General Decision Number: ID120014 01/13/2012 ID14 Superseded General Decision Number: ID20100014 State: Idaho Construction Type: Highway Counties: Ada, Boise, Canyon, Gem and Owyhee Counties in Idaho. Modification Number Publication Date 0 01/06/2012 1 01/13/2012 CARP0808-006 01/01/2011 Ada, Boise, Canyon, Gem and Owyhee Counties Rates Fringes CARPENTER........................$ 26.57 10.24 ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. ---------------------------------------------------------------- * ELEC0291-008 12/01/2011 Ada, Boise, Canyon, Gem and Owyhee Counties Rates Fringes Cable Splicer Ada and Canyon County.......$ 29.37 5%+10.76 Boise and Gem County........$ 29.37 5%+10.76 Owyhee County...............$ 29.37 5%+10.76 ELECTRICIAN Ada and Canyon County.......$ 26.70 5%+10.76 Boise and Gem County........$ 26.70 5%+10.76 Owyhee County...............$ 26.70 5%+10.76 ---------------------------------------------------------------- SUID2006-002 05/25/2006 Rates Fringes Cement Mason/Concrete Finisher (Includes but not limited to hand chipping and patching, all types of grouting and pointing of all concrete constructions, screed setting including screed pins, dry packing of all concrete, plugging and filling of voids, concrete construction, waterproofing of concrete.)....................$ 16.00 5.41 Laborers: (Common)...............$ 14.02 4.66 Laborers: (Concrete laborer (Includes shoveling, wheel barrow work, and clean-up and excludes all finish work using float, trowel, and other tools))....................$ 15.50 5.41 Laborers: (Fence Erector)........$ 19.84 8.76 Laborers: (Grade Checker)........$ 13.42 3.86 Laborers: (Guardrail Installation (Excludes the installation of post, but includes the bolting of rail to post))........................$ 19.84 8.76 Laborers: (Pavement Marking & Highway Striping Laborer (Includes loading/unloading paint and beads, equipment cleaning, equipment maintenance))....................$ 26.03 0.00 Painter: (Traffic Control Striper (Striping Equipment Operator)).......................$ 27.50 0.00 Painters:........................$ 21.00 0.00 POWER EQUIPMENT OPERATOR: (Asphalt Paver (Self Propelled))......................$ 16.85 3.86 POWER EQUIPMENT OPERATOR: (Asphalt Plant Operator).........$ 17.00 4.25 POWER EQUIPMENT OPERATOR: (Asphalt Roller).................$ 14.44 3.86 POWER EQUIPMENT OPERATOR: (Backhoe-Over 3/4 CY)............$ 15.79 3.86 POWER EQUIPMENT OPERATOR: (Backhoe-Under 3/4 CY)...........$ 21.75 6.97 POWER EQUIPMENT OPERATOR: (Blade Operator/Motor Patrol)....$ 14.89 3.86 POWER EQUIPMENT OPERATOR: (Broom)..........................$ 19.58 5.65 POWER EQUIPMENT OPERATOR: (Concrete Breaker)...............$ 22.13 7.22 POWER EQUIPMENT OPERATOR: (Concrete Slipform Operator).....$ 16.00 5.41 POWER EQUIPMENT OPERATOR: (Crane (Over 50 Ton))............$ 24.40 5.97 POWER EQUIPMENT OPERATOR: (Dragline-Under 3/4 CY)..........$ 21.75 6.97 POWER EQUIPMENT OPERATOR: (Excavator, Track (Over 3/4 CY)).............................$ 15.79 3.86 POWER EQUIPMENT OPERATOR: (Grade Roller (Including Sheepsfoot)).....................$ 13.63 3.86 POWER EQUIPMENT OPERATOR: (Guardrail Equipment Operator (Includes Punch, Auger and Combination))....................$ 21.75 9.73 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead-Over 4 CY and Including 7 CY)..................$ 21.93 4.48 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead-Over 7 CY)..............$ 13.97 3.86 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead-Up to and including 4 CY)............................$ 15.17 3.86 POWER EQUIPMENT OPERATOR: (Mechanic, Heavy Duty)...........$ 16.50 5.41 POWER EQUIPMENT OPERATOR: (Scraper Operator)...............$ 17.27 3.86 POWER EQUIPMENT OPERATOR: (Screed Operator)................$ 17.01 4.55 POWER EQUIPMENT OPERATOR: (Service Oiler)..................$ 18.46 5.85 POWER EQUIPMENT OPERATOR: (Tractor, Rubber Tired-Farm Type)............................$ 20.90 4.48 POWER EQUIPMENT OPERATOR: (Tractor, Rubber Tired-Using Backhoe).........................$ 16.05 3.86 POWER EQUIPMENT OPERATOR: (Welder).........................$ 16.00 5.41 Truck drivers: (Dump Truck-Side, End and Bottom (16-32 CY inclusive))............$ 13.00 3.45 Truck drivers: (Dump Truck-Side, End and Bottom and Concrete Mixer (0-16 CY inclusive))......................$ 21.30 0.00 Truck drivers: (Flat Bed, Low Boy, Truck-Hauling Equipment Trailer (40,000 GVW to 106,000 GVW))....................$ 13.81 4.11 Truck drivers: (Pick-UP, Service, Dry Van, Flat Bed and Other (Less than 40,000 GVW))............................$ 18.72 10.52 Truck drivers: (Tank Truck including Water, Fuel, Oil Distributor, Dry Cement (40,000 GVW to 106,000 GVW)).....$ 18.72 9.30 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION