General Decision Number: MI080005 06/20/2008 MI5 Superseded General Decision Number: MI20070005 State: Michigan Construction Types: Building and Heavy Counties: Bay, Genesee, Lapeer, Saginaw, St Clair and Tuscola Counties in Michigan. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS (does not include airport or bridge construction projects, or sewer or water line work if it is incidental to a highway construction project) Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 03/21/2008 4 04/04/2008 5 05/02/2008 6 06/06/2008 7 06/13/2008 8 06/20/2008 ASBE0025-002 06/01/2007 ST. CLAIR COUNTY: Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems..........$ 29.32 19.39 FOOTNOTE: Work requiring a spray coating in the application: Five percent (5%) per hour additional. ---------------------------------------------------------------- ASBE0047-010 07/01/2007 Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 27.42 14.31 ---------------------------------------------------------------- BOIL0169-004 01/01/2007 Rates Fringes BOILERMAKER......................$ 29.877 20.234 ---------------------------------------------------------------- BRMI0007-001 07/01/2005 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes Marble, terrazzo and tile finisher.........................$ 15.08 5.57 Marble, terrazzo and tile setter...........................$ 20.50 8.19 ---------------------------------------------------------------- BRMI0009-012 08/01/2005 Rates Fringes Bricklayer, Caulker, Cleaner, Pointer..........................$ 26.00 12.23 Cement Mason and plasterer.......$ 23.32 9.65 CEMENT MASON/CONCRETE FINISHER...$ 22.72 9.15 FINISHER.........................$ 19.13 8.37 PLASTERER........................$ 23.98 8.94 Tile, Marble & Terrazzo Worker...$ 22.00 9.29 FOOTNOTE: Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year. ---------------------------------------------------------------- BRMI0009-014 08/01/2007 LAPEER COUNTY: Rates Fringes Bricklayer, Caulker, Cleaner, Pointer & Stonemason.............$ 28.25 14.10 Cement Mason and plasterer.......$ 25.94 12.04 FINISHER.........................$ 22.00 9.51 Tile, Marble & Terrazzo Worker...$ 25.63 11.77 FOOTNOTE: Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year. ---------------------------------------------------------------- BRMI0010-002 06/01/2005 ST. CLAIR COUNTY: Rates Fringes BRICKLAYER Bricklayer.................$ 26.90 13.33 Cement mason...............$ 26.52 12.43 Plasterer..................$ 26.80 12.43 FOOTNOTES: Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year. ---------------------------------------------------------------- BRMI0010-004 08/01/2005 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes BRICKLAYER.......................$ 23.96 11.61 CEMENT MASON/CONCRETE FINISHER...$ 22.21 10.94 FINISHER.........................$ 15.08 5.57 PLASTERER........................$ 23.22 12.01 Tile, Marble & Terrazzo Worker...$ 20.50 8.19 FOOTNOTE: Paid Holiday: Fourth of July, if the worker is employed by the contractor in any period of seven working days before said holiday within the current calendar year. ---------------------------------------------------------------- BRMI0032-002 06/01/2007 ST. CLAIR COUNTY: Rates Fringes MARBLE FINISHER..................$ 24.49 15.08 Marble Mason.....................$ 30.68 15.08 TERRAZZO FINISHER................$ 24.89 15.08 TERRAZZO WORKER/SETTER...........$ 30.21 15.08 TILE FINISHER....................$ 24.51 15.08 TILE SETTER......................$ 30.11 15.08 FOOTNOTES: Work on scaffolding over 15 ft.: $1.25 per hour additional.Swing stage work: $1.50 per hour additional.Terrazzo grinding: $0.50 per hour above the terrazzo finisher rate. Terrazzo work grinding vertical work and stairs: $1.50 per hour above the terrazzo finisher rate. ---------------------------------------------------------------- CARP0687-002 06/01/2007 ST. CLAIR COUNTY: Rates Fringes Carpenter, Drywall Hanger .................................$ 26.88 15.27 Diver............................$ 33.19 17.95 Pile Driver......................$ 26.597 25.08%+8.916 FOOTNOTES: Piledrivers: Loftsperson or sticker:$0.55 per hour additional. Loftsperson or sticker on heights over 150 feet: $0.80 per hour additional. Welder: $0.55 per hour additional. ---------------------------------------------------------------- CARP0706-001 06/01/2007 GENESEE AND LAPEER COUNTIES: Rates Fringes CARPENTER (Including drywall hangers).$ 26.42 10.03 ---------------------------------------------------------------- CARP0706-002 06/01/2007 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes CARPENTER (Including drywall hangers).$ 26.42 10.03 ---------------------------------------------------------------- CARP1045-002 06/01/2001 ST. CLAIR COUNTY: Rates Fringes LATHER...........................$ 24.907 36.08% + 3.81 ---------------------------------------------------------------- CARP1045-006 06/01/2001 GENESEE AND ST. CLAIR COUNTIES: Rates Fringes FLOOR LAYER: CARPET (SOFT) FLOOR............................$ 23.38 10.29 ---------------------------------------------------------------- CARP1045-017 07/17/2002 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes LATHER...........................$ 24.67 7.18 ---------------------------------------------------------------- CARP1045-018 07/17/2002 GENESEE AND LAPEER COUNTIES: Rates Fringes LATHER...........................$ 25.23 7.22 ---------------------------------------------------------------- ELEC0017-002 06/01/2006 LAPEER, ST. CLAIR AND TUSCOLA COUNTIES: Rates Fringes Line Construction Cable splicer; Line technician when helio-arc welding.....................$ 36.47 4.80+25.75% Combination driver/groundman............$ 24.25 4.80+25.75% Combination equipment operator and groundman......$ 25.73 4.80+25.75% Groundman...................$ 22.32 4.80+25.75% lineman.....................$ 35.00 4.80+25.75% TECHNICIAN (all commercial work except line construction)...$ 35.72 4.80+25.75% ---------------------------------------------------------------- ELEC0058-001 03/01/2006 ST. CLAIR COUNTY: Rates Fringes Electricians: Work on sound and communications/limited- energy systems (including inter-communication public address, paging, music, security systems, nurse call systems, telecommunications (voice and data), fiber optic cabling systems, sound systems, broadband systems, computer network systems, CCTV systems, fire detection/signaling systems, and temperature control systems)............$ 27.83 3% + 6.25 All other work..............$ 33.00 3% +14.16 ---------------------------------------------------------------- ELEC0557-001 06/01/2007 AGINAW COUNTY; TUSCOLA COUNTY (Townships of Almer, Arbela, Columbia, Dayton, Denmark, Elkland, Ellington, Elmwood, Fairgrove, Fremont, Gilford, Indianfields, Juniata, Kingston, Koylon, Novesta, Tuscola, Vassar, Watertown and Wells): Rates Fringes ELECTRICIAN......................$ 29.92 14.65 FOOTNOTE: High work: Electrical work thirty-five feet (35') (to the work) above the ground or permanent floor, where a hazard exists:15% per hour additional. ---------------------------------------------------------------- ELEC0692-002 06/03/2007 BAY COUNTY AND TUSCOLA COUNTY (Townships of Akron and Wisner): Rates Fringes ELECTRICIAN......................$ 28.54 6.85+25% ---------------------------------------------------------------- ELEC0876-002 06/01/2007 BAY, GENESEE AND SAGINAW COUNTIES: Rates Fringes Line Construction Cable splicer...............$ 32.71 3.75+21.5% Light equipment operator/ground person/truck driver/ground person (winch, A-frame, diggers when used for distribution line truck and used for distribution work. Distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under).............$ 20.70 3.75+21.5% Line technician.............$ 31.41 3.75+21.5% Operator/groundman (digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 23.62 3.75+21.5% Truck driver/groundman (trucks with winch or boom or dump, other than distribution work)..........$ 19.70 3.75+21.5% FOOTNOTE: Operators of 5/8 yd. rated capacity backhoe or over, and operators of 25 ton, rated capacity, crane or over, and operators of heavy duty tension or pulling machinery on 345 KV and above, shall receive the line technician rate of pay. ---------------------------------------------------------------- ELEC0948-001 06/04/2007 GENESEE AND LAPEER COUNTIES; TUSCOLA COUNTY (Township of Millington): Rates Fringes ELECTRICIAN......................$ 34.89 6.60+22% Sound & Communication Technician.......................$ 22.10 6.60+15.5% FOOTNOTES: Work on towers or stacks: double the straight time rate of pay. Work in other hazardous locations located 40 or more feet from the floor or ground to the work: 10% per hour additional. Work under compressed air in tunnels or shafts below the ground level: 15% per hour additional. Work in an area where injurious gases or fumes are present and when instructed to wear gas masks: 15% per hour additional while working in that area and being required to wear gas masks. ---------------------------------------------------------------- ELEV0036-002 01/01/2008 ST. CLAIR COUNTY: Rates Fringes ELEVATOR MECHANIC................$ 40.22 16.285 FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Friday after, and Christmas Day. ---------------------------------------------------------------- ELEV0085-002 01/01/2008 BAY, GENESEE, LAPEER, SAGINAW, AND TUSCOLA COUNTIES: Rates Fringes ELEVATOR MECHANIC................$ 40.50 16.285 FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Friday after, and Christmas Day. ---------------------------------------------------------------- ENGI0324-008 10/01/2007 Rates Fringes Power equipment operators - sewer relining: GROUP 1.....................$ 27.05 11.00 GROUP 2.....................$ 25.52 11.00 SEWER RELINING CLASSIFICATIONS GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems ---------------------------------------------------------------- ENGI0324-010 06/01/2008 ST. CLAIR COUNTY: Rates Fringes Power equipment operators: GROUP 1....................$ 37.99 16.75 GROUP 2....................$ 36.49 16.75 GROUP 3....................$ 34.99 16.75 GROUP 4....................$ 34.69 16.75 GROUP 5....................$ 33.87 16.75 GROUP 6....................$ 33.01 16.75 GROUP 7....................$ 32.04 16.75 GROUP 8....................$ 30.33 16.75 GROUP 9....................$ 23.02 16.75 GROUP 10....................$ 21.99 16.75 FOOTNOTES: Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional. Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Crane with boom & jib or leads 400' or longer GROUP 2: Crane with boom & jib or leads 300' or longer GROUP 3: Crane with boom & jib or leads 220' or longer GROUP 4: Crane with boom & jib or leads 140' or longer GROUP 5: Crane with boom & jib or leads 120' or longer GROUP 6: Regular crane operator, job mechanic, and concrete pump with boom operator GROUP 7: Regular engineer, Hydro-Excavator, Remote Controlled Concrete Breaker GROUP 8: Engineer when operating forklift, lull, extend-a-boom forklift GROUP 9: Engineer when operating compressor or welding machine GROUP 10: Fire tender or oiler ---------------------------------------------------------------- ENGI0324-011 06/01/2008 Rates Fringes Power equipment operators - steel erection: GROUP 1....................$ 42.07 17.30 GROUP 2....................$ 43.07 17.30 GROUP 3....................$ 40.57 17.30 GROUP 4....................$ 41.57 17.30 GROUP 5....................$ 39.07 17.30 GROUP 6....................$ 40.07 17.30 GROUP 7....................$ 38.80 17.30 GROUP 8....................$ 39.80 17.30 GROUP 9....................$ 38.35 17.30 GROUP 10....................$ 39.35 17.30 GROUP 11....................$ 37.62 17.30 GROUP 12....................$ 38.62 17.30 GROUP 13....................$ 37.26 17.30 GROUP 14....................$ 38.26 17.30 GROUP 15....................$ 36.62 17.30 GROUP 16....................$ 29.81 17.30 GROUP 17....................$ 28.40 17.30 GROUP 18....................$ 35.57 17.30 FOOTNOTE: Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Engineer when operating combination of boom and jib 400' or longer GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler GROUP 3: Engineer when operating combination of boom and jib 300' or longer GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler GROUP 5: Engineer when operating combination of boom and jib 220' or longer GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler GROUP 7: Engineer when operating combination of boom and jib 140' or longer GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler GROUP 9: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level) GROUP 10: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler GROUP 11: Engineer when operating combination of boom and jib 120' or longer GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler GROUP 13: Crane operator; job mechanic; 3 drum hoist and excavator GROUP 14: Crane operator on a crane that requires an oiler GROUP 15: Hoisting operator; 2 drum hoist and rubber tire backhoe GROUP 16: Compressor or welder operator GROUP 17: Oiler GROUP 18: Forklift and 1 drum hoist ---------------------------------------------------------------- ENGI0324-013 09/01/2007 Rates Fringes Power equipment operators - underground construction (includes sewer): ( Zone 2 rates: Bay, Midland, Saginaw, Huron and Sasnilac) Group 1.....................$ 27.27 15.75 Group 2.....................$ 22.38 15.75 Group 3.....................$ 21.88 15.75 Group 4.....................$ 21.60 15.75 Power equipment operators - underground construction (includes sewer): (Zone 1 rates: Genesee, Lapeer and St. Clair) GROUP 1.....................$ 28.98 15.75 GROUP 2.....................$ 24.25 15.75 GROUP 3.....................$ 23.52 15.75 GROUP 4.....................$ 22.95 15.75 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger); Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader; Endloader; Gradall (and similar type machine); Grader; Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator GROUP 2: Boom truck (power swing type boom); Crusher; Hoist; Pump (1 or more-6-in. discharge or larger-gas or diesel-powered or powered by generator of 300 amperes or more-inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller) ; Vac Truck GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non-powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger); Maintenance person; Pump (2 or more-4-in. up to 6-in. discharge-gas or diesel powered-excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger-gas or diesel powered) GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered-excluding submersible pumps); Roller (other than asphalt); Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over); End dump operator; Sweeper (Wayne type and similar equipment); Water Wagon and Extend-a-boom ---------------------------------------------------------------- ENGI0324-014 05/01/2008 BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes Power equipment operators: GROUP 1.....................$ 28.39 16.75 GROUP 2.....................$ 28.14 16.75 GROUP 3.....................$ 27.04 16.75 GROUP 4.....................$ 22.24 16.75 GROUP 5.....................$ 21.64 16.75 GROUP 6.....................$ 19.19 16.75 GROUP 7.....................$ 17.49 16.75 FOOTNOTES: Certified Crane Operator Premiums: a) Swing Boom Truck Operator over 12 tons-$.50 per hour b) Hydraulic Crane Operator 75 tons and under-$.75 per hour c) Hydraulic Crane Operator over 75 tons-$1.00 per hour d) Lattiee Boom Crane Operator-$1.50 per hour Crane operator with main boom and jib 300' or longer: $1.50 per hour above the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 per hour above the group 1 rate. PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Crane operator with main boom and jib 400', 300', or 220' or longer. Tower crane operator with CCO certification for combined length of mast and boom 220' or longer GROUP 2: Crane operator with main boom and jib 140' or longer, tower cranes (Operators without CCO certification, or less than 220' length), gantry crane, whirley derrick GROUP 3: Regular equipment operator; crane, stiff leg derrick, scraper, dozer, grader, front end loader, hoist, job mechanic, concrete pump truck, hydro excavators GROUP 4: Air tugger (single drum), material hoist, boiler operator, sweeping machine, winch truck, Bobcat and similar equipment, fork truck (over 20 ft. lift), elevators( when operated by an operating engineer GROUP 5: Pump, 6 in. or over; Well points, freeze systems, boom truck (non-swinging); end dumps and laser/power screed; concrete wire saw (20 h.p. and over), brokk concrete breaker GROUP 6: Air compressor, welder, generator, conveyor, pump under 6", grease person and fork truck (20 ft. lifting capacity or less when working on masonry work) GROUP 7: Oiler, fire tender and heater operator ---------------------------------------------------------------- ENGI0325-007 10/01/2007 Rates Fringes Power equipment operators - hazardous waste removal: (Bay, Saginaw, Tuscola, Huron and Sanilac) LEVEL A: Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.47 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.77 15.75 GROUP 1....................$ 29.82 15.75 GROUP 2....................$ 25.42 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 30.79 15.75 LEVEL B AND C: Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.41 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.73 15.75 GROUP 1....................$ 28.87 15.75 GROUP 2....................$ 24.48 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 29.84 15.75 LEVEL D WHEN CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 140' or longer....$ 29.97 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.27 15.75 GROUP 1....................$ 27.32 15.75 GROUP 2....................$ 22.93 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators.....$ 28.29 15.75 LEVEL D: Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.22 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.52 15.75 GROUP 1....................$ 27.57 15.75 GROUP 2....................$ 23.18 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 28.54 15.75 Power equipment operators - hazardous waste removal: (Genesee, Lapeer, St. Clair) LEVEL A: Engineer when operating crane with boom and jib or leads 140' or longer....$ 34.18 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 34.48 15.75 GROUP 1....................$ 31.53 15.75 GROUP 2....................$ 27.30 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 32.50 15.75 LEVEL B AND C: Engineer when operating crane with boom and jib or leads 140' or longer....$ 33.23 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.53 15.75 GROUP 1....................$ 30.58 15.75 GROUP 2....................$ 26.35 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 31.55 15.75 LEVEL D WHEN CAPPING LANDFILL: Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.68 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.98 15.75 GROUP 1....................$ 29.03 15.75 GROUP 2....................$ 24.80 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 29.38 15.75 LEVEL D: Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.93 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.23 15.75 GROUP 1....................$ 29.28 15.75 GROUP 2....................$ 25.05 15.75 Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator....$ 30.25 15.75 HAZARDOUS WASTE REMOVAL CLASSIFICATIONS GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self-propelled or tractor drawn), side boom tractor, slip form paver, slop paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self- propelled), well drilling rig, slope paver and hydro excavator GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon ---------------------------------------------------------------- ENGI0326-004 05/01/2008 Rates Fringes Power equipment operators - gas distribution and duct installation work: MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW and WAYNE COUNTY: GROUP 1....................$ 25.98 16.75 GROUP 2....................$ 25.85 16.75 GROUP 3....................$ 24.72 16.75 GROUP 4....................$ 24.15 16.75 REMAINDER OF COUNTIES: GROUP 1....................$ 25.07 16.75 GROUP 2-A..................$ 24.97 16.75 GROUP 2-B..................$ 24.75 16.75 GROUP 3....................$ 23.97 16.75 GROUP 4....................$ 23.47 16.75 SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work", starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation. POWER EQUIPMENT - GAS DISTRIBUTION CLASSIFICATIONS Macomb, Monroe, Oakland, St.Clair, Washtenaw and Wayne: GROUP 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd. capacity or greater). GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2 yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck (with powered boom), tractor (wheel type other than backhoe or front endloader). GROUP 3: Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day), trencher(service), GROUP 4: Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator. REMAINDER OF COUNTIES: GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe (over 1/2 yd. capacity), grader (Caterpillar 12 equivalent or larger) GROUP 2-A: Trencher(except service), backhoe (1/2 yd. capacity or less) GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or more), dozer (D-4 equivalent or larger), endloader (1 yd. capacity or larger), pump (1 or 2 six-inch or larger), side boom (D-4 equivalent or larger). GROUP 3: Backfiller, boom truck (powered), concrete saw (20 hp or larger), dozer (less than D-4 equivalent), endloader (under 1 yd. capacity), farm tractor (with attachments), pump (2 - 4 under six-inch capacity), side boom tractor (less than D-4 equivalent), tamper (self-propelled), trencher(service) and Grader(maintenance). GROUP 4: Oiler, grease person, hydrostatic testing operator ---------------------------------------------------------------- IRON0025-005 06/01/2007 Rates Fringes Ironworkers: Fence erector...............$ 21.73 19.16 Ornamental, structural, precast erector.............$ 28.93 19.64 Siding & decking (Except St. Clair County)...........$ 24.12 17.76 ---------------------------------------------------------------- IRON0025-008 04/01/2008 Rates Fringes Ironworkers - Pre-Engineered Metal BAY, SAGINAW AND TUSCOLA COUNTIES....................$ 20.13 19.97 GENESEE, LAPEER AND ST. CLAIR COUNTIES..............$ 21.35 20.27 ---------------------------------------------------------------- IRON0025-023 06/01/2007 Rates Fringes Ironworkers: Machinery mover, rigger and machinery erector.......$ 27.64 21.74 ---------------------------------------------------------------- IRON0026-013 06/01/2001 Rates Fringes Ironworkers: Reinforcing.................$ 23.50 15.51 Wire mesh...................$ 19.87 14.24 ---------------------------------------------------------------- LABO0005-012 10/01/2007 Rates Fringes Laborers - hazardous waste abatement: BAY, SAGINAW AND TUSCOLA COUNTIES: Level A, B or C............$ 21.71 9.04 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 20.71 9.04 GENESEE AND LAPEER COUNTIES: Level A, B or C............$ 22.14 9.17 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 21.14 9.17 ST. CLAIR COUNTY: Work performed inside the building and up to and including 5 ft. outside the building: Level A, B or C............$ 25.69 10.52 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 24.69 10.52 ST. CLAIR COUNTY: Work performed over 5 ft. outside the building: Level A, B or C............$ 21.29 8.99 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 20.29 8.99 9.04 ---------------------------------------------------------------- LABO0259-010 08/01/2007 Rates Fringes Asbestos Laborer Includes removing and disposing of all insulation materials from walls, ceilings, floors, columns, and all other non- mechanical surfaces; and removal of insulating materials from mechanical systems that are to be demolished;loading/unloading of bagged and tagged materials at the disposal site (includes lead paint abatement clean-up).........$ 21.48 10.75 ---------------------------------------------------------------- LABO0259-012 09/01/2007 Rates Fringes Laborers - tunnel, shaft and caisson: GROUP 1.....................$ 22.20 9.05 GROUP 2.....................$ 22.29 9.05 GROUP 3.....................$ 22.39 9.05 GROUP 4.....................$ 22.55 9.05 GROUP 5.....................$ 22.81 9.05 GROUP 6.....................$ 23.12 9.05 GROUP 7.....................$ 15.39 9.05 SCOPE OF WORK: Tunnel, shaft and caisson work of every type and descripton and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction. LABORER CLASSIFICATIONS GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas) GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar, material mixer, fence erector and guard rail builder GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.) GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.) GROUP 6: Dynamite and powder GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc. ---------------------------------------------------------------- LABO0334-007 09/01/2007 Rates Fringes Laborers - open cut: BAY, SAGINAW, TUSCOLA COUNTIES: GROUP 1....................$ 19.05 9.05 GROUP 2....................$ 19.18 9.05 GROUP 3....................$ 19.29 9.05 GROUP 4....................$ 19.36 9.05 GROUP 5....................$ 19.48 9.05 GROUP 6....................$ 16.70 9.05 GROUP 7....................$ 15.04 9.05 GENESEE, LAPEER AND ST. CLAIR COUNTIES: GROUP 1....................$ 20.14 9.05 GROUP 2....................$ 20.28 9.05 GROUP 3....................$ 20.40 9.05 GROUP 4....................$ 20.45 9.05 GROUP 5....................$ 20.59 9.05 GROUP 6....................$ 17.89 9.05 GROUP 7....................$ 15.04 9.05 SCOPE OF WORK: Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. Open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work. OPEN CUT LABORER CLASSIFICATIONS GROUP 1: Construction laborer GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, guard rail builder, headwall, seawall, breakwall, dock builder and fence erector GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g. wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person, cement finisher GROUP 4: Trench or excavating grade person GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits) GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work, installation and repair of water service pipe and appurtenances GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc. ---------------------------------------------------------------- LABO0334-017 07/01/2007 Rates Fringes Landscape Laborer ALL COUNTIES, EXCEPT WASHTENAW,,GENESEE, LAPEER, SHIAWASSEE, OAKLAND, WAYNE, MONROE, LIVINGSTON, ST. CLAIR, MACOMB GROUP 1....................$ 18.13 5.30 All COUNTIES, EXCEPT WASHTENAW,,GENESEE, LAPEER, SHIAWASSEE, OAKLAND, WAYNE, MONROE, LIVINGSTON, ST. CLAIR, MACOMB GROUP 2....................$ 13.93 5.30 WASHTENAW,GENESEE, LAPEER, SHIAWASSEE, OAKLAND, WAYNE, MONROE, LIVINGSTON, ST. CLAIR, MACOMB GROUP 2....................$ 14.64 5.30 WASHTENAW,GENESEE, LAPEER,SHIAWASSEE, OAKLAND, WAYNE, MONROE, LIVINGSTON, ST. CLAIR, MACOMB GROUP 1....................$ 18.86 5.30 llllllllllllllllllllllll LANDSCAPE LABORER CLASSIFICATIONS GROUP 1: Landscape specialist, including air, gas and diesel equipment operator and lawn sprinkler installer GROUP 2: Landscape laborer: small power tool operator, material mover,truck driver and lawn sprinkler installer tender ---------------------------------------------------------------- LABO0463-002 06/01/2008 ST. CLAIR COUNTY: Rates Fringes Laborers: Signal man and top man(sewer work); tunnel muckers; jackhammer and air spade operators; tunnel men (concrete shovelers, car pushers); bottom men(sewer work); windlass operators(caisson work); mason tender; demolition laborer, when full time fire watch is required by the contractor signatory to this agreement, the laborers will be utilized to supply fire watch, Industrial deep cleaning; cement finisher tender; carpenter tender; Watchman; Mortar mixer (with training) (by hand or machine); air, electric, gas tool operator; air and electric bush hammer; Plasterer tender; concrete gas; pump operators (all 3" pumps and below); concrete gas buggy; concrete saw operator; crock and pipe layers(conduit and vitrified tile, except 4" drain tile around buildings) and caisson work inside building........$ 24.12 12.00 FOOTNOTES: Height pay: Work on stacks, towers, power houses and silos shall be paid at the rate of pay as follows: 25 ft. to 100 ft.: $.30 per hour above the group 1 rate. For each additional fifty feet (50') height: $.30 additional per hour for each additional fifty foot(50') height. Demolition burner: $1:00 per hour additional ---------------------------------------------------------------- LABO1075-002 06/01/2008 GENESEE AND LAPEER COUNTIES: Rates Fringes Laborers: (Includes carpenter tender; mason tender; cement finisher tender; plasterer tender; signal person and top person (sewer work); air, fuel or electric powered tool operator; crock and pipe layer (conduit and vitrified tile, except 4" drain tile around buildings; caisson worker inside building; tunnel mucker; jackhammer and air spade operator; tunnel person (concrete shoveler, car pusher); bottom person (sewer work); windlass operator (caisson work); watchman; morter mixer; air and electric bush hammers; concrete saw operator; concrete gas buggy; demoition laborer; firewatch; industrial deep cleaning and pump operators(all 3 inch pumps and below)..................$ 22.29 9.96 FOOTNOTE: Demolition burner: $1.00 per hour additional. Height Pay: Height premium pay on all stacks, towers, church spires, power houses and silos shall be paid at the following rate: 25 feet to 100 feet: $.30 above the class A rate. For each additional 50' height: Additional $.30 per hour for each additional 50' height. ---------------------------------------------------------------- LABO1076-006 04/01/2008 Rates Fringes LABORER (Distribution rates) Telephone Work: (Zone 3)....$ 13.27 9.25 Telephone Work: (Zone 4)....$ 13.64 9.25 Telephone Work: (Zone 5)....$ 12.94 9.25 Zone 1: All other work......$ 18.37 9.30 Zone 2: All other work......$ 17.09 9.30 Zone 3: All other work......$ 15.47 9.25 Zone 4: All other work......$ 14.84 9.25 Zone 5: All other work......$ 14.84 9.25 Duct Work Pay: $.40 per hour above the base pay rate. Zones: Zone 1-Macomb,Oakland and Wayne Zone 2-Monroe and Washtenaw Zone 3-Bay ,Genesee,Lapeer,Midland,Saginaw,Sanilac,Shiawassee and St. Clair Zone 4-Alger,Baraga,Chippewa,Delta, Dickinson,Gogebic,Houghton,Iron,Keweenaw,Luce, Mackinaw,Marquette,Menominee,Ontonagon and Schoolcraft Zone 5-Remaining counties in Michiga ---------------------------------------------------------------- LABO1098-009 06/30/2007 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes Laborers: GROUP 1.....................$ 19.70 9.00 GROUP 2.....................$ 20.20 9.00 GROUP 3.....................$ 20.70 9.00 LABORER CLASSIFICATIONS GROUP 1: All construction laborers except workers falling within specified classifications; Also, pumps with a 3-in. or less discharge and not hooked up in battery; mechanized buggy operators & mortar mixer (when done by hand), mason tender, carpenter tender, cement finisher tender, fire watch, mechanized morter mixing, air, electric and gas-driven tools, concrete vibrators, plasterer tenders and plaster mixers, crock and/or pipelayers, signal men and top men on caisson work. Demolition Laborer GROUP 2: Air or electric driven pavement breakers, Tunnel miner, tunnel mucker and tunnel and shaft underpinning contributing to the structural support of buildings and jackhammers over 50 lbs. GROUP 3: Driller & blaster, burner & welder; Also, refractory work: Work inside or outside digesters, tanks, lime kilns, chests, boilers and boiler tubes, heat treat ovens, and smoke stacks, including the handling of acid, chlorine, chemicals, epoxies, liquids and cleaning of existing precipitators, hydro blasting, hydro washing, and sandblasting ---------------------------------------------------------------- PAIN0357-002 06/01/2007 ST. CLAIR COUNTY: Rates Fringes GLAZIER..........................$ 28.45 14.11 PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day; provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work. ---------------------------------------------------------------- PAIN0826-002 12/15/2007 BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes GLAZIER..........................$ 26.78 11.72 PAID HOLIDAYS: New Years Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. FOOTNOTES: High pay: Work from any mechanical lift, regardless of the height off of the surface: $0.75 per hour additional. Working from scaffolding shall be paid at the premium rate only when the working platform is at twenty (20) feet or above. All swing stage work to be paid at the premium rate. Working from a ladder at twenty (20) feet or above qualifies for the premium rate. Premium pay is only to be paid for the actual time worked on the lift device, scaffold, or ladder. ---------------------------------------------------------------- PAIN1052-001 12/01/2007 GENESEE COUNTY; AND LAPEER COUNTY (west of Hwy. M-53): Rates Fringes PAINTER..........................$ 22.35 9.97 FOOTNOTES: Lead abatement work: $1.50 per hour additional. Application of paint by pressure roller: $.80 per hour additional. Sand blasting, steam cleaning, acid cleaning, and all work ordinarily performed as such: $1.00 per hour additional. Swing stage, boatswain chair, window jacks and all work performed over a falling height of 30 ft.: $.30 per hour additional. For each aditional 15 ft. of height: $.10 per hour additional. All industrial spray gun work, pick pullers and those handling needles also for cleaning by blowing off by air pressure: $1.00 per hour additional. Commercial spray rate shall be paid only on deck and truss: $.30 per hour additional. All work such as steeplejack, tanks, gas holders, stacks, flag poles, radio towers and beacons, power line towers, bridges, etc.: $.65 per hour additional, paid from the ground up. Application of paint by use of a mitt: $.35 per hour additional. ---------------------------------------------------------------- PAIN1052-004 12/01/2007 GENESEE COUNTY; AND LAPEER COUNTY (west of Hwy. M-53): Rates Fringes DRYWALL FINISHER/TAPER Drywall sanding.............$ 24.37 9.87 Hand work...................$ 24.77 9.87 Machine work................$ 25.07 9.87 ---------------------------------------------------------------- PAIN1474-004 06/01/2007 LAPEER COUNTY (east of Hwy. M-53); ST. CLAIR AND TUSCOLA COUNTIES: Rates Fringes Painter/Drywall Finisher.........$ 24.00 10.80 FOOTNOTES: Lead abatement work: $1.00 per hour additional. Paperhanging: $1.00 per hour additional.Work with any hazardous material: $1.00 per hour additional.Sandblasting, steam cleaning and acid cleaning: $1.00 per hour additional.Ladder work at or above 40 ft., scaffold work at or above 40 ft., swing stage, boatswain chair, window jacks and all work performed over a falling height of 40 ft.: $1.00 per hour additional.Spray gun work, pick pullers and those handling needles, blowing off by air pressure, and any person rigging (setting up and moving off the groupnd): $1.00 per hour additional.Steeplejack, tanks, gas holders, stacks, flag poles, radio towers and beacons, power line towers, bridges, etc.: $1.00 per hour additonal, paid from the ground up. ---------------------------------------------------------------- * PAIN1803-001 06/01/2008 BAY AND SAGINAW COUNTIES: Rates Fringes Painters: Work performed on water, bridges over water or moving traffic, radio and powerline towers, elevated tanks, steeples, smoke stacks over 40 ft. of falling heights, recovery of lead-based paints and any work associated with industrial plants, except maintenance of industrial plants......................$ 23.20 10.75 All other work, including maintenance of industrial plants......................$ 21.78 10.75 FOOTNOTES: Spray painting, sandblasting, blowdown associated with spraying and blasting, water blasting and work involving a swing stage, boatswain chair or spider: $1.00 per hour additional.All work performed inside tanks, vessels, tank trailers, railroad cars, sewers, smoke stacks, boilers or other spaces having limited egress not including buildings, opentop tanks, pits, etc.: $1.25 per hour additional. Work involving the installation of wallcoverings: $0.30 cents per hour additional. ---------------------------------------------------------------- PAIN1803-009 06/01/2007 BAY AND SAGINAW COUNTIES: Rates Fringes DRYWALL FINISHER/TAPER...........$ 22.25 11.15 ---------------------------------------------------------------- PLAS0016-001 06/01/2008 GENESEE COUNTY: Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 25.94 10.55 PLASTERER........................$ 24.71 10.40 FOOTNOTES: Swing stage: $.50 per hour additional.Gun machine operator: $.50 per hour additional. ---------------------------------------------------------------- PLUM0085-003 05/03/2005 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes Plumbers and Pipefitters Work on housing projects over 4 stories(Includes HVAC work in any building up to $60,000)..............$ 20.65 13.21 All other work..............$ 26.04 15.24 ---------------------------------------------------------------- PLUM0098-003 06/04/2007 ST. CLAIR COUNTY: Rates Fringes PLUMBER..........................$ 35.16 19.65 ---------------------------------------------------------------- PLUM0190-006 05/01/2008 Rates Fringes Gas Distribution Pipeline Welding in conjunction with gas distribution pipeline work...............$ 27.63 15.64 All other work..............$ 20.26 9.90 ---------------------------------------------------------------- PLUM0370-002 06/04/2007 GENESEE AND LAPEER COUNTIES: Rates Fringes Plumbers and Pipefitters.........$ 33.96 18.45 FOOTNOTE: Welding of galvanized material: $1.00 per hour additional. ---------------------------------------------------------------- PLUM0636-004 07/31/2007 ST. CLAIR COUNTY: Rates Fringes PIPEFITTER.......................$ 35.98 19.03 ---------------------------------------------------------------- ROOF0149-004 06/01/2007 BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.71 16.10 Slater...........................$ 25.21 16.10 ---------------------------------------------------------------- ROOF0149-006 05/01/2007 ST. CLAIR COUNTY: Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 21.06 10.55 Slater...........................$ 23.06 10.55 ---------------------------------------------------------------- SFMI0669-001 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 31.46 14.30 ---------------------------------------------------------------- SHEE0007-008 05/01/2006 GENESEE AND LAPEER COUNTIES: Rates Fringes Sheet Metal Worker...............$ 29.45 16.05 ---------------------------------------------------------------- SHEE0007-018 05/01/2006 BAY, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes Sheet Metal Worker...............$ 23.76 15.99 ---------------------------------------------------------------- SHEE0080-001 06/01/2006 ST. CLAIR COUNTY: Rates Fringes Sheet Metal Worker...............$ 32.28 19.51 ---------------------------------------------------------------- TEAM0007-002 06/01/2002 BAY AND SAGINAW COUNTIES: Rates Fringes Truck drivers: Euclids, double bottoms and lowboys.............$ 23.045 .50 + a Trucks under 8 cu. yds......$ 22.795 .50 + a Trucks, 8 cu. yds. and over.$ 22.895 .50 + a FOOTNOTE: a. $265.90 per week. ---------------------------------------------------------------- TEAM0247-002 06/01/2003 ST. CLAIR AND TUSCOLA COUNTIES: Rates Fringes Truck drivers: Pole trailer driver, lowboy driver, straddle carrier, double bottom and special load permit driver, fuel truck driver, bus driver and water truck driver......................$ 26.285 a Truck driver on all trucks except semi trucks or tractor trailers, pole trailers, lowboys, straddle carriers, double bottom, special load permit vehicles and fuel truck driver................$ 26.02 a Truck driver on semi trucks or tractor trailers, except pole trailer driver, lowboy driver, straddle carriers, double bottom, special load permit vehicles and fuel truck driver.......$ 26.18 a PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time. FOOTNOTE: a. $152.25 per week, plus $25.60 per day, plus the following vacation pay: Drivers who have been in the employ of their company for 3 years or less: $0.60 per hour. Drivers who have been in the employ of their company for 4 through 10 years: $1.00 per hour. Drivers who have been in the employ of their company for 11 through 15 years: $1.45 per hour. Drivers who have been in the employ of their company for 16 years and longer: $1.85 per hour. ---------------------------------------------------------------- TEAM0247-009 04/01/2003 Rates Fringes Truck drivers - underground construction: GENESEE AND ST. CLAIR COUNTIES: GROUP 1....................$ 20.57 132.70/wk.+34.0 GROUP 2....................$ 20.71 132.70/wk.+34.0 GROUP 3....................$ 20.90 132.70/wk.+34.0 LAPEER COUNTY: GROUP 1....................$ 20.47 132.70/wk.+34.0 GROUP 2....................$ 20.56 132.70/wk.+34.0 GROUP 3....................$ 20.77 132.70/wk.+34.0 PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. SCOPE OF WORK: Excavation, site preparation, land balancing, grading, sewers, utilities and improvements; also including, but not limited to, tunnels, underground piping, retention, oxidation, flocculation facilities, conduits, general excavation and steel sheeting for underground construction. Underground construction work shall not include any structural modifications, alterations, additions and repairs to buildings or highway work, including roads, streets, bridge construction and parking lots or steel erection. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Truck driver on all trucks (EXCEPT dump trucks of 8 cubic yards capacity or over, pole trailers, semis, low boys, Euclid, double bottom and fuel trucks) GROUP 2: Truck driver on dump trucks of 8 cubic yards capacity or over, pole trailers, semis and fuel trucks GROUP 3: Truck driver on low boy, Euclid and double bottom ---------------------------------------------------------------- TEAM0332-002 06/01/2001 GENESEE AND LAPEER COUNTIES: Rates Fringes TRUCK DRIVER.....................$ 19.11 .22 + 252.70/wk FOOTNOTE: Paid Holidays: New Year's Day, Good Friday afternoon, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day, provided that the worker has 30 days or more of continuous employment with any one contractor, and that the worker works the last scheduled workday before the holiday and the first scheduled workday after the holiday. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION