalt plant misc.; burlap person; yard person; dumper (wagon, truck, etc.); joint filling laborer; miscellaneous laborer; unskilled laborer; sprinkler laborer; form setting laborer; form stripper; pavement reinforcing; handling and placing (e.g., wire mesh, steel mats, dowel bars); mason's tender or bricklayer's tender on manholes; manhole builder; headwalls, etc.; waterproofing,(other than buildings) seal coating and slurry mix, shoring, underpinning; pressure grouting; bridge pin and hanger removal; material recycling laborer; horizontal paver laborer (brick, concrete, clay, stone and asphalt); ground stabilization and modification laborer; grouting; waterblasting; top person; railroad track and trestle laborer; carpenters' tender; guard rail builders' tender; earth retention barrier and wall and M.S.E. wall installer's tender; highway and median installer's tender(including sound, retaining, and crash barriers); fence erector's tender; asphalt raker tender; sign installer; remote control operated equipment. GROUP 2: Mixer operator (less than 5 sacks); air or electric tool operator (jackhammer, etc.); spreader; boxperson (asphalt, stone, gravel); concrete paddler; power chain saw operator; paving batch truck dumper; tunnel mucker (highway work only); concrete saw (under 40 h.p.) and dry pack machine; roto-mill grounds person. GROUP 3: Tunnel miner (highway work only); finishers tenders; guard rail builders; highway and median barrier installer; earth retention barrier and wall and M.S.E. wall installer's (including sound, retaining and crash barriers); fence erector; bottom person; powder person; wagon drill and air track operator; diamond and core drills; grade checker; certified welders;curb and side rail setter's tender. GROUP 4: Asphalt raker GROUP 5: Pipe layers, oxy-gun GROUP 6: Line-form setter for curb or pavement; asphalt screed checker/screw man on asphalt paving machines. ---------------------------------------------------------------- PAIN0022-002 06/01/2007 HILLSDALE, JACKSON AND LENAWEE COUNTIES; LIVINGSTON COUNTY (east of the eastern city limits of Howell, not including the city of Howell, north to the Genesee County line and south to the Washtenaw County line); MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES: Rates Fringes PAINTER..........................$ 24.46 14.25 FOOTNOTES: For all spray work and journeyman rigging for spray work, also blowing off, $0.80 per hour additional (applies only to workers doing rigging for spray work on off the floor work. Does not include setting up or moving rigging on floor surfaces, nor does it apply to workers engaged in covering up or tending spray equipment. For all sandblasting and spray work performed on highway bridges, overpasses, tanks or steel, $0.80 per hour additional. For all brushing, cleaning and other preparatory work (other than spraying or steeplejack work) at scaffold heights of fifty (50) feet from the ground or higher, $0.50 per hour additional. For all preparatorial work and painting performed on open steel under forty (40) feet when no scaffolding is involved, $0.50 per hour additional. For all swing stage work-window jacks and window belts-exterior and interior, $0.50 per hour additional. For all spray work and sandblaster work to a scaffold height of forty (40) feet above the floor level, $0.80 per hour additional. For all preparatorial work and painting on all highway bridges or overpasses up to forty (40) feet in height, $0.50 per hour additional. For all steeplejack work performed where the elevation is forty (40) feet or more, $1.25 per hour additional. ---------------------------------------------------------------- PAIN0312-001 06/01/2003 ALLEGAN COUNTY (does not include the townships of Dorr, Fillmore, Heath, Hopkins, Laketown, Leighton, Manlius, Monterey, Overisel, Salem, Saugatuck and Wayland)); BARRY, BRANCH AND CALHOUN COUNTIES; CASS COUNTY (east of an imaginary line running north and south through the town of Cassopolis); EATON COUNTY (Townships of Bellevue and Olivet); KALAMAZOO AND ST. JOSEPH COUNTIES; VAN BUREN COUNTY (east of an imaginary line running north and south through the town of Lawrence): Rates Fringes Painters: Brush and roller; sign painting....................$ 18.70 8.05 Mechanical roller...........$ 19.40 8.05 Spray and sandblast.........$ 19.90 8.05 Swing stage, structural steel, steeplejack, boatswain chair and confined space..............$ 19.50 8.05 ---------------------------------------------------------------- PAIN0845-003 05/10/2003 CLINTON COUNTY; EATON COUNTY (does not include the townships of Bellevue and Olivet); INGHAM COUNTIES; IONIA COUNTY (east of Hwy. M 66); LIVINGSTON COUNTY (west of the eastern city limits of Howell, including the city of Howell, north to the Genesee County line and south to the Washtenaw County line); AND SHIAWASSEE COUNTY (Townships of Bennington, Laingsbury and Perry): Rates Fringes PAINTER..........................$ 20.83 7.37 FOOTNOTES: Work on vinyl, spray, blow-off, blast-all blasting including water blasting, lead, all epoxy, and high rate: $.85 per hour additional. ---------------------------------------------------------------- PAIN0845-015 06/01/1998 MUSKEGON COUNTY; NEWAYGO COUNTY (except the Townships of Barton, Big Prairie, Brooks, Croton, Ensley, Everett, Goodwell, Grant, Home, Monroe, Norwich and Wilcox); OCEANA COUNTY; OTTAWA COUNTY (except the townships of Allendale, Blendone, Chester, Georgetown, Holland, Jamestown, Olive, Park, Polkton, Port Sheldon, Tallmadge, Wright and Zeeland): Rates Fringes Painters: Brush (falling distance which exceeds 30')......$ 17.45 2.31 Brush and roller............$ 16.95 2.31 Spray (falling distance which exceeds 30'); Sandblasting (falling distance which exceeds 30'); High work (all preparatorial work, sand blasting, and painting from a falling height exceeding 30 ft. on the following named structures: radio towers, exterior cranes but not including work performed from scaffolding or a platform or basket suspended from a crane or hoist)......................$ 18.20 2.31 Spray; Sandblasting; Hydroblast (handheld lance 5,000 PSI and over); Power grinders (7" disc or over).......................$ 17.70 2.31 Work performed in confined spaces......................$ 18.45 2.31 ---------------------------------------------------------------- PAIN0845-018 05/11/2000 ALLEGAN COUNTY (Townships of Dorr, Fillmore, Heath, Hopkins, Laketown, Leighton, Manlius, Monterey, Overisel, Salem, Saugatuck and Wayland); IONIA COUNTY (west of Hwy. M-66); KENT, MECOSTA AND MONTCALM COUNTIES; NEWAYGO COUNTY (Townships of Barton, Big Prairie, Brooks, Croton, Ensley, Everett, Goodwell, Grant, Home, Monroe, Norwich and Wilcox); OSCEOLA COUNTY (south of Hwy. #10); OTTAWA COUNTY (Townships of Allendale, Blendone, Chester, Georgetown, Holland, Jamestown, Olive, Park, Polkton, Port Sheldon, Tallmadge, Wright and Zeeland): Rates Fringes Painters: Bridges over highways and railroads: Brush......................$ 15.41 5.66 Spray......................$ 16.41 5.66 Water - sandblast..........$ 16.91 5.66 Brush, swing stage; window jacks and belts.............$ 15.66 5.66 Brush.......................$ 15.16 5.66 Electric substations........$ 16.66 5.66 Fireproofing work...........$ 16.16 5.66 Interior high work: Brush......................$ 16.66 5.66 Spray......................$ 17.66 5.66 Interior pipes closed vessels and closed tanks: Brush......................$ 15.66 5.66 Spray......................$ 16.66 5.66 Spray or sandblast, swing stage; steeplejack..........$ 16.66 5.66 Spray.......................$ 16.16 5.66 Steamclean..................$ 16.16 5.66 Waterblast; sandblast.......$ 16.91 5.66 FOOTNOTES: Lead abatement work: $1.00 per hour additional. ---------------------------------------------------------------- PAIN1011-003 06/01/2007 ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES: Rates Fringes PAINTER..........................$ 21.50 7.99 FOOTNOTES: High pay (bridges, overpasses, watertower): 30 to 80 ft.: $.65 per hour additional. 80 ft. and over: $1.30 per hour additional. ---------------------------------------------------------------- PAIN1474-002 06/01/2007 HURON COUNTY; LAPEER COUNTY (east of Hwy. M-53); ST. CLAIR, SANILAC AND TUSCOLA COUNTIES: Rates Fringes Painters:........................$ 24.00 10.80 FOOTNOTES: Lead abatement work: $1.00 per hour additional. Work with any hazardous material: $1.00 per hour additional. Sandblasting, steam cleaning and acid cleaning: $1.00 per hour additional. Ladder work at or above 40 ft., scaffold work at or above 40 ft., swing stage, boatswain chair, window jacks and all work performed over a falling height of 40 ft.: $1.00 per hour additional. Spray gun work, pick pullers and those handling needles, blowing off by air pressure, and any person rigging (setting up and moving off the ground): $1.00 per hour additional. Steeplejack, tanks, gas holders, stacks, flag poles, radio towers and beacons, power line towers, bridges, etc.: $1.00 per hour additional, paid from the ground up. ---------------------------------------------------------------- * PAIN1803-003 06/01/2008 ALCONA, ALPENA, ANTRIM, ARENAC, BAY, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, IOSCO, ISABELLA, KALKASKA, LAKE, LEELANAU, MANISTEE, MASON, MIDLAND, MISSAUKEE, MONTMORENCY AND OGEMAW COUNTIES; OSCEOLA COUNTY (north of Hwy. #10); OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW AND WEXFORD COUNTIES: Rates Fringes Painters: Work performed on water, bridges over water or moving traffic, radio and powerline towers, elevated tanks, steeples, smoke stacks over 40 ft. of falling heights, recovery of lead-based paints and any work associated with industrial plants, except maintenance of industrial plants......................$ 23.20 10.75 All other work, including maintenance of industrial plant.......................$ 21.78 10.75 FOOTNOTES: Spray painting, sandblasting, blowdown associated with spraying and blasting, water blasting and work involving a swing stage, boatswain chair or spider: $1.00 per hour additional. All work performed inside tanks, vessels, tank trailers, railroad cars, sewers, smoke stacks, boilers or other spaces having limited egress not including buildings, opentop tanks, pits, etc.: $1.25 per hour additional. ---------------------------------------------------------------- PLAS0016-016 06/01/2007 Rates Fringes CEMENT MASON/CONCRETE FINISHER GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES..............$ 26.68 9.30 STATEWIDE (Does not include Genesee, Livingston, Macomb, Monroe, Oakland, Saginaw, Washtenaw and Wayne Counties)...................$ 25.18 9.30 ---------------------------------------------------------------- PLUM0190-003 05/01/2008 Rates Fringes Plumber/Pipefitter - gas distribution pipeline: Welding in conjunction with gas distribution pipeline work...............$ 27.63 15.64 All other work:.............$ 20.26 9.90 ---------------------------------------------------------------- SUMI2002-001 05/01/2002 Rates Fringes Flag Person......................$ 7.22 Pavement Marking Machine (line protector) (GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE).............$ 17.39 7.55 Pavement Marking Machine (line protector) (STATEWIDE (EXCLUDING GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE)...........................$ 16.11 7.50 Pavement Marking Machine (STATEWIDE EXCEPT GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW and WAYNE))............$ 20.14 7.50 Pavement Marking Machine GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES:.............$ 21.74 7.55 PAVEMENT MARKER AND LINE PROTECTOR CLASSIFICATIONS PAVEMENT MARKER: Performs all operations, including use of all tools and equipment for the placement or removal of pavement marking or markers. LINE PROTECTOR: Performs all operations for the protection of fresh markings or markers in a striping convoy operation. ---------------------------------------------------------------- TEAM0007-004 06/01/2004 Rates Fringes Truck drivers: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES: Euclids, double bottomms and lowboys................$ 23.645 .50 + a+b Trucks under 8 cu. yds.....$ 23.395 .50 + a+b GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNECOUNTIES: Trucks, 8 cu. yds. and over.......................$ 23.495 .50 + a+b STATEWIDE (Does not include Genesee, Livingston, Macomb, Monroe, Oakland, Washtenaw and Wayne Counties): Euclids, double bottoms and lowboys................$ 23.545 .50 + a+b Trucks under 8 cu. yds.....$ 23.295 .50 + a+b Trucks, 8 cu. yds. and over.......................$ 23.395 .50 + a+b Footnote: a. $265.90 per week b. $28.00 daily ---------------------------------------------------------------- TEAM0247-004 06/01/2004 Rates Fringes Sign Installer GENESEE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES: GROUP 1....................$ 21.73 .15 + a GROUP 2....................$ 21.48 .15 + a STATEWIDE (Does not include Genesee, Macomb, Monroe, Oakland, Washtenaw and Wayne Counties: GROUP 1....................$ 20.18 .15 + a GROUP 2....................$ 19.93 .15 + a FOOTNOTE: a. $132.70 per week, plus $17.80 per day. SIGN INSTALLER CLASSIFICATION:S GROUP 1: performs all necessary labor and uses all tools required to construct and set concrete forms required in the installation of highway and street signs GROUP 2: performs all miscellaneous labor, uses all hand and power tools, and operates all other equipment, mobile or otherwise, required for the installation of highway and street signs ---------------------------------------------------------------- TEAM0247-010 04/01/2004 Rates Fringes Truck drivers - underground construction: GENESEE, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW AND WAYNE GROUP 1....................$ 20.92 172.80/wk +34.0 GROUP 2....................$ 21.06 172.80/wk.+34.0 GROUP 3....................$ 21.25 172.80/wk.+34.0 LAPEER AND SHIAWASSEE COUNTIES: GROUP 1....................$ 20.72 172.80/wk.+34.0 GROUP 2....................$ 20.81 172.80/wk.+34.0 GROUP 3....................$ 21.02 172.80/wk.+34.0 PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. SCOPE OF WORK: Excavation, site preparation, land balancing, grading, sewers, utilities and improvements; also including but not limited to, tunnels, underground piping, retention, oxidation, flocculation facilities, conduits, general excavation and steel sheeting for underground construction.Underground construction work shall not include any structural modifications, alterations, additions and repairs to buildings or highway work, including roads, streets, bridge construction and parking lots or steel erection. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Truck driver on all trucks (EXCEPT dump trucks of 8 cubic yards capacity or over, pole trailers, semis, low boys, Euclid, double bottom and fuel trucks) GROUP 2: Truck driver on dump trucks of 8 cubic yards capacity or over, pole trailers, semis and fuel trucks GROUP 3: Truck driver on low boy, Euclid and double bottom ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION