General Decision Number: ID120013 02/03/2012 ID13 Superseded General Decision Number: ID20100013 State: Idaho Construction Type: Highway Counties: Bannock, Franklin and Power Counties in Idaho. Modification Number Publication Date 0 01/06/2012 1 02/03/2012 CARP0808-005 01/01/2011 Bannock, Franklin and Power Counties Rates Fringes Carpenter.......................$ 26.57 10.24 ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR If a project is located in more than one zone the lower zone rate shall apply ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. ---------------------------------------------------------------- * IRON0732-006 06/01/2011 Bannock, Franklin and Power Counties Rates Fringes Ironworkers: (Rebar/Reinforcing)..............$ 26.00 16.00 ---------------------------------------------------------------- PAIN0764-002 06/01/2010 Bannock, Franklin and Power Counties Rates Fringes Painter: (Traffic Control Striper).........................$ 26.18 6.87 ---------------------------------------------------------------- SUID2006-001 05/24/2006 Rates Fringes Electrician......................$ 23.26 10.50 LABORER: Fence Erector..........$ 20.09 8.76 LABORER: Grade Checker..........$ 19.38 6.45 LABORER: Guard Rail Installer (Excludes the installation of post, but includes the bolting of rail to post).........................$ 20.09 8.76 Laborer: Asphalt Raker...........$ 19.38 7.65 Laborers: (Common)...............$ 19.18 7.65 Laborers: (Jackhammer)...........$ 19.18 7.65 POWER EQUIPMENT OPERATOR: (Asphalt Paver (self Propelled))......................$ 22.47 7.22 POWER EQUIPMENT OPERATOR: (Asphalt Roller).................$ 22.30 7.22 POWER EQUIPMENT OPERATOR: (Backhoe-Over 3/4 CY)............$ 22.05 7.47 POWER EQUIPMENT OPERATOR: (Backhoe-Under 3/4 CY)...........$ 22.84 7.22 POWER EQUIPMENT OPERATOR: (Broom)..........................$ 22.80 7.47 POWER EQUIPMENT OPERATOR: (Bulldozer (When Remote Grade Control Device is Used)).........$ 22.84 7.22 POWER EQUIPMENT OPERATOR: (Concrete Road Paver)............$ 21.67 7.22 POWER EQUIPMENT OPERATOR: (Dragline (Under 3/4 CY))........$ 22.84 7.22 POWER EQUIPMENT OPERATOR: (Forklift (Under 20 FT)).........$ 23.32 8.31 POWER EQUIPMENT OPERATOR: (Grade Roller (Including Sheepsfoot)).....................$ 22.30 7.22 POWER EQUIPMENT OPERATOR: (Guardrail Equipment Operator (Includes Punch, Auger and Combination))....................$ 23.80 10.59 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead (Over 4 CY and Including 7 CY)).............................$ 22.13 7.22 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead (Over 7 CY)).....................$ 22.59 7.47 POWER EQUIPMENT OPERATOR: (Loader, Front End & Overhead (Up to and including 4 CY))......$ 21.33 7.22 POWER EQUIPMENT OPERATOR: (Screed Operator)................$ 22.30 7.22 POWER EQUIPMENT OPERATOR: (Service Oiler)..................$ 22.30 7.22 POWER EQUIPMENT OPERATOR: (Tractor, Rubber Tired Using Backhoe).........................$ 22.30 7.22 Truck drivers: (Flat Bed, Low Boy, Truck-Hauling Equipment Trailer (40,000 GVW to 106,000 GVW))....................$ 20.06 9.70 Truck drivers: (Tank Truck including Water, Fuel, Oil Distributor, Dry Cement (40,000 GVW to 106,000 GVW)).....$ 19.80 9.10 Truck drivers: (Trucks, 106,000 GVW or Above)............$ 19.80 9.10 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. Non-Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION