General Decision Number: ID080001 08/29/2008 ID1 Superseded General Decision Number: ID20070002 State: Idaho Construction Type: Building Counties: Benewah, Bonner, Boundary, Clearwater, Idaho, Kootenai, Latah, Lewis, Nez Perce and Shoshone Counties in Idaho. * IDAHO COUNTY - North OF THE 46TH PARALLEL BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 03/07/2008 2 05/16/2008 3 06/06/2008 4 06/27/2008 5 07/11/2008 6 08/08/2008 7 08/29/2008 BOIL0242-006 10/01/2007 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes BOILERMAKER......................$ 31.56 19.01 ---------------------------------------------------------------- * BRIC0003-001 06/01/2008 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes Bricklayer, Stone Mason, Marble Mason, Cement Blocklayer, pointer-Cleaner-Caulke...........$ 26.56 10.96 ---------------------------------------------------------------- ELEC0073-008 07/01/2008 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes Cable Splicer....................$ 27.32 3%+12.48 ELECTRICIAN......................$ 26.92 3%+12.48 ---------------------------------------------------------------- IRON0014-003 07/01/2007 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE Rates Fringes Ironworker, Rebar................$ 28.22 15.52 IRONWORKER, STRUCTURAL...........$ 28.22 15.52 ---------------------------------------------------------------- LABO0238-011 06/01/2008 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES ZONE 1 Rates Fringes Laborer: General/Cleanup.........$ 22.66 7.70 Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office ---------------------------------------------------------------- LABO0238-012 06/01/2008 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes Hod Carrier......................$ 24.10 7.70 ---------------------------------------------------------------- * PAIN0005-009 07/01/2008 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes Painters: Brush, Roller, Paperhanger, Striping, Steam-Cleaning and Spray.........$ 15.09 6.68 *$.70 shall be paid over and above the basic wage rates listed for work on swing stages and high work over 30 feet ---------------------------------------------------------------- PAIN0054-009 06/01/2008 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEX PERCE AND SHOSHONE COUNTIES Rates Fringes Drywall taper/finisher...........$ 22.78 8.88 ---------------------------------------------------------------- PLUM0044-005 06/01/2007 BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes PIPEFITTER BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH PARALLEL), KOOTENAI, LATAH, LEWIS AND SHOSHONE COUNTIES...........$ 30.14 12.81 NEZ PERCE COUNTY............$ 30.14 12.81 ---------------------------------------------------------------- SHEE0066-011 06/01/2007 BENEWAH, BONNER, BOUNDARY, CLEARWATER, KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES Rates Fringes Sheet metal worker (INCLUDING HVAC DUCT WORK)..................$ 25.45 13.44 ---------------------------------------------------------------- SHEE0213-004 01/01/2008 IDAHO (NORTH OF THE 46TH PARALLEL) COUNTY Rates Fringes Sheet metal worker (INCLUDING HVAC DUCT WORK)..................$ 23.41 11.74 ---------------------------------------------------------------- SUID2003-002 09/03/2003 Rates Fringes CARPENTER Including concrete form work, drywall hanging and metal stud work.............$ 18.13 4.39 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION