General Decision Number: MI080003 08/22/2008 MI3 Superseded General Decision Number: MI20070003 State: Michigan Construction Types: Building and Heavy Counties: Alpena, Arenac, Gladwin, Midland, Ogemaw and Presque Isle Counties in Michigan. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS (does not include airport or bridge construction projects, or sewer or water line work if it is incidental to a highway construction project) Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 03/21/2008 4 04/04/2008 5 04/11/2008 6 05/02/2008 7 06/06/2008 8 06/13/2008 9 06/20/2008 10 07/11/2008 11 07/18/2008 12 07/25/2008 13 08/08/2008 14 08/15/2008 15 08/22/2008 ASBE0047-009 07/01/2008 BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES: Rates Fringes Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 27.97 14.81 ---------------------------------------------------------------- BOIL0169-001 07/01/2008 Rates Fringes BOILERMAKER......................$ 31.953 20.869 ---------------------------------------------------------------- BRMI0007-002 07/01/2005 ARENAC, GLADWIN, MIDLAND AND OGEMAW COUNTIES: Rates Fringes Marble, terrazzo and tile finisher.........................$ 15.08 5.57 Marble, terrazzo and tile setter...........................$ 20.50 8.19 ---------------------------------------------------------------- BRMI0009-023 08/01/2005 ARENAC, GLADWIN, MIDLAND AND OGEMAW COUNTIES: Rates Fringes BRICKLAYER.......................$ 23.96 11.61 CEMENT MASON/CONCRETE FINISHER...$ 22.21 10.94 PLASTERER........................$ 23.22 12.01 Tile, Marble & Terrazzo Finisher.........................$ 15.08 5.57 Tile, Marble & Terrazzo Worker...$ 20.50 8.19 FOOTNOTE: Paid Holiday: Fourth of July, if the worker is employed by the contractor in any period of seven working days before said holiday within the current calendar year. ---------------------------------------------------------------- BRMI0010-009 08/01/2007 ALPENA AND PRESQUE ISLE COUNTIES: Rates Fringes Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 23.94 12.05 CEMENT MASON/CONCRETE FINISHER...$ 20.92 11.69 PLASTERER........................$ 23.01 10.12 Terrazzo & Tile Setter...........$ 21.83 6.89 FOOTNOTE: Paid Holiday: Fourth of July, if the worker was employed by the contractor in any period of seven working days before said holiday within the current calendar year. ---------------------------------------------------------------- CARP0202-001 06/01/2008 ALPENA AND PRESQUE ISLE COUNTIES: Rates Fringes Carpenter, Drywall Hanger .................................$ 21.37 10.91 Pile Driver......................$ 22.00 10.93 FOOTNOTE: Welding: $.25 per hour additional. ---------------------------------------------------------------- CARP0706-006 06/01/2008 Rates Fringes CARPENTER (Including drywall hangers).$ 26.55 11.05 ---------------------------------------------------------------- * CARP1045-013 06/01/2008 ALPENA AND PRESQUE ISLE COUNTIES: Rates Fringes LATHER...........................$ 23.69 13.52 ---------------------------------------------------------------- * CARP1045-015 07/17/2008 ARENAC, GLADWIN, MIDLAND AND OGEMAW COUNTIES: Rates Fringes LATHER...........................$ 24.29 13.66 ---------------------------------------------------------------- * CARP1102-002 06/01/2008 ALPENA, OGEMAW AND PRESQUE ISLE COUNTIES: Rates Fringes MILLWRIGHT.......................$ 28.35 27.02 FOOTNOTES: Work on heights over open areas and over fifty (50) ft. high: $.50 per hour additional. Welding: $.50 per hour additional. ---------------------------------------------------------------- * CARP1102-009 06/01/2008 ARENAC, GLADWIN AND MIDLAND COUNTIES: Rates Fringes MILLWRIGHT.......................$ 28.35 27.02 ---------------------------------------------------------------- ELEC0557-003 06/01/2007 MIDLAND COUNTY (Townships of Ingersoll, Jasper, Mt. Haley and Porter): Rates Fringes ELECTRICIAN......................$ 29.92 14.65 FOOTNOTE: High work: Electrical work thirty-five feet (35') (to the work) above the ground or permanent floor, where a hazard exists: 15% per hour additional. ---------------------------------------------------------------- ELEC0692-006 06/03/2007 ALPENA COUNTY; OGEMAW COUNTY (Townships of Foster, Goodar and Rose); AND PRESQUE ISLE COUNTIES: Rates Fringes ELECTRICIAN......................$ 28.54 6.85+25% ---------------------------------------------------------------- ELEC0692-007 06/03/2007 ARENAC AND GLADWIN COUNTIES; MIDLAND COUNTY (except the townships of Ingersoll, Jasper, Mt. Haley and Porter); and OGEMAW COUNTY (except the townships of Foster, Goodar and Rose): Rates Fringes ELECTRICIAN......................$ 28.54 6.85+25% ---------------------------------------------------------------- ELEC0876-005 06/01/2007 Rates Fringes Line Construction: Cable splicer...............$ 32.71 3.75+21.5% Light equipment operator/ground person/truck driver/ground person (winch, A-frame, diggers when used for distribution line truck and used for distribution work. Distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under).............$ 20.70 3.75+21.5% Line technician.............$ 31.41 3.75+21.5% Operator/ground person (digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 23.62 3.75+21.5% Truck driver/ground person (trucks with winch or boom or dump, other than distribution work)..........$ 19.70 3.75+21.5% FOOTNOTE: Operators of 5/8 yd. rated capacity backhoe or over, and operators of 25 ton, rated capacity, crane or over, and operators of heavy duty tension or pulling machinery on 345 KV and above, shall receive the line technician rate of pay. ---------------------------------------------------------------- ELEV0085-003 01/01/2008 Rates Fringes ELEVATOR MECHANIC................$ 40.50 16.285 FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Friday after, and Christmas Day. ---------------------------------------------------------------- ENGI0324-008 10/01/2007 Rates Fringes Power equipment operators - sewer relining: GROUP 1.....................$ 27.05 11.00 GROUP 2.....................$ 25.52 11.00 SEWER RELINING CLASSIFICATIONS GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems ---------------------------------------------------------------- ENGI0324-015 06/01/2008 Rates Fringes Power Equipment Operators - Steel Erection: GROUP 1....................$ 42.07 17.30 GROUP 2....................$ 43.07 17.30 GROUP 3....................$ 40.57 17.30 GROUP 4....................$ 41.57 17.30 GROUP 5....................$ 39.07 17.30 GROUP 6....................$ 40.07 17.30 GROUP 7....................$ 38.80 17.30 GROUP 8....................$ 39.80 17.30 GROUP 9....................$ 38.35 17.30 GROUP 10....................$ 39.35 17.30 GROUP 11....................$ 37.62 17.30 GROUP 12....................$ 38.62 17.30 GROUP 13....................$ 37.26 17.30 GROUP 14....................$ 38.26 17.30 GROUP 15....................$ 36.62 17.30 GROUP 16....................$ 29.81 17.30 GROUP 17....................$ 28.40 17.30 GROUP:18....................$ 35.57 17.30 FOOTNOTE: Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Engineer when operating combination of boom and jib 400' or longer GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler GROUP 3: Engineer when operating combination of boom and jib 300' or longer GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler GROUP 5: Engineer when operating combination of boom and jib 220' or longer GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler GROUP 7: Engineer when operating combination of boom and jib 140' or longer GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler GROUP 9: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level) GROUP 10: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler GROUP 11: Crane operator when operating combination of boom and jib 120' or longer GROUP 12: Crane operator when operating combination of boom and jib 120' or longer on a crane that requires an oiler GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator GROUP 14: Crane operator on a crane that requires an oiler GROUP 15: Hoisting operator; 2 drum hoist and rubber tire backhoe GROUP 16: Compressor or welder operator GROUP 17: Oiler GROUP 18: Forklift and 1 drum hoist ---------------------------------------------------------------- ENGI0324-016 09/01/2007 Rates Fringes Power equipment operators - underground construction: GROUP 1....................$ 27.27 15.75 GROUP 2....................$ 22.38 15.75 GROUP 3....................$ 21.88 15.75 GROUP 4....................$ 21.60 15.75 POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger); Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader; Endloader; Gradall (and similar type machine); Grader; Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro Excavator GROUP 2: Boom truck (power swing type boom); Crusher; Hoist; Pump (1 or more-6-in. discharge or larger-gas or diesel- powered or powered by generator of 300 amperes or more-inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller); Vac Truck GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger); Maintenance person; Pump (2 or more-4-in. up to 6-in. discharge-gas or diesel powered-excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger-gas or diesel powered) GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, or gas diesel powered - excluding submersible pumps); Roller (other than asphalt); Stump remover; Trencher (service); Vibrating compaction equipment, self-propelled (6 ft. wide or over); End dump operator; Sweeper (Wayne type and similar equipment); Water vWagon and extend-a-boom forklift ---------------------------------------------------------------- ENGI0324-017 05/01/2008 Rates Fringes Power equipment operators: GROUP 1.....................$ 28.39 16.75 GROUP 2.....................$ 28.14 16.75 GROUP 3.....................$ 27.04 16.75 GROUP 4.....................$ 22.24 16.75 GROUP 5.....................$ 21.64 16.75 GROUP 6.....................$ 19.19 16.75 GROUP 7.....................$ 17.49 16.75 FOOTNOTES: Certified Crane Operator Premiums: a) Swing Boom Truck Operator over 12 tons-$.50 per hour b) Hydraulic Crane Operator 75 tons and under-$.75 per hour c) Hydraulic Crane Operator over 75 tons-$1.00 per hour d) Lattiee Boom Crane Operator-$1.50 per hour Crane operator with main boom and jib 300' or longer: $1.50 per hour above the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 per hour above the group 1 rate. PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Crane operator with main boom and jib 400', 300', or 220' or longer. Tower crane operator with CCO certification for combined length of mast and boom 220' or longer GROUP 2: Crane operator with main boom and jib 140' or longer, tower cranes (Operators without CCO certification, or less than 220' length), gantry crane, whirley derrick GROUP 3: Regular equipment operator; crane, stiff leg derrick, scraper, dozer, grader, front end loader, hoist, job mechanic, concrete pump truck, hydro excavators GROUP 4: Air tugger (single drum), material hoist, boiler operator, sweeping machine, winch truck, Bobcat and similar equipment, fork truck (over 20 ft. lift), elevators( when operated by an operating engineer GROUP 5: Pump, 6 in. or over; Well points, freeze systems, boom truck (non-swinging); end dumps and laser/power screed; concrete wire saw (20 h.p. and over), brokk concrete breaker GROUP 6: Air compressor, welder, generator, conveyor, pump under 6", grease person and fork truck (20 ft. lifting capacity or less when working on masonry work) GROUP 7: Oiler, fire tender and heater operator ---------------------------------------------------------------- ENGI0325-005 10/01/2007 Rates Fringes Power equipment operators - hazardous waste removal: LEVEL A: GROUP 1....................$ 29.82 15.75 GROUP 2....................$ 25.42 15.75 Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator...................$ 30.79 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.47 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.77 15.75 LEVEL B AND C: Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator...................$ 29.84 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.41 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.73 15.75 GROUP 1....................$ 28.87 15.75 GROUP 2....................$ 24.48 15.75 LEVEL D WHEN CAPPING LANDFILL: Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator...................$ 28.29 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 29.97 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.27 15.75 GROUP 1....................$ 27.32 15.75 GROUP 2....................$ 22.93 15.75 LEVEL D: Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator...................$ 28.54 15.75 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.22 15.75 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.52 15.75 GROUP 1....................$ 27.57 15.75 GROUP 2....................$ 23.18 15.75 HAZARDOUS WASTE REMOVAL CLASSIFICATIONS GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slop paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment (self-propelled), well drilling rig, slope paver and hydro excavator GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.) forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine, water wagon ---------------------------------------------------------------- ENGI0326-001 05/01/2008 Rates Fringes Power equipment operators - gas distribution and duct installation work: GROUP 1.....................$ 25.07 16.75 GROUP 2-A...................$ 24.97 16.75 GROUP 2-B...................$ 24.75 16.75 GROUP 3.....................$ 23.97 16.75 GROUP 4.....................$ 23.47 16.75 SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work," starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation. POWER EQUIPMENT - GAS DISTRIBUTION CLASSIFICATIONS GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe (over 1/2 yd. capacity), grader (Caterpillar 12 equivalent or larger) GROUP 2-A: Trencher(except service), backhoe (1/2 yd. capacity or less) GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or more), dozer (D-4 equivalent or larger), endloader (1 yd. capacity or larger), pump (1 or 2 six-inch or larger), side boom (D-4 equivalent or larger) GROUP 3: Backfiller, boom truck (powered), concrete saw (20 hp or larger), dozer (less than D-4 equivalent), endloader (under 1 yd. capacity), farm tractor (with attachments), pump (2-4 under six-inch capacity), side boom tractor (less than D-4 equivalent), tamper (self-propelled), trencher service and grader(maintenance) GROUP 4: Oiler, grease person, hydrostatic testing operator ---------------------------------------------------------------- IRON0025-010 04/01/2008 Rates Fringes Ironworker - pre-engineered metal building erector...........$ 20.13 19.27 ---------------------------------------------------------------- IRON0025-022 06/01/2008 Rates Fringes Ironworkers: Machinery mover, rigger and machinery erector 27.69......................$ 27.64 27.69 ---------------------------------------------------------------- LABO0005-011 10/01/2007 Rates Fringes Laborers - hazardous waste abatement: ALPENA AND PRESQUE ISLE COUNTIES: Level A, B or C............$ 18.97 8.89 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 17.97 8.89 ARENAC, GLADWIN, MIDLAND AND OGEMAW COUNTIES: Level A, B or C............$ 21.71 9.04 Work performed in conjunction with site preparation not requiring the use of personal protective equipment; Also, Level D..............$ 20.71 9.04 ---------------------------------------------------------------- LABO0259-005 09/01/2007 Rates Fringes Laborers - tunnel, shaft and caisson: GROUP 1.....................$ 22.20 9.05 GROUP 2.....................$ 22.29 9.05 GROUP 3.....................$ 22.39 9.05 GROUP 4.....................$ 22.55 9.05 GROUP 5.....................$ 22.81 9.05 GROUP 6.....................$ 23.12 9.05 GROUP 7.....................$ 15.39 9.05 SCOPE OF WORK: Tunnel, shaft and caisson work of every type and description and all operations incidental thereto, including but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction. TUNNEL LABORER CLASSIFICATIONS GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas) GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar, material mixer, fence erector and guard rail builder GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.) GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.) GROUP 6: Dynamite and powder GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc. ---------------------------------------------------------------- LABO0260-001 08/01/2007 Rates Fringes LABORER: Asbestos Includes removing and disposing of all insulation materials from walls, ceilings, floors, columns, and all other non- mechanical surfaces; and removal of insulating materials from mechanical systems that are to be demolished; loading/unloading of bagged and tagged materials at the disposal site (includes lead paint abatement clean-up).........$ 21.48 10.75 ---------------------------------------------------------------- LABO0334-015 07/01/2008 Rates Fringes Landscape Laborer GROUP 1.....................$ 18.63 5.80 GROUP 2.....................$ 14.43 5.80 LANDSCAPE LABORER CLASSIFICATIONS GROUP 1: Landscape specialist, including air, gas and diesel equipment operator and lawn sprinkler installer GROUP 2: Laborer, small power tool operator, material mover, truck driver and lawn sprinkler installer tender ---------------------------------------------------------------- LABO0334-023 09/01/2007 Rates Fringes Laborers - open cut: GROUP 1.....................$ 19.05 9.05 GROUP 2.....................$ 19.18 9.05 GROUP 3.....................$ 19.29 9.05 GROUP 4.....................$ 19.36 9.05 GROUP 5.....................$ 19.48 9.05 GROUP 6.....................$ 16.70 9.05 GROUP 7.....................$ 15.04 9.05 SCOPE OF WORK: Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtuces, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. Open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work. OPEN CUT LABORER CLASSIFICATIONS GROUP 1: Construction laborer GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, guard rail builder, headwall, seawall, breakwall, dock builder and fence erector GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g. wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking & boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person, cement finisher GROUP 4: Trench or excavating grade person GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits) GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work, instalation and repair of water service pipe and appurtenances GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc. ---------------------------------------------------------------- LABO1076-006 04/01/2008 Rates Fringes LABORER (Distribution rates) Telephone Work: (Zone 3)....$ 13.27 9.25 Telephone Work: (Zone 4)....$ 13.64 9.25 Telephone Work: (Zone 5)....$ 12.94 9.25 Zone 1: All other work......$ 18.37 9.30 Zone 2: All other work......$ 17.09 9.30 Zone 3: All other work......$ 15.47 9.25 Zone 4: All other work......$ 14.84 9.25 Zone 5: All other work......$ 14.84 9.25 Duct Work Pay: $.40 per hour above the base pay rate. Zones: Zone 1-Macomb,Oakland and Wayne Zone 2-Monroe and Washtenaw Zone 3-Bay ,Genesee,Lapeer,Midland,Saginaw,Sanilac,Shiawassee and St. Clair Zone 4-Alger,Baraga,Chippewa,Delta, Dickinson,Gogebic,Houghton,Iron,Keweenaw,Luce, Mackinaw,Marquette,Menominee,Ontonagon and Schoolcraft Zone 5-Remaining counties in Michiga ---------------------------------------------------------------- LABO1098-004 06/30/2008 ARENAC, GLADWIN, MIDLAND AND OGEMAW COUNTIES: Rates Fringes LABORER Group 1.....................$ 19.81 9.75 Group 2.....................$ 20.31 9.75 Group 3.....................$ 20.81 9.75 LABORER CLASSIFICATIONS GROUP 1: All construction laborers except workers falling within specified classifications; Also, pumps with a 3-in. or less discharge and not hooked up in battery, mechanized buggy operator & mortar mixer (when done by hand), mason tender, carpenter tender, cement finisher tender, fire watch, mechanized morter mixing, air, electric and gas-driven tools, concrete vibrators, plasterer tenders and plaster mixers, crock and/or pipelayers, signal men and top men on caisson work, Demolition Laborer. GROUP 2: Air or electric driven pavement breakers, tunnel miner, tunnel mucker and tunnel and shaft underpinning contributing to the structural support of buildings, jackhammers over 50 lbs. GROUP 3: Driller & blaster, burner & welder; Also, refractory work: Work inside or outside digesters, tanks, lime kilns, chests, boilers and boiler tubes, heat treat ovens, and smoke stacks, including the handling of acid, chlorine, chemicals, epoxies, liquids and cleaning of existing precipitators, hydro blasting, hydro washing, and sandblasting ---------------------------------------------------------------- LABO1098-005 05/01/2008 ALPENA AND PRESQUE ISLE COUNTIES: Rates Fringes Laborers: GROUP 1....................$ 16.57 9.30 GROUP 2....................$ 17.57 9.30 LABORER CLASSIFICATIONS GROUP 1: All construction laborers on building and heavy construction work( except those in Group 2), mortar mixer, mason tender, carpenter tender, material mixer (whether done by hand or machine), vibrator operator, operator of concrete mixer, chipping hammer, tamping machine (whether run by air, electric, or gas), sandblaster, operator of motor-driven buggies, plaster mixer, plaster tender, pipe or crock layer, caisson work in buildings, fire watch, heater tender, all three inch (3") pumps and below, demolition laborer furniture mover. and concrete breakers (90 pound hammer or less) GROUP 2: Work inside or outside digester, tanks, lime kilns, chests, boilers, and boiler tubes, including the handling of acid, chlorine, chemicals, epoxies, liquids and cleaning of existing precipitators, hydro blasting, hydro washing, sandblasting ---------------------------------------------------------------- PAIN0826-007 07/01/2008 Rates Fringes GLAZIER..........................$ 27.08 11.98 PAID HOLIDAYS: New Years Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day. FOOTNOTES: High pay: Work from any mechanical lift, regardless of the height off of the surface: $0.75 per hour additional. Working from scaffolding shall be paid at the premium rate only when the working platform is at twenty (20) feet or above. All swing stage work to be paid at the premium rate. Working from a ladder at twenty (20) feet or above qualifies for the premium rate. Premium pay is only to be paid for the actual time worked on the lift device, scaffold, or ladder. ---------------------------------------------------------------- PAIN1803-004 06/01/2008 Rates Fringes Painters: Work performed on water, bridges over water or moving traffic, radio and powerline towers, elevated tanks, steeples, smoke stacks over 40 ft. of falling heights, recovery of lead-based paints and any work associated with industrial plants, except maintenance of industrial plants......................$ 23.20 10.75 All other work, including maintenance of industrial plants......................$ 21.78 10.75 FOOTNOTE: Spray painting, sandblasting, blowdown associated with spraying and blasting, water blasting and work involving a swing stage, boatswain chair or spider: $1.00 per hour additional. All work performed inside tanks, vessels, tank trailers, railroad cars, sewers, smoke stacks, boilers or other spaces having limited egress not including buildings, opentop tanks, pits, etc.: $1.25 per hour additional. Work involving the installation of wallcoverings: $0.30 cents per hour additional. ---------------------------------------------------------------- PAIN1803-008 06/01/2008 Rates Fringes DRYWALL FINISHER/TAPER...........$ 22.79 12.70 ---------------------------------------------------------------- PLUM0085-001 05/05/2008 Rates Fringes Plumbers and Pipefitters.........$ 28.39 16.69 ---------------------------------------------------------------- PLUM0085-008 05/05/2008 Rates Fringes Plumbers and Pipefitters.........$ 21.29 14.22 ---------------------------------------------------------------- PLUM0190-006 05/01/2008 Rates Fringes Gas Distribution Pipeline Welding in conjunction with gas distribution pipeline work...............$ 27.63 15.64 All other work..............$ 20.26 9.90 ---------------------------------------------------------------- ROOF0149-003 05/01/2006 ALPENA AND PRESQUE ISLE COUNTIES: Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 17.50 8.75 Slater...........................$ 19.50 8.75 ---------------------------------------------------------------- ROOF0149-005 06/01/2007 ARENAC, GLADWIN, MIDLAND AND OGEMAW COUNTIES: Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 23.71 16.10 Slater...........................$ 25.21 16.10 ---------------------------------------------------------------- SFMI0669-008 04/01/2008 Rates Fringes SPRINKLER FITTER.................$ 31.46 14.30 ---------------------------------------------------------------- * SHEE0007-009 05/01/2008 Rates Fringes Sheet Metal Worker All other work..............$ 25.02 16.96 ---------------------------------------------------------------- TEAM0007-007 06/01/2002 Rates Fringes Truck drivers: Euclids, double bottoms and lowboys.............$ 23.045 .50 + a Trucks under 8 cu. yds......$ 22.795 .50 + a Trucks, 8 cu. yds. and over.$ 22.895 .50 + a FOOTNOTE: a. $265.90 per week. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION