General Decision Number: WA080083 11/06/2009 WA83 State: Washington Construction Type: Heavy including water and sewer line construction County: Adams County in Washington. HEAVY CONSTRUCTION PROJECTS (including sewer/water construction). Modification Number Publication Date 0 09/25/2009 1 10/02/2009 2 10/23/2009 3 11/06/2009 * CARP0001-007 09/01/2009 Rates Fringes CARPENTER (Including Form Work)............................$ 27.73 10.56 ZONE PAY: ZONE 1 0-40 MILES FREE ZONE 2 41-65 MILES $2.25/PER HOUR ZONE 3 66-100 MILES $3.25/PER HOUR ZONE 4 OVER 100 MILES $4.75/PER HOUR DISPATCH POINTS: CARPENTERS/MILLWRIGHTS: PASCO (2819 W. SYLVESTER) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite). HAZMAT PROJECTS: Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows: LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal. LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit." LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line. ---------------------------------------------------------------- CARP0001-015 09/01/2009 Rates Fringes MILLWRIGHT.......................$ 29.73 10.56 ZONE PAY: ZONE 1 0-40 MILES FREE ZONE 2 41-65 MILES $2.25/PER HOUR ZONE 3 66-100 MILES $3.25/PER HOUR ZONE 4 OVER 100 MILES $4.75/PER HOUR DISPATCH POINTS: CARPENTERS/MILLWRIGHTS: PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite). HAZMAT PROJECTS: Anyone working on a HAZMAT job (task, where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows: LEVEL D+ $.25 per hour - This is the lowest level of proection. No respirator is used and skin proection is minimal. LEVEL C+ $.50 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B+ $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit." LEVEL A+ $1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line. ---------------------------------------------------------------- ELEC0073-002 07/01/2009 Rates Fringes ELECTRICIAN......................$ 28.22 3%+12.98 ---------------------------------------------------------------- ELEC0077-001 02/01/2007 Rates Fringes Line Construction: LINEMEN.....................$ 37.58 3.875%+$10.60 ---------------------------------------------------------------- ENGI0370-004 06/01/2009 Rates Fringes Power equipment operators: GROUP 1.....................$ 23.76 11.05 GROUP 2.....................$ 24.08 11.05 GROUP 3.....................$ 24.69 11.05 GROUP 4.....................$ 24.85 11.05 GROUP 5.....................$ 25.01 11.05 GROUP 6.....................$ 25.29 11.05 GROUP 7.....................$ 25.56 11.05 GROUP 8.....................$ 26.66 11.05 ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Rollers, all types on subgrade, including seal and chip coatings GROUP 2: Fork Lift GROUP 3: Bulldozer (up to D-6 or equivalent) GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T); Oiler GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Cranes (25 tons & under); Boom Truck (Under 25 tons) GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Grader/Blade GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over) BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ---------------------------------------------------------------- IRON0014-001 07/01/2009 Rates Fringes IRONWORKER (Reinforcing and Structural)......................$ 30.79 17.40 ---------------------------------------------------------------- LABO0238-002 06/01/2009 Rates Fringes Laborers: GROUP 1.....................$ 20.56 8.75 GROUP 2.....................$ 22.66 8.75 GROUP 3.....................$ 22.93 8.75 GROUP 4.....................$ 23.20 8.75 Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office LABORERS CLASSIFICATIONS GROUP 1: Flagger GROUP 2: Common or General Laborer; GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping Guns GROUP 4: Grade Checker ---------------------------------------------------------------- LABO0238-007 06/01/2009 Rates Fringes Laborer, Mason Tender Brick......$ 24.10 8.75 ---------------------------------------------------------------- PAIN0005-003 07/01/2008 Rates Fringes PAINTER (Brush, Roller, and Spray.)..........................$ 15.09 6.68 ---------------------------------------------------------------- SUWA2009-034 08/07/2009 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00 LABORER: Landscape..............$ 14.67 0.00 OPERATOR: Drill.................$ 28.15 8.20 PIPEFITTER.......................$ 25.98 3.98 TRUCK DRIVER: 10 Yard Truck....$ 24.61 8.34 TRUCK DRIVER: Dump Truck........$ 19.67 0.00 TRUCK DRIVER: Water Truck.......$ 24.36 8.30 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ======================================================== Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)). ---------------------------------------------------------------- -- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- -- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION