General Decision Number: CT100018 07/30/2010 CT18 Superseded General Decision Number: CT20080018 State: Connecticut Construction Type: Heavy County: New Haven County in Connecticut. HEAVY CONSTRUCTION PROJECTS Modification Number Publication Date 0 03/12/2010 1 04/30/2010 2 05/07/2010 3 06/04/2010 4 07/02/2010 5 07/23/2010 6 07/30/2010 BRCT0001-011 04/05/2010 Rates Fringes BRICKLAYER.......................$ 32.43 20.54 ---------------------------------------------------------------- BRCT0001-012 04/05/2010 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 32.43 20.54 ---------------------------------------------------------------- CARP0024-015 05/02/2010 Beacon Falls, Bethany, Branford, Cheshire, East Haven, Guilford, Hamden, Madison, Meriden, Middlebury, Naugatuck, New Haven, North Branford, North Haven, Orange (east of Orange Center Road and north of Route 1, and north of Route 1 and east of the Oyster River), Prospect, Southbury, Wallingford, Waterbury, West Haven, Wolcott, Woodbridge Rates Fringes CARPENTER........................$ 29.03 18.57 ---------------------------------------------------------------- CARP0210-006 05/02/2010 Ansonia, Derby, Milford, Orange (West of Orange Center Road and South of Route 1 and West of the Oyster River), Oxford, Seymour Rates Fringes CARPENTER........................$ 29.03 18.57 ---------------------------------------------------------------- ELEC0090-004 06/01/2010 Entire County excluding Beacon Falls, Middlebury, Milford, Naugatuck, Oxford, Prospect, Seymour, Southbury, Waterbury and Wolcott Townships Rates Fringes ELECTRICIAN......................$ 35.20 20.51 ---------------------------------------------------------------- ELEC0488-007 06/01/2010 Beacon Falls, Middlebury, Milford, Naugatuck, Oxford, Prospect, Seymour, Southbury, Waterbury and Wolcott Townships Rates Fringes ELECTRICIAN......................$ 34.80 21.05 ---------------------------------------------------------------- ENGI0478-011 04/05/2010 Rates Fringes POWER EQUIPMENT OPERATOR: Asphalt Paver...............$ 33.01 18.60+a Asphalt Roller..............$ 32.36 18.60+a Asphalt Spreader............$ 33.01 18.60+a Backhoe/Excavator 2 cubic yards and over..............$ 34.73 18.60+a Backhoe/Excavator under 2 cubic yards.................$ 33.99 18.60+a Crane handling or erecting structural steel or stone...$ 35.05 18.60+a Cranes (100 ton capacity & over).......................$ 34.73 18.60+a Cranes (under 100 ton rated capacity).............$ 33.99 18.60+a Drills with self contained power units; Directional driller.....................$ 33.01 18.60+a Earth Roller................$ 29.49 18.60+a Forklift....................$ 31.53 18.60+a Front End Loader (3 cubic yards up to 7 cubic yards)..$ 32.70 18.60+a Front End Loader (7 cubic yards or over)..............$ 35.05 18.60+a Front End Loader (under 3 cubic yards)................$ 31.53 18.60+a Grader/Blade................$ 33.99 18.60+a Maintenance Engineer/Oiler..$ 26.65 18.60+a Mechanic....................$ 31.96 18.60+a Rubber Tire Backhoe/Excavator...........$ 33.99 18.60+a a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday. b. Crane with boom, including jib, 150 feet - $1.50 extra . Crane with boom, including jib, 200 feet- $2.50 extra. Crane with boom, including jib, 250 feet - $5.00 extra. Crane with boom, including jib, 300 feet - $7.00 extra. Crane with boom, including jib, 400 feet - $10.00 extra. ---------------------------------------------------------------- IRON0015-005 06/28/2010 Rates Fringes IRONWORKER, REINFORCING..........$ 33.00 26.58+a a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day. ---------------------------------------------------------------- LABO0056-005 04/04/2010 Rates Fringes LABORERS GROUP 1.....................$ 25.00 15.00 GROUP 2.....................$ 25.25 15.00 GROUP 3.....................$ 25.50 15.00 GROUP 4.....................$ 26.00 15.00 GROUP 5.....................$ 26.75 15.00 GROUP 6.....................$ 27.00 15.00 GROUP 7.....................$ 16.00 15.00 LABORERS CLASSIFICATIONS GROUP 1: Laborers (Unskilled), acetylene burner, concrete specialist GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen. GROUP 3: Pipelayers, Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block paver and curb setter GROUP 4: Asbestos/lead removal GROUP 5: Blasters GROUP 6: Toxic waste remover GROUP 7: Traffic control signalman ---------------------------------------------------------------- * PAIN0011-013 06/01/2010 Rates Fringes PAINTER Brush and Roller............$ 28.47 15.40 Spray Only..................$ 31.47 15.40 Steel Only..................$ 30.47 15.40 ---------------------------------------------------------------- SUCT2002-011 12/16/2008 Rates Fringes IRONWORKER, STRUCTURAL...........$ 24.85 13.83 OPERATOR: Bulldozer.............$ 25.33 9.64 ---------------------------------------------------------------- TEAM0064-006 04/04/2010 Rates Fringes TRUCK DRIVER: 4 Axle Truck......$ 28.08 14.53+a ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION