General Decision Number: LA080012 02/08/2008 LA12 Superseded General Decision Number: LA20070033 State: Louisiana Construction Types: Highway Counties: Allen, Assumption, Avoyelles, Beauregard, Bienville, Caldwell, Cameron, Catahoula, Claiborne, Concordia, De Soto, East Carroll, East Feliciana, Evangeline, Franklin, Grant, Iberia, Iberville, Jackson, Jefferson Davis, La Salle, Lincoln, Madison, Morehouse, Natchitoches, Pointe Coupee, Red River, Richland, Sabine, St Helena, St Mary, Tangipahoa, Tensas, Union, Vermilion, Vernon, Washington, West Carroll, West Feliciana and Winn Counties in Louisiana. HIGHWAY CONSTRUCTION PROJECTS (does not include building structures in rest area projects) Modification Number Publication Date 0 02/08/2008 SULA2004-016 08/03/2004 Rates Fringes Carpenter (including formbuilding/formsetting)......$ 11.55 1.85 Cement Mason/Concrete Finisher.$ 11.26 Electrician (including traffic signal wiring and installation)..................$ 12.00 Ironworker, Reinforcing .......$ 10.69 Laborers Asphalt Raker...............$ 8.12 General including landscape/erosion...........$ 8.07 Guardrail...................$ 8.22 Mason Tender................$ 8.46 Pipelayer...................$ 8.19 Striping/Pavement Marker including paint striping and attachment of reflector buttons...........$ 7.91 Traffic Control including flagger, sign placement, barricades, and cones.......$ 7.95 Piledriverman..................$ 11.87 Power Equipment Operators Asphalt Distributor.........$ 8.84 Asphalt Paving Machine......$ 12.23 Asphalt Screed..............$ 10.50 Asphalt/Aggregate Spreader..$ 10.11 Backhoe/Excavator...........$ 10.96 Bobcat/Skid Loader..........$ 10.33 Broom Sweeper...............$ 8.70 Bulldozer...................$ 11.87 Concrete Saw................$ 12.46 Crane.......................$ 13.63 Front End Loader............$ 9.62 Grade Checker...............$ 9.00 Mechanic....................$ 13.67 Milling/Cold Planing Machine including rotomill and CMI cutter..............$ 11.65 Motor Grader/Blade..........$ 11.23 MTV/Shuttlebuggy............$ 10.14 Oiler.......................$ 10.20 Post Driver including guardrails..................$ 12.21 Roller......................$ 9.68 Scraper.....................$ 10.93 Stabilizer..................$ 9.85 Trackhoe....................$ 11.92 Tractor.....................$ 9.49 Truck drivers Dump (all types)............$ 8.56 Flatbed.....................$ 9.86 Lowboy......................$ 11.02 Pickup including paint truck$ 9.30 Tack........................$ 9.61 Trailer.....................$ 10.00 Water.......................$ 9.27 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION