General Decision Number: CT080001 08/22/2008 CT1 Superseded General Decision Number: CT20070001 State: Connecticut Construction Types: Building, Heavy and Highway Counties: Fairfield, Litchfield, Middlesex, New Haven, Tolland and Windham Counties in Connecticut. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 04/04/2008 3 04/11/2008 4 05/02/2008 5 05/09/2008 6 05/23/2008 7 06/06/2008 8 06/13/2008 9 06/20/2008 10 07/04/2008 11 07/18/2008 12 08/01/2008 13 08/22/2008 ASBE0006-007 09/01/2007 Rates Fringes Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls. LITCHFIELD COUNTY Canaan, Colebrook, Norfolk, North Canaan, Salisbury TOLLAND COUNTY Somers, Stafford, Union WINDHAM COUNTY Woodstock...................$ 29.49 18.03 ---------------------------------------------------------------- ASBE0033-002 06/01/2008 Rates Fringes Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls. FAIRFIELD COUNTY LITCHFIELD COUNTY Barkhamsted, Bethlehem, Bridgewater, Cornwall, Goshen, Harwington, Kent, Litchfield, Morris, New Hartford, New Milford, Plymouth, Roxbury, Sharon, Thomaston, Torrington, Warren, Washington, Watertown, Woodbury, Winchester MIDDLESEX AND NEW HAVEN COUNTIES TOLLAND COUNTY Andover, Boton, Columbia, Coventry, Ellington, Hebron, Mansfield, Tolland, Vernon, Willington WINDHAM COUNTY All townships excluding Woodstock...................$ 34.21 19.81 ---------------------------------------------------------------- ASBE0201-003 04/01/2005 Rates Fringes HAZARDOUS MATERIAL HANDLER Includes preparation, wetting, stripping, removal, scrapping,vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems..........$ 20.50 10.30 ---------------------------------------------------------------- BOIL0237-001 10/01/2007 Rates Fringes BOILERMAKERS.....................$ 32.73 33%+8.72 ---------------------------------------------------------------- BRCT0001-002 04/07/2008 Rates Fringes BRICKLAYER (BUILDING CONSTRUCTION) BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS Darien, Greenwich, New Canaan, Norwalk, Redding, Ridgefield, Stamford, Westport, Weston and Wilton (ZONE B).............$ 31.00 19.57+a a. PAID HOLIDAY: Employees shall receive 4 hours for Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay. ---------------------------------------------------------------- BRCT0001-004 04/07/2008 Rates Fringes BRICKLAYER (HEAVY & HIGHWAY CONSTRUCTION) BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS AND STONE MASONS.$ 31.00 17.89 ---------------------------------------------------------------- BRCT0001-005 04/07/2008 Rates Fringes BRICKLAYER (BUILDING CONSTRUCTION) Remainder of Area (ZONE A)..$ 31.00 18.54+a a. PAID HOLIDAY: Employees shall receive 4 hours for Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay. ---------------------------------------------------------------- BRCT0001-008 04/01/2008 Rates Fringes TILE SETTER......................$ 30.21 16.61 ---------------------------------------------------------------- BRCT0001-009 04/01/2008 Rates Fringes Marble Setter, Terrazzo Worker...$ 30.30 18.69 ---------------------------------------------------------------- BRCT0001-010 04/01/2008 Rates Fringes Tile, Marble & Terrazzo Finisher.........................$ 24.50 14.43 ---------------------------------------------------------------- CARP0024-004 05/05/2008 Rates Fringes Carpenters: (BUILDING CONSTRUCTION) LITCHFIELD COUNTY Harwinton, Plymouth, Thomaston, Watertown MIDDLESEX COUNTY NEW HAVEN COUNTY Beacon Falls, Bethany, Branford, Cheshire, East Haven, Guilford, Hamden, Madison, Meriden, Middlebury, Naugatuck, New Haven, North Branford, North Haven, Orange (east of Orange Center Road and north of Route 1, and north of Route 1 and east of the Oyster River), Prospect, Southbury, Wallingford, Waterbury, West Haven, Wolcott, Woodbridge TOLLAND COUNTY Andover, Columbia, Coventry, Hebron, Mansfield, Union, Willington WINDHAM COUNTY Carpenters, Drywall, Lathers, Floorlayers, Piledrivers.................$ 27.90 16.96 Millwrights.................$ 28.65 16.96 ---------------------------------------------------------------- CARP0024-006 05/05/2008 LITCHFIELD COUNTY Harwinton, Plymouth, Thomaston, Watertown MIDDLESEX COUNTY NEW HAVEN COUNTY Beacon Falls, Bethany, Branford, Cheshire, East Haven, Guilford, Hamden. Madison, Meriden, Middlebury, Naugatuck, New Haven, North Branford, North Haven, Orange (east of Orange Center Road and north of Route 1, and north of Route 1 and east of the Oyster River), Prospect, Southbury, Wallingford, Waterbury, West Haven, Wolcott, Woodbridge TOLLAND COUNTY Andover, Columbia, Coventry, Hebron, Mansfield, Union, Willington WINDHAM COUNTY Rates Fringes Carpenters: (HEAVY & HIGHWAY CONSTRUCTION) Carpenters, Piledrivers.....$ 27.90 16.96 Diver Tenders...............$ 27.90 16.96 Divers......................$ 36.36 16.96 ---------------------------------------------------------------- CARP0043-002 05/05/2008 Rates Fringes Carpenters: (BUILDING CONSTRUCTION) CARPENTERS, LATHERS, PILEDRIVERS, RESILIENT FLOOR LAYERS................$ 27.90 16.96 MILLWRIGHTS.................$ 28.65 16.96 TOLLAND COUNTY Bolton, Ellington, Somers, Tolland, Vernon ---------------------------------------------------------------- CARP0043-004 05/05/2008 Rates Fringes Carpenters: (HEAVY & HIGHWAY CONSTRUCTION: TOLLAND COUNTY Bolton, Ellington, Somers, Tolland, Vernon) CARPENTERS, PILEDRIVERS.....$ 27.90 16.96 DIVER TENDERS...............$ 27.90 16.96 DIVERS......................$ 36.36 16.96 ---------------------------------------------------------------- CARP0210-001 05/05/2008 Rates Fringes Carpenters: (CARPENTERS, LATHERS, MILLWRIGHTS, PILEDRIVERS, RESILIENT FLOOR LAYERS (BUILDING CONSTRUCTION)) CARPENTERS, LATHERS, FLOORLAYERS AND PILEDRIVERS.$ 27.90 16.96 MILLWRIGHTS.................$ 28.65 16.96 FAIRFIELD COUNTY Bethel, Bridgeport, Brookfield, Danbury, Darien, Easton, Fairfield, Greenwich, Monroe, New Canaan, New Fairfield, Newtown, Norwalk, Redding, Ridgefield, Shelton, Sherman, Stamford, Stratford, Trumbull, Weston, Westport, Wilton; LITCHFIELD COUNTY Barkhamstead, Bethlehem, Bridgewater, Canaan, Colebrook, Cornwall, Goshen, Kent, Litchfield, Morris, New Hartford, New Milford, Norfolk, North Canaan, Roxbury, Salisbury, Sharon, Torrington, Warren, Washington, Winchester, Woodbury; NEW HAVEN Ansonia, Derby, Milford, Orange (west of Orange Center Road and south of Route 1 and west of the Oyster River), Oxford, Seymour; ---------------------------------------------------------------- CARP0210-002 05/05/2008 Rates Fringes Carpenters: (HEAVY & HIGHWAY CONSTRUCTION) CARPENTERS, PILEDRIVERS.....$ 27.90 16.96 DIVER TENDERS...............$ 27.90 16.96 DIVERS......................$ 36.36 16.96 FAIRFIELD COUNTY Bethel, Bridgeport, Brookfield, Danbury, Darien, Easton, Fairfield, Greenwich, Monroe, New Canaan, New Fairfield, Newtown, Norwalk, Redding, Ridgefield, Shelton, Sherman, Stamford, Stratford, Trumbull, Weston, Westport, Wilton; LITCHFIELD COUNTY Barkhamstead, Bethlehem, Bridgewater, Canaan, Colebrook, Cornwall, Goshen, Kent, Litchfield, Morris, New Hartford, New Milford, Norfolk, North Canaan, Roxbury, Salisbury, Sharon, Torrington, Warren, Washington, Winchester, Woodbury; NEW HAVEN COUNTY Ansonia, Derby, Milford, Orange (west of Orange Center Road and south of Route 1 and west of the Oyster River), Oxford, Seymour; ---------------------------------------------------------------- ELEC0003-002 05/08/2008 Rates Fringes Electricians (Including Teledata) FAIRFIELD COUNTY Darien, Greenwich, New Canaan, Stamford............$ 44.75 30.42 ---------------------------------------------------------------- ELEC0035-001 06/01/2008 Rates Fringes Electricians: MIDDLESEX COUNTY (Cromwell, Middlefield, Middleton and Portland); TOLLAND COUNTY; WINDHAM COUNTY......................$ 34.40 18.57 ---------------------------------------------------------------- ELEC0042-001 08/28/2005 Rates Fringes Line Construction: (Line Construction) Driver Groundmen............$ 25.99 10.70+6.25% Groundmen...................$ 19.06 10.70+6.25% Heavy Equipment Operators...$ 31.19 10.70+6.25% Linemen, Cable Splicers, Dynamite Men................$ 34.65 10.70+6.25% Material Men, Tractor Trailer Drivers, Equipment Operators...................$ 29.45 10.70+6.25% Line Construction: (Railroad Construction and Maintenance) Driver Groundmen............$ 26.74 10.70+6.25% Heavy Equipment Operators...$ 32.09 10.70+6.25% Linemen, Cable Splicers, Dynamite Men................$ 35.65 10.70+6.25% Material Men, Tractor Trailer Drivers, Equipment Operators.........$ 30.30 10.70+6.25% ---------------------------------------------------------------- ELEC0090-002 06/01/2008 Rates Fringes Electricians:....................$ 34.20 18.33 LITCHFIELD COUNTY Plymouth Township; MIIDDLESEX COUNTY Chester, Clinton, Deep River, Durham, East Haddam, East Hampton, Essex, Haddam, Killingworth, Old Saybrook, Westbrook; NEW HAVEN COUNTY All Townships excluding Beacon Falls, Middlebury,Milford, Naugatuck, Oxford, Prospect, Seymour, Southbury, Waterbury and Wolcott. ---------------------------------------------------------------- ELEC0208-001 06/01/2008 Rates Fringes Electricians: FAIRFIELD COUNTY Norwalk (Remainder of Area), Weston, Westport, Wilton......................$ 34.15 17.77 ---------------------------------------------------------------- ELEC0488-002 06/01/2008 Rates Fringes Electricians.....................$ 34.10 18.58 FAIRFIELD COUNTY Bethel, Bridgeport, Brookfield, Danbury, Easton, Fairfield, Monroe, New Fairfield, Newtown, Redding, Ridgefield, Shelton, Sherman, Stratford, Trumbull; LITCHFIELD COUNTY Except Plymouth; NEW HAVEN COUNTY Beacon Falls, Middlebury, Milford, Naugatuck, Oxford, Prospect, Seymour, Southbury, Waterbury and Wolcott ---------------------------------------------------------------- ELEV0091-001 01/01/2008 Rates Fringes ELEVATOR MECHANIC................$ 41.34 16.285+a+b a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day, plus the Friday after Thanksgiving. b. VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit. ---------------------------------------------------------------- ENGI0478-001 04/06/2008 Rates Fringes Power equipment operators: GROUP 1....................$ 33.05 16.90+a GROUP 2....................$ 32.73 16.90+a GROUP 3....................$ 31.99 16.90+a GROUP 4....................$ 31.60 16.90+a GROUP 5....................$ 31.01 16.90+a GROUP 6....................$ 30.70 16.90+a GROUP 7....................$ 30.36 16.90+a GROUP 8....................$ 29.96 16.90+a GROUP 9....................$ 29.53 16.90+a GROUP 10....................$ 27.49 16.90+a GROUP 11....................$ 27.49 16.90+a GROUP 12....................$ 27.43 16.90+a GROUP 13....................$ 28.96 16.90+a GROUP 14....................$ 26.85 16.90+a GROUP 15....................$ 26.54 16.90+a GROUP 16....................$ 25.71 16.90+a GROUP 17....................$ 25.30 16.90+a GROUP 18....................$ 24.65 16.90+a Hazardous waste premium $3.00 per hour over classified rate. Crane with boom, including jib, 150 feet - $1.50 extra. Crane with boom, including jib, 200 feet - $2.50 extra. Crane with boom, including jib, 250 feet - $5.00 extra. Crane with boom, including jib, 300 feet - $7.00 extra. Crane with boom, including jib, 400 feet - $10.00 extra a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday. POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Crane handling or erecting structural steel or stone, hoisting engineer (2 drums or over), front end loader (7 cubic yards or over), work boat 26 ft. and over. GROUP 2: Cranes (100 ton capacity & over), Excavator over 2 cubic yards, piledriver ($3.00 premium when operator controls hammer). GROUP 3: Excavator, cranes (under 100 ton rated capacity), gradall, master mechanic, hoisting engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power or operation) Rubber Tire Excavator (drott 1085 or similar); Grader Operator; Bulldozer Fine Grade (slopes, shaping, laser or GPS, etc.) GROUP 4: Trenching machines, lighter derrick, concrete finishing machine, CMI machine or similar, Koehring Loader (skooper). GROUP 5: Specialty railroad equipment, asphalt spreader, asphalt reclaiming machine, line grider, concrete pumps, drills with self contained power units, boring machine, post hole digger, auger, pounder, well digger, milling machine (over 24' mandrel), side boom, combination hoe and loader, directional driller. GROUP 6: Front end loader (3 cu. yds. up to 7 cu. yards), bulldozer (Rough grade dozer) . GROUP 7: Asphalt roller, concrete saws and cutters (ride on types), Vermeer concrete cutter, stump grinder, scraper, snooper, skidder, milling machine (24" and under Mandrel). GROUP 8: Mechanic, grease truck operator, hydoblaster, barrier mover, power stone spreader, welder, work boat under 26 ft. transfer machine. GROUP 9: Front end loader (under 3 cubic yards), skid steer loader (regardless of attachments), bobcat or similar, forklift, power chipper, landscape equipment (including hydroseeder). GROUP 10: Vibratory hammer,ice machine, diesel & air, hammer, etc. GROUP 11: Conveyor, earth roller, power pavement breaker (whiphammer), robot demolition equipment. GROUP 12: Wellpoint operator. GROUP 13: Portable asphalt plant operator, portable concrete plant operator, portable crusher plant operator. GROUP 14: Compressor battery operator. GROUP 15: Power Safety boat, Vacuum truck, Zim mixer, Sweeper; (Minimum for any job requiring a CDL license) . GROUP 16: Elevator operator, tow motoroperator (solid tire no rough terrain). GROUP 17: Generator operator, compressor operator, pump operator,welding machine operator; Heater operator. GROUP 18: Maintenance engineer. ---------------------------------------------------------------- IRON0015-001 06/30/2008 Rates Fringes Ironworkers: (Ornamental, Reinforcing, Structural and Precast Concrete Erection).......$ 31.80 23.18+a PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day. ---------------------------------------------------------------- LABO0056-001 04/07/2008 Rates Fringes Laborers: (BUILDING CONSTRUCTION) GROUP 1.....................$ 23.25 14.00 GROUP 2.....................$ 23.50 14.00 GROUP 3.....................$ 23.75 14.00 GROUP 4.....................$ 24.10 14.00 GROUP 5.....................$ 24.00 14.00 GROUP 6.....................$ 26.25 14.00 GROUP 7.....................$ 24.25 14.00 GROUP 8.....................$ 23.75 14.00 GROUP 9.....................$ 23.25 14.00 LABORERS CLASSIFICATIONS GROUP 1: Laborers, carpenter tenders, wrecking laborers, fire watchers. GROUP 2: Mortar mixers, pipelayers (the pipelayer rate shall apply only to one or two employees of the total crew whose primary task is to actually perform the mating of pipe sections) plaster tenders, power buggy operators, powdermen, fireproofer/mixer/nozzleman. GROUP 3: Jackhammer/pavement breaker operators, mason tenders. GROUP 4: Licensed Pipelayers P6-P7 license (the pipelayer rate shall apply only to the one or two employees of the total crew whose primary task is to actually perform the mating of pipe sections). GROUP 5: Air track operators, Sand blasters. GROUP 6: Nuclear toxic waste removers, blasters. GROUP 7: Asbestos removal and encapsulation (except its removal from mechanical systems which are not to be scrapped). GROUP 8: Bottom men on open air caisson, cylindrical work and boring crew. GROUP 9: Top men on open air caisson, cylindrical work and boring crew. ---------------------------------------------------------------- LABO0056-003 04/07/2008 Rates Fringes Laborers: (HEAVY & HIGHWAY CONSTRUCTION) GROUP 1.....................$ 23.25 14.00 GROUP 2.....................$ 23.50 14.00 GROUP 3.....................$ 23.60 14.00 GROUP 4.....................$ 23.75 14.00 GROUP 5.....................$ 25.25 14.00 GROUP 6.....................$ 25.00 14.00 GROUP 7.....................$ 24.25 14.00 GROUP 8.....................$ 15.00 14.00 LABORERS CLASSIFICATIONS GROUP 1: Laborers (Unskilled). GROUP 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators and powdermen. GROUP 3: Pipelayers. GROUP 4: Jackhammer/Pavement breaker (handheld), mason tenders/catch basin builders, asphalt rakers, air track operators, block pavers and curb setters. GROUP 5: Toxic waste remover (non-mechanical systems). GROUP 6: Blasters. GROUP 7: Asbestos Removal, non-mechanical systems (does not include leaded joint pipe). GROUP 8: Traffic control signalmen. ---------------------------------------------------------------- LABO0056-004 04/07/2008 Rates Fringes Laborers: (TUNNEL CONSTRUCTION) CLEANING, CONCRETE AND CAULKING TUNNEL: Concrete Workers, Form Movers and Strippers.......$ 26.70 14.00+a Form Erectors..............$ 26.975 14.00+a ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: Brakemen, Trackmen, Tunnel Laborers, Shaft Laborers...................$ 26.70 14.00+a Laborers Topside, Cage Tenders, Bellman...........$ 26.60 14.00+a Miners.....................$ 27.50 14.00+a SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: Brakemen and Trackmen......$ 26.70 14.00+a Miners, Motormen, Mucking Machine Operators, Nozzlemen, Grout Men, Shaft and Tunnel, Steel and Rodmen, Shield and Erector, Arm Operator, Cable Tenders..............$ 27.50 14.00+a TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: Blaster....................$ 32.95 14.00+a Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders..............$ 32.78 14.00+a Change House Attendants, Powder Watchmen, Top on Iron Bolts.................$ 31.117 14.00+a Mucking Machine Operator...$ 33.45 14.00+a a. PAID HOLIDAYS: On tunnel work only: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. No employee shall be eligible for holiday pay when he fails, without cause, to work the regular work day preceding the holiday or the regular work day following the holiday. ---------------------------------------------------------------- PAIN0011-001 06/01/2008 Rates Fringes Painters: Blast and Spray.............$ 30.87 14.00 Brush and Roll..............$ 27.87 14.00 Paperhanger.................$ 28.37 14.00 Red Label...................$ 28.37 14.00 Tanks, Towers, Swing........$ 29.87 14.00 Taper.......................$ 28.62 14.00 ---------------------------------------------------------------- PAIN0011-003 06/01/2008 Rates Fringes Painters: (BRIDGE CONSTRUCTION) Brush, Roller, Blasting (Sand, Water, etc.) Spray...$ 37.65 14.20 ---------------------------------------------------------------- PAIN0011-010 06/01/2008 Rates Fringes Glaziers.........................$ 31.43 14.00+a a. PAID HOLIDAYS: Labor Day and Christmas Day. ---------------------------------------------------------------- PLUM0777-002 06/01/2008 Rates Fringes Plumbers and Pipefitters.........$ 35.37 19.71 ---------------------------------------------------------------- ROOF0009-001 01/01/2008 Rates Fringes Roofers: Composition.................$ 29.40 13.48 Slate and Tile..............$ 29.90 13.48 LITCHFIELD COUNTY Barkhamstead, Canaan, Colebrook, Cornwall, Goshen, Harwington, Litchfield, New Hartford, Norfolk, North Canaan, Salisbury, Sharon, Torrington, Winchester MIDDLESEX COUNTY NEW HAVEN COUNTY Cheshire, Meriden, Wallingford, Wolcott TOLLAND COUNTY WINDHAM COUNTY ---------------------------------------------------------------- ROOF0012-001 06/01/2008 Rates Fringes Roofers: Cole Tar Pitch..............$ 33.50 11.35+a Slate, Tile, Composition, Shingles, Single Ply and Damp/Waterproofing..........$ 32.00 11.35+a FAIRFIELD COUNTY; LITCHFIELD COUNTY Bethlehem, Bridgewater, Kent, Morris, New Milford, Roxbury, Thomaston, Warren, Washington, Watertown, Woodbury NEW HAVEN COUNTY Ansonia, Beacon Falls, Bethany, Branford, Derby, East Haven, Guilford, Hamden, Madison, Middlebury, Milford, Naugatuck, New Haven, North Branford, North Haven, Orange, Oxford, Prospect, Seymour, Southbury, Union City, Waterbury, West Haven, Woodbridge a. PAID HOLIDAYS: July 4th, Labor Day and Christmas Day provided the employee is employed 15 days prior to the holiday. ---------------------------------------------------------------- * SFCT0676-001 08/01/2008 Rates Fringes Sprinkler Fitters................$ 38.35 15.65+a a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday. ---------------------------------------------------------------- SHEE0038-002 07/01/2008 Rates Fringes Sheet Metal Worker Fairfield and Litchfield Counties....................$ 38.08 26.91 ---------------------------------------------------------------- SHEE0040-001 07/01/2008 Rates Fringes Sheet Metal Worker Middlesex, New Haven, Tolland and Windham Counties....................$ 30.57 24.50 ---------------------------------------------------------------- TEAM0064-001 04/01/2008 Rates Fringes Truck drivers: 2 Axle Ready Mix............$ 26.28 12.47+a 2 Axle......................$ 26.18 12.47+a 3 Axle Ready Mix............$ 26.33 12.47+a 3 Axle......................$ 26.28 12.47+a 4 Axle Ready Mix............$ 26.43 12.47+a 4 Axle......................$ 26.38 12.47+a Heavy Duty Trailer 40 tons and over....................$ 26.63 12.47+a Heavy Duty Trailer up to 40 tons.....................$ 26.38 12.47+a Specialized (Earth moving equipment other than conventional type on-the- road trucks and semi- trailers, including Euclids)....................$ 26.43 12.47+a Hazardous waste removal work receives additional $1.25 per hour. a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day and Good Friday, provided the employee has at least 31 calendar days of service and works the last scheduled day before and the first scheduled day after the holiday, unless excused. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION