General Decision Number: WA080084 09/25/2009 WA84 State: Washington Construction Type: Heavy including water and sewer line construction County: Clallam County in Washington. HEAVY CONSTRUCTION PROJECTS (including sewer/water construction). Modification Number Publication Date 0 09/25/2009 CARP0770-001 06/01/2009 Rates Fringes CARPENTER........................$ 35.39 13.08 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend Zone Pay: 0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour ---------------------------------------------------------------- ELEC0046-006 06/01/2009 Rates Fringes ELECTRICIAN......................$ 40.81 3%+15.71 ---------------------------------------------------------------- ENGI0302-001 06/01/2009 Rates Fringes Power equipment operators: Group 1A...................$ 35.79 15.15 Group 1AA..................$ 36.36 15.15 Group 1AAA.................$ 36.92 15.15 Group 1.....................$ 35.24 15.15 Group 2.....................$ 34.75 15.15 Group 3.....................$ 34.33 15.15 Group 4.....................$ 31.97 15.15 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe, Backhoes: Over 90 metric tons GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; excavator/Trackhoe, backhoes: over 50 metric tons to 90 metric tons GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;; Excavator/Trackhoe, backhoes: over 30 metric tons to 50 metric tons; Loader- overhead 6 yards to, but not including 8 yards; Dozer D-10 GROUP 2 - Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 44 tons;; Excavator/Trackhoe, backhoe: 15 to 30 metric tons; Loaders-overhead under 6 yards; Mechanic; Drilling Machine; Grader (finishing) GROUP 3 - Cranes-thru 19 tons with attachments; A-frame crane over 10 tons;; Dozers-D-9 and under; Roller-Plant Mix; Excavator/Trackhoe, backhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments; Oiler; Grader (non-finishing);Boom Truck over 10 tons GROUP 4 - Cranes-A frame-10 tons and under; Roller-other than plant mix; Forklift: under 3000 lbs with attachments; Boom Truck 10 tons and under ---------------------------------------------------------------- IRON0086-012 07/01/2009 Rates Fringes Ironworker (REINFORCING & STRUCTURAL).......$ 36.62 17.40 ---------------------------------------------------------------- LABO0001-001 06/01/2009 ZONE 1: Rates Fringes Laborers: GROUP 2.....................$ 24.86 9.07 GROUP 3.....................$ 30.96 9.07 GROUP 4.....................$ 31.70 9.07 GROUP 5.....................$ 32.21 9.07 ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall LABORERS CLASSIFICATIONS GROUP 2: Flagger GROUP 3: General or Common Laborer; Mason Tender-Cement/Concrete; Chipping Guns (Under 30 lbs) GROUP 4: Grade Checker; Pipe Layer; Chipping Guns (Over 30 lbs); Groutmen GROUP 5: Mason Tender-Brick ---------------------------------------------------------------- PAIN0005-008 03/01/2009 Rates Fringes PAINTER (Brush, Roller and Spray)...........................$ 20.82 7.44 ---------------------------------------------------------------- PLAS0528-004 06/01/2009 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 35.75 13.40 ---------------------------------------------------------------- SUWA2009-035 08/07/2009 Rates Fringes LABORER: Landscape..............$ 14.67 0.00 PIPEFITTER.......................$ 30.00 8.35 TRUCK DRIVER: 10 Yard Truck....$ 24.61 8.34 TRUCK DRIVER: Water Truck.......$ 24.36 8.30 ---------------------------------------------------------------- TEAM0174-002 06/01/2009 Rates Fringes Truck drivers: ZONE A: GROUP 1:...................$ 31.87 14.60 GROUP 2:...................$ 31.03 14.60 ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates. ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates. *Zone pay will be calculated from the city center of the following listed cities: BELLINGHAM CENTRALIA RAYMOND OLYMPIA EVERETT SHELTON ANACORTES BELLEVUE SEATTLE PORT ANGELES MT. VERNON KENT TACOMA PORT TOWNSEND ABERDEEN BREMERTON TRUCK DRIVERS CLASSIFICATIONS GROUP 1 - Dump Trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment. GROUP 2 - Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with less than 16 yards capacity. HAZMAT PROJECTS Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit." LEVEL A: +$.75 per hour - This level utilizes a fully- encapsulated suit with a self-contained breathing apparatus or a supplied air line. ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION